Specifications
Cold Water Supply
Dynamic Water Pressure
Min: 0.2 bar
Max: 5.0 bar
3.0
3.0
2.0
2.0
4.0
4.0
1.0
1.0
0.
5.0
0.
5.0
Min: 5°C Max: 25°C
Pressure
Pressure
BAR
BAR
IMPORTANT
Maximum Static Pressure: 10.0 bar
Socket
Cross Head
Adjustable
Drill
Spanner
Screwdriver
Spanner
Prior to Installation
All products manufactured and supplied by Bristan are safe to use
provided that they are installed, operated and receive regular
maintenance in accordance with these instructions.
This product needs to be installed in accordance with, and meet the
requirements of the Water Supply (Water Fittings) Regulations 1999
and current by-laws. For full Installation Requirements & Notes (IRN)
please visit wras.co.uk/directory.
Isolation valves must be fitted to the inlet water supplies to ensure ease
of future maintenance. Before installing this product the water supply
must be thoroughly flushed in order to remove any swarf, solder etc.
Full access must be made available for future maintenance/
servicing purposes.
Before drilling into walls, check that there are no hidden electrical
wires, cables or water supply pipes. This can be checked with the
aid of an electronic detector.
If power tools are used do not forget to:
- Wear eye protection
- Unplug equipment after use
This product must not be modified in any way
as this will invalidate the guarantee.
If in doubt, contact a registered plumber, your Local Water
Authority or the Secretary of the Institute of Plumbing,
address as follows:-
The Institute of Plumbing,
64 Station Lane,
Hornchurch,
Essex,
RM12 6NB, Tel: 01708 472791
Installation Instructions
& User Guide
Please leave these instructions
with the end user
Product Code: SAF SHCDIV C (D1)
Inlet Dimensions
Inlet Water Temperature
Hot Water Supply
65°C
25°C
5°C
65°C Recommended
The inlet hot water must
be at least 10°C above the
required blend temperature.
Pipe & Wire
Pipe Cutter
Silicon Sealant
Hexagonal Keys
Detector
Cavity Dimensions (mm)
Minimum
Fitting Depth: 60mm
Maximum
Fitting Depth: 75mm
Concealing Plate
Adjustment Range: 15mm
Pack Contents
x1
x1
x2
x1
x2
Valve Configuration
1
Yellow Flow
Limiter (Hot)
Installation
150
1
Centres
Rear access to the
Inlet Connections
shower is required
15mm
Compression
Prepare the pipework.
Create the rear access point in
the back of the wall cavity.
4
Spirit Level
Hot
Connect the inlet
pipes ensuring the
olives are fitted.
7
15
60
Fit the handles.
x1
x2
2
Increase
Temperature
x1
x2
x1
Green Flow
Limiter (Cold)
Remove the inlet elbows and filters.
Remove the plastic inserts from the valve
inlets and insert the flow regulators.
Replace the elbows, ensuring the
filters are fitted.
2
Install suitable
Cavity Space
batons (if required)
75mm
into the cavity.
Take the finished
60mm
wall surface into
consideration when
IMPORTANT
fitting the valve
into the cavity.
Baton
Mark the position
for maintenance
of the valve; drill
and servicing
and plug holes
Rear
to suit.
Access
Point
5
Cold
Plumb your chosen
outlets into the valve.
Turn on the water
supply and check the
valve for any leaks.
Temperature Adjustment
1
2.5
mm
3
Turn the spindle
to increase or
decrease the
temperature.
Check the
temperature and
temperature
Decrease
adjust until you
handle back in
Temperature
the maximum
achieve the
hot position.
desired result.
2
Screw the shrouds
onto the valve.
3
Ensuring
the valve
is straight,
secure the
valve using
the screws
supplied
(solid walls
only) or
a suitable
alternative.
6
Draw around
the concealing
plate as a template,
measuring in by
10mm to give
clearance. Finish the
wall surface. Using a
silicon sealant, push
on the concealing
plate and hold
firmly until set.
Turn the handle
to the maximum
temperature setting,
then remove it.
2.5
mm
Fit the
2.5
mm
Need help?
Do you have a question about the SAF SHCDIV C D1 and is the answer not in the manual?
Questions and answers