Page 2
Follow the steps below to perform the Out Of the Box Test. Step 1 - Attach the 95W DC Power Adapter to the 821Q Injector unit and to your AC outlet. The Power LED will indicate the unit is receiving power as well as the 95W 56V DC Power Adapter LED.
Page 3
First examine the backbone wiring pair and make sure you have solid connections. The Interlink Sync LED will be lit solid Green on each 821Q unit. The units sync instantly and have no delay. if either fail to light up…. Then follow the steps below: 1) Make sure your wiring is straight through and not connected to any Telco punch down blocks;...
Page 4
Returning Products for Warranty Repair Enable-IT warrants to the original purchaser of this described Product ("you" or the "End User") that, for the limited lifetime period commencing on the date the Product was purchased (the “Warranty Period"), the Product will be substantially free from defects in materials and workmanship under normal use and conditions.
Need help?
Do you have a question about the 821Q and is the answer not in the manual?
Questions and answers