2.
Drill six holes (8mm in diameter and 55mm in depth) on the marked positions on the cardboard. Install the provided expansion bolts
into the drilled holes.
3.
Use two M5*14 screws to install two locking brackets to the mounting ears on the top of the battery pack. Place the base battery
onto the floor. Make sure that:
⚫
The battery feet are aligned with the vertical black line on the cardboard.
⚫
It is recommended to use a gradienter to make sure that the battery is placed horizontally.
⚫
The space between the battery back and the wall surface is 40–50 mm.
V1.0
21
© 2024 Sanjing. All rights reserved.
Need help?
Do you have a question about the HS3 T2 Series and is the answer not in the manual?
Questions and answers