Download Print this page

SAJ HS3 T2 Series Quick Manual page 21

Advertisement

2.
Drill six holes (8mm in diameter and 55mm in depth) on the marked positions on the cardboard. Install the provided expansion bolts
into the drilled holes.
3.
Use two M5*14 screws to install two locking brackets to the mounting ears on the top of the battery pack. Place the base battery
onto the floor. Make sure that:
The battery feet are aligned with the vertical black line on the cardboard.
It is recommended to use a gradienter to make sure that the battery is placed horizontally.
The space between the battery back and the wall surface is 40–50 mm.
V1.0
21
© 2024 Sanjing. All rights reserved.

Advertisement

loading
Need help?

Need help?

Do you have a question about the HS3 T2 Series and is the answer not in the manual?

Questions and answers