CH2-(29.9K-63K)-(T4,T5,T6)
V0.0

Advertisement

loading
Need help?

Need help?

Do you have a question about the CH2 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for SAJ CH2 Series

  • Page 1 CH2 Series Series SAJ HYBRID SOLAR INVERTER USER MANUAL Tel: (86)20 66608588 Fax: (86)20 66608589 Web: www.saj-electric.com GUANGZHOU SANJING ELECTRIC CO.,LTD Add: SAJ Innovation Park,No.9, Lizhishan Road,Science City, Guangzhou High-tech Zone , Guangdong, P.R.China CH2-(29.9K-63K)-(T4,T5,T6) V0.0...
  • Page 2 CH2 Series Preface Thank you for choosing SAJ products. We are pleased to provide you first-class products and exceptional service. This manual includes information for installation, operation, maintenance, trouble shooting and safety. Please follow the instructions of this manual so that we can ensure delivery of our professional guidance and wholehearted service.
  • Page 3 CH2 Series TABLE OF 4.2 Installation Method and Position ........................15 4.2.1 Installation Position and Clearance ..................15 4.2.2 Mounting Method ........................16 CONTENTS 4.3 Mounting Procedure ............................. 17 4.3.1 Installation Tools.......................... 17 4.3.2 Mounting Procedure ........................18 5. ELECTRICAL CONNECTION ......................... 21 5.1 Additional Grounding Cable ..........................
  • Page 4 CH2 Series 6.1.1 Start Up ............................40 6.1.2 Shut Down ............................ 40 6.2 Introduction of Human-computer Interface ....................40 6.3 Installing the eSAJ Home App ........................... 42 6.4 Log g ing I n to the App and Performing the Ini tialization Settings ............42 6.5 Inverter Setting Review ............................
  • Page 5 CH2 Series 1.1 Scope of Application This User Manual describes instructions and detailed procedures for installing, operating, maintaining, and troubleshooting of the following SAJ products: CH2-29.9K-T4; CH2-30K-T4; CH2-40K-T5; CH2-50K-T6; CH2-63K-T6; 1.2 Safety Instructions DANGER · DANGER indicates a hazardous situation which, if not avoided, will result in death or serious injury.
  • Page 6 SAJ is not responsible for the loss and these warranty claims. ·The SAJ inverter must only be operated with PV generator. Do not connect any other source of energy to the SAJ inverter.
  • Page 7 CH2 Series 2.2 Explanations of Symbols Danger to life due to high electrical voltage! There might be residual currents in inverter because of large capacitors. Wait 5 MINUTES before you remove the front lid. Symbol Description Dangerous electrical voltage This device is directly connected to public grid, thus all work to the battery shall only be carried out by qualified personnel.
  • Page 8 3.1 Application Scope of Products CH2 series is a hybrid photovoltaic inverter and it is applicable to both on-grid and off-grid solar systems. The energy generated by PV system will be fed to loads first, and then the surplus energy can charge the battery for later use, if there is still excess more energy, it will be exported to the grid.
  • Page 9 CH2 Series 3.2 Specification for Product Model 3.4 Terminals Description CH2 – XK – TX ① ② ③ ① CH2 represents for product name. ② XK represents rated energy XkW of inverter, for example, 30K means 30kW. ③ T means three phase; X represents the inveter has the function of X MPP trackers Figure 3.3...
  • Page 10 CH2 Series 3.5 Datasheet Model CH2-29.9K-T4 CH2-30K-T4 CH2-40K-T5 CH2-50K-T6 CH2-63K-T6 Max. Apparent Power [VA] 29999 33000 44000 55000 63000 Model CH2-29.9K-T4 CH2-30K-T4 CH2-40K-T5 CH2-50K-T6 CH2-63K-T6 Peak Output Apparent Power [VA] 29999 45000,5s 60000,5s 75000,5s 75000,5s DC Input Rated AC Voltage [V] 3+N+PE/3+PE, 380/400 Max.
  • Page 11 4.1 Unpacking and Inspection 4.1.1 Checking the Package Although SAJ’s products have thoroughly tested and checked before delivery, there is possibility that the products may suffer damages during transportation. Please check the package for any obvious signs of damage, and if such evidence is present, do not open the package and contact your dealer as soon as possible.
  • Page 12 CH2 Series 4.2 Installation Method and Position 4.2.2 Mounting Method 4.2.1 Installation Position and Clearance This device is cooled by natural convention and suggested an indoor installation or an installation under a sheltered place to prevent the product from exposure to direct sunlight, rain and snow erosion.
  • Page 13 CH2 Series 4.3.2 Mounting Procedures • Keep the device from water sources such as taps, sewer pipes and sprinklers to prevent water seepage. • The product is to be installed in a high traffic area where the fault is likely to be seen.
  • Page 14 CH2 Series 3. Secure the Screws and the Rear Panel The panels should be secured onto the mounting position by screws as shown in Figure 4.6. Figure 4.6 Secure the panel 4. Mount the Inverter Carefully mount the inverter into the rear panel as shown in Figure 4.7. Make sure that the rear part of the equipment is closely mounted into the rear panel.
  • Page 15 CH2 Series 5.1 Additional Grounding Cable Electrical connection must only be operated by professional technicians. Before connection, necessary protective equipment must be employed by technicians, including insulating gloves, insulating shoes and safety helmet. WARNING · Connect this additional grounding cable before other electrical connection.
  • Page 16 CH2 Series 5.2 Communication Connection 5.2.2 Dry Contact Connection Reserved output dry contact AC Breaker D RY.DO1 D RY.DO2 NC COM NO N O COM NC Inverter Figure 5.3 Ports definition 5.2.1 Export Limit Setting Loads Figure 5.5 The meter communication cable can be connected to the Meter_485 of the Phoenix terminal of the inverter and the METER interface of the RJ45.
  • Page 17 CH2 Series 5.2.5 Emergency Stop Dry Contact 5.2.3 RCR Connection When + contact and - contact are shorted by external controlled switch, the inverter will stop immediately. RCR provides RCR signal control ports to meet the power grid dispatching requirements in Germany and DRY_DI1: Reserved input dry contact.
  • Page 18 CH2 Series Cable cross-sectional area(mm²) RS485_PAR1/RS485_PAR2 METER Type Conductor material RS485-B Range Recommend RS485-A CH2-29.9~63K-T4/T5/T6 16~25 Copper Grounding cable cross-sectional area (mm²): 25 RS485-B RS485-A Table 5.2 Recommended specifications of GEN and Back-up cables RS485-A RS485-A RS485-A Note: If the grid-connection distance is too far, please select an AC cable with larger diameter as per the...
  • Page 19 CH2 Series Inverter type Recommended breaker specification Step 3: Secure all parts of the grid and backup connector tightly. CH2-29.9~63K-T4/T5/T6 200A Notice: Do not connect multiple inverters to one AC circuit breaker. Table 5.3 Recommended circuit breaker specification 5.4 PV Side Connection WARNING ·...
  • Page 20 CH2 Series 4. Insert the positive and negative cable into positive and negative connector. Gently pull the cables backward DC connector is made up of positive connector and the negative connector to ensure firm connection. Figure 5.14 Positive connector & Negative connector NOTICE ·...
  • Page 21 CH2 Series 5.5 Communication Module Installation 5.7 Battery Connection Plug in the communication module to 4G/WIFI port and secure the module by rotating If lithium battery is connected, it is not required to install a breaker between battery and inverter.
  • Page 22 CH2 Series 6. Fix the battery cable on the battery copper terminal by positive and negative in order. 5.9 System Connection The system connection in Australia and New Zealand is as below, the neutral cable of AC and backup side must be connected together for the safety reason.
  • Page 23 CH2 Series 5.10 System Connection Diagram The system connection for grid system without special requirements is as below. Note:The backup PE line and earthing bar must be grounded properly. Otherwise, backup function may be inactive during blackout. 5.11 AFCI The inverter is equipped with arc-fault circuit interrupter (AFCI). With AFCI protection, when there is an arc signal on the DC side due to aging of the cable or loose contact, inverter can quickly detect and cut off the power to prevent fire, making the PV system run more safely.
  • Page 24 CH2 Series 6.1 Start Up and Shut Down the Energy Storage System 6.1.1 Start Up Step 1: Turn on the circuit breaker Step 2: Press and hold the main switch for 2-3s,until the display is on 6.1.2 Shut Down Automatically shut down, when the solar light intensity is not strong enough during sunrise and sunset or the output voltage of photovoltaic system is less than the minimum input power of inverter, inverter will shut down automatically.
  • Page 25 CH2 Series Description LED indicator Status Solid Both BMS and meter communication are good On 1s, off 1s Meter communication is good, BMS communication is lost LED indicator Status Description On 1s, off 3s Meter communication is lost, BMS communication is good...
  • Page 26 CH2 Series b. Go to the Tool interface and select Remote Configuration. Click on Bluetooth and enable the Bluetooth function on your mobile phone. Then, click on Next. 2. Choose your inverter according to your inverter SN. Click on the inverter to enter inverter settings.
  • Page 27 CH2 Series 6.5 Inverter Setting Review After commissioning, the device info including device basic info, running info and event info can be viewed. Country and grid code.
  • Page 28 CH2 Series 6.6 Remote Monitoring Back-up Mode: Reserved Backup SOC setting value can be adjusted, when battery SOC is less than reserved SOC value, battery can only be charged, until SOC reaches reserved value, the battery will be Connect the internet via the eSolar AIO3 module, and upload the inverter data onto the stopped charging;...
  • Page 29 40 minutes. After the self-test is completed, you can save the test report. If self-test is Method 1: Export limitation setting is to control the export electricity to the grid. failed, please contact with SAJ or your inverter supplier. Method 2: Generation limit is to control the electricity generated by the inverter.
  • Page 30 CH2 Series 6.10 Setting Reactive Power Control Fixed Reactive Power Mode (For Australia) 6.10.1 Setup Fixed Power Factor Mode & Fixed Reactive Power Mode Fixed Power Factor Mode Step 1: Select Inductive Adjustment Var or Capacitive Var according to your local grid regulation. The power range is from -60%Pn ~ 60%Pn.
  • Page 31 Note: Setting procedure: With regard to the Power rate limit mode, SAJ sets the product WGra to 16.67%Pn by default in the 1. AS4777 grid compliance has been set during production, please select corresponding grid compliance following cases according to the requirements of 3.3.5.2 as 4777.2: 2020.
  • Page 32 CH2 Series 7.1 Transportation Take care of the product during transportation and storage, keep less than 4 cartons of inverter in one stack. 7.2 Recycling and Disposal TRANSPORTATION This device should not be disposed as residential waste. An inverter that has reached the end of its life and is not required to be returned to your dealer, it must be disposed carefully by an approved collection and recycling facility in your area.
  • Page 33 CH2 Series Inverter Cleaning Clean the enclosure lid and LED indicator of the inverter with moistened cloth with clear water only. Do not use any cleaning agents as it may damage the components. Heat Sink Cleaning Clean the heat sinks with dry cloth or air blower. Do not clean the heat sink with water or cleaning agents.
  • Page 34 CH2 Series Troubleshooting Code Fault Information Code Fault Information Master Bus Voltage Low Master Relay Error Master Grid Phase Lost Master EEPROM Error Master PV Voltage High Master Temperature High Error Master Islanding Error Master Temperature Low Error Master HW Bus Voltage High Lost Communication M<->S...
  • Page 35 Slave No Grid Error Slave PV Input Mode Error Slave HW PV Curr High Slave PV Voltage High Please go to SAJ website for warranty conditions and terms https://www.saj-electric.com/ Slave HW Bus Volt High Lost Communication D<->C Master Arc Device Error...