cable insulation.
5. Always connect safety ground cable to a proper ground. Do not rely on a possible
grounded neutral somewhere else in the system.
6. Do not let equipment operate unattended for long periods of time.
7. Do not store or operate in rain adequate protection is provided.
8. Routinely inspect all components and electrical connections for tightness and
integrity.
9. Repair any damaged or degraded components and wiring without delay.
If technical assistance, service or parts are needed, please call 800-837-8603 (24 Hours).
5.3 Wiring Connections
Using the connection chart found on the Swift-E and Swift-E+ Load Banks nameplates
(Figure 2), wire the load bank to the desired source for testing.