4 Installing into the Rack

Overview of Installation into Rack

If the HP NetServer is not yet mounted in the Compaq rack, do the following to
mount it:
Remove the power supply modules.
l
Mount the HP NetServer on the slides.
l
Reinstall the power supply modules.
l
After the HP NetServer is mounted in the rack, do the following to install the
Compaq rack-optimized front bezel:
Install the nameplate on the front bezel.
l
Install the front bezel.
l

Remove Power Supply Modules

WARNING
The lifting handles are mounted on the sides of the
HP NetServer forward of the center of balance. Safe handling
of the HP NetServer requires that the power supply modules
be removed from the rear of the HP NetServer prior to
installation in the rack enclosure.
Remove all power supply modules before lifting the
HP NetServer.
Use at least two people when moving the HP NetServer or
lifting it into the rack. Use enough people for safety.
The HP NetServer LXr 8000 weighs up to 130 pounds (59 kg)
when fully configured.
The HP NetServer LXr 8500 weighs up to 155 pounds (70 kg)
when fully configured.