Download Print this page

Sentry Buildings THE PINEWOOD Assembly Book

14'x20' building
Hide thumbs Also See for THE PINEWOOD:

Advertisement

Quick Links

Sentry Buildings
Assembly Book
!e#ise& (e)te+,er ./ 0102
the Pinewood
3245014 67i8&ing
Manufactured by RBS Holdings, LLC
205 Arlington Drive
Greenville, PA 16125
;<is +=n7=8 is >?)@rig<te&A Bn&er t<e >?)@rig<t 8=Cs/ t<is +=n7=8
+=@ n?t ,e >?)ie&/ in C<?8e ?r in )=rt/ Cit<?7t >?nsent Dr?+
!6( E?8&ings/ FFC
H C?)@rig<t 0100

Advertisement

loading
Need help?

Need help?

Do you have a question about the THE PINEWOOD and is the answer not in the manual?

Questions and answers

Summary of Contents for Sentry Buildings THE PINEWOOD

  • Page 1 Sentry Buildings Assembly Book !e#ise& (e)te+,er ./ 0102 the Pinewood 3245014 67i8&ing Manufactured by RBS Holdings, LLC 205 Arlington Drive Greenville, PA 16125 ;<is +=n7=8 is >?)@rig<te&A Bn&er t<e >?)@rig<t 8=Cs/ t<is +=n7=8 +=@ n?t ,e >?)ie&/ in C<?8e ?r in )=rt/ Cit<?7t >?nsent Dr?+ !6( E?8&ings/ FFC...
  • Page 2 MPORTANT NFORMATION BOUT ;<=nQ @?7 D?r )7r><=sing ?7r QitA O8e=se re=& t<e D?88?Cing inD?r+=ti?n ,eD?re ,eginning >?nstr7>ti?nA M8C=@s ><e>Q Cit< @?7r 8?>=8 ETM ?r ,7i8&ing >?&e ?DDi>e D?r =n@ reR7ire+ents ?r restri>ti?nsA K8??rU ]??& D8??ring is s?8& ?)ti?n=88@A ^?7 +=@ ><??se t? ,7i8& @?7r ?Cn ?r )?7r = >e+ent )=&A Always wear safety glasses when cutting or nailing! ;??8s !eR7ire&U E=n&...
  • Page 3 Suggested Constructing Details for Heavy Duty Floor System Do Not +=Qe t<e D?7n&=ti?n 8=rger t<=n 324 5 014A C<e>Q 8?>=8 ,7i8&ing >?&es/ t<e >?nstr7>ti?n +=@ <=#e t? ><=ngeA De)en&ing ?n @?7r inten&e& 7se = >e+ent s8=, +=@ ,e +?re =))r?)ri=teA 2x4-2' Blocks 3A C7t X0Y tC? 052IL4 ,?=r&s int? 04 8?ng ,8?>QsA 67tt X0Y tC? 252I314 ti+,ers t?get<er t? +=Qe...
  • Page 4 Constructing Details for Floor System continued Stagger Solid Blocking over Center Runners .A C7t 8eDt?#er 05W ,?=r&s t? 8engt< =n& inst=88 ,etCeen t<e D8??r a?ist ?#er t<e >enter 252 r7nnersA (t=gger t<e 05W ,8?>Qs t? +=Qe it e=sier t? n=i8 t<e ,8?>Q ,etCeen t<e a?istA 31A bt is i+)?rt=nt t<=t t<e D8??r ,e 8e#e8 =n&...
  • Page 5 Step 1 Assemble (1) One 8' Back Wall Frame 3A C7t/ iD ne>ess=r@/ X0Y tC? 052IL4 X?ne Ci88 ,e tre=te&Y t? = 8engt< ?D .WeA O?siti?n t<e ,?=r&s t?get<er =n& in&i>=te Cit< 4f4 +=rQs C<ere t<e C=88 st7&s Ci88 ,e 8?>=te&A 96"...
  • Page 6 Step 2 Assemble (1) One 8' Frame w/ Window Openings 3A C7t/ if necessary/ X0Y tC? 052IL4 X?ne Ci88 ,e tre=te&Y t? = 8engt< ?D .WeA O?siti?n t<e ,?=r&s t?get<er =n& in&i>=te Cit< 4f4 +=rQs C<ere t<e C=88 st7&s Ci88 ,e 8?>=te&A 96"Top Wall Plate 96"...
  • Page 7 Step 3 Assemble 12' Front Wall Frame 3A ;ri+/ if necessary/ X0Y tC? 052I304 ,?=r&s X?ne Ci88 ,e tre=te&Y t? = 8engt< ?D 322eA O?siti?n t<e ,?=r&s t?get<er =n& in&i>=te Cit< 4f4 +=rQs C<ere t<e C=88 st7&s Ci88 ,e 8?>=te&A J=rQ =n 4(4 ?n ,?tt?+ )8=te C<ere t<e &??r <e=&er s7))?rts Ci88 ,e 8?>=te&A See drawing below.
  • Page 8 Step 4 Assemble 12' Back Wall Frame 3A C7t/ if necessary/ X0Y tC? 052I304 X?ne Ci88 ,e tre=te&Y t? = 8engt< ?D 322eA O?siti?n t<e ,?=r&s t?get<er =n& in&i>=te Cit< 4f4 +=rQs C<ere t<e C=88 st7&s Ci88 ,e 8?>=te&A 144"Top Wall Plate 144"...
  • Page 9 Step 5 Assemble a 13'-5" Long End Wall Frame If 2x4-14' boards are not available 16' long 2x4 will be substituted. 3A C7t X0Y tC? 052I324 X?ne Ci88 ,e tre=te&Y t? = 8engt< ?D 3W3eA O?siti?n t<e ,?=r&s t?get<er =n& in&i>=te Cit< 4f4 +=rQs C<ere t<e C=88 st7&s Ci88 ,e 8?>=te&A 161"...
  • Page 10 Step 7 Assemble a 13'-5" Long End Wall Door Frame 3A C7t X0Y tC? 052I324 X?ne Ci88 ,e tre=te&Y t? = 8engt< ?D 3W3eA O?siti?n t<e ,?=r&s t?get<er =n& in&i>=te Cit< 4f4 +=rQs C<ere t<e C=88 st7&s Ci88 ,e 8?>=te& =n& =n 4(4 C<ere t<e &??r <e=&er s7))?rt st7&s Ci88 ,e 8?>=te&A See drawing belowA 0A Msse+,8e t<e Dr?nt C=88 Dr=+e 7sing t<e C=88 )8=tes >7t =,?#e =n&...
  • Page 11 Step 8 Install Wall Frames & 2x4 Tie Plates The 13'-5" long wall frames are positioned between 8' side walls. 3A Pre>t t<e 3c4INe 8?ng C=88 Dr=+e Cit<?7t &??r ?)ening ?n t<e en& ?D t<e D8??rA bJOT!;M[;U +=Qe s7re Dr=+es =re sR7=re =n& )87+,A 8' Back Wall Frame 0A bnst=88 t<e L4 8?ng C=88 Dr=+es ?n t<e ,=>Q si&e ?D t<e D8??rA...
  • Page 12 Step 9 Install Siding Install siding with a damage edge at a corner where it will be covered with corner trim. If installing building on concrete slab, install siding flush with the bottom plate. For wood floor, extend siding 3/4" below bottom plate. 3A (e8e>t X0Y 25L si&ing )=ne8s =n&...
  • Page 13 Step 10 Install 2x8 Joist Headers on Back Walls 3A C7t = L4 8?ng 05L ,?=r& t? .3eA bnst=88 t<is 05L t? t<e L4 ,=>Q C=88 )=ne8/ =g=inst t<e 3c4INe en& C=88 Cit<?7t &??r ?)eningA bnst=88 t<e 05L D87s< Cit< t<e t?) ?D t<e 052 tie )8=teA (e>7re Cit< X0Y tC? r?Cs ?D 31&...
  • Page 14 Step 11 Install 2x8 Floor Joist 3A bnst=88 a?ist <=ngers/ on all 2x8 joist headers/ ?#er t<e 4f4 +=rQs/ D87s< Cit< t<e ,?tt?+ ?D t<e 05LsA Bse 3I3g0e <=nger n=i8sA Joist Hanger If 2x8-14' boards are not available 16' long 2x8 will be substituted. 0A C7t = 05LI324 t? 3W3e =n&...
  • Page 15 Step 12 Install Loft Flooring C7t X0Y tC? 02e 5 .We D8??r )=ne8s Dr?+ = NgLe 5 245L4 s<eetA (ee Det=i8 4M4A DETAIL 'A' 24" x 96" 24" x 96" 0A bnst=88 NgLe t<i>Q s<eets/ per layout below/ D87s< Cit< t<e 052 C=88 )8=tesA (e>7re t<e D8??ring Cit<...
  • Page 16 Step 13 Install Trim on End Walls IMPORTANT: Trim Must Be Installed Before Installing Roof Gables! De)en&ing ?n t<e )reI>7t st7& 8engt< =n& iD t<e si&ing e5ten&s ,e8?C t<e ,?tt?+ )8=te/ @?7 +=@ <=#e = s)=>e ,etCeen t<e t?) ?D t<e si&ing =n& t<e 8?Dt D8??rA bD ne>ess=r@ t=>Q n=i8 3I3g0e 5 31e si&ing Di88ers ,e<in&...
  • Page 17 Step 14A Assemble Gable Frame 3A C7t = 3W4 8?ng 052 t? = 8engt< ?D 324I0eA 0A Z=t<er X0Y W0I3gLe 8?ng =n& X0Y W.IdgLe 8?ng 052sA O?siti?n W0I3gLe ,?=r&s =s s<?Cn ,e8?CA (et t<e 324I0e 8?ng 052 ?n e&ge =n& ne=rest t? 324 en& C=88A ;<e g=,8e Dr=+e C<en >?+)8ete Ci88 ,e 0e Ci&er t<=n 8?Dt D8??rA cA C<e>Q t<e Dr=+e D?r sR7=renessA Je=s7re Dr?+ t<e Qnee t? t<e >?rner ?D t<e 324I0e 8?ng 052A Je=s7re =g=in Dr?+ ?))?site QneeA ;<e +e=s7re+ents s<?78&...
  • Page 18 Step 14B Assemble Gable Frame continued WA bnst=88 )reI>7t g=,8e st7&s insi&e t<e g=,8e Dr=+eA Bse = Dr=+ing sR7=re t? +=Qe s7re t<e st7&s =re )87+, =n& Dit tig<t t? t<e t?) 052 t?) Dr=+e =n& ,?tt?+ )8=teA Bse cI3g0e 5 Le T(6 g7ssets t? te+)?r=88@ se>7re t<e t?)s ?D t<e g=,8e st7&s 7nti8 t<e si&ing is =))8ie&A Bse W&...
  • Page 19 Step 15 Install Siding on Gable Frame 3A (e8e>t t<e Dirst g=,8e Dr=+e =sse+,8e& =n& )?siti?n t<e g=,8e Dr=+e s? t<e C??& g7ssets =re D=>ing t?C=r&s t<e D8??rA 0A ;<e ,?tt?+ 052 )8=te )re#ents t<e g=,8e Dr?+ 8=@ing D8=t ?n t<e D8??rA F?>=te W4 8?ng 052s t<=t <=#e = 35c ,?=r&...
  • Page 20 Step 16 Install Gable 2x4-12' Vertical Boards 3A bnst=88 X0Y tC? 052I304 ,?=r&s ?n t<e en& C=88 t? )re#ent t<e g=,8e Dr?+ D=88ing ?DD &7ring inst=88=ti?nA bnst=88 X0Y tC? +?re 052I30 ,?=r&s t? ,r=>e t<e #erti>=8 052 in )8=>eA 6eI D?re inst=88ing t<e #erti>=8 052s =tt=><...
  • Page 21 Step 17 Assemble 2x6 Roof Trusses 3A F=@ tr7ss )=rts insi&e t<e 352 ,8?>Qs 7se& =r?7n& g=,8e Dr=+esA Tne en& ?D t<e W.IdgLe 8?ng 05W ,?=r&s <=#e = ,87e +=rQA O8=>e t<ese en&s t?get<er =t t<e ri&geA J?#e X0Y tC? 352 ,8?>Qs t? t<e ,?tt?+ ?D t<e tr7ss 8egs t? Qee) t<ese Dr?+ +?#ingA 0A (e>7re t<e 05W ,?=r&s t?get<er 7sing )reI>7t g7ssetsA bnst=88 t<e 8=rger g7ssets =t t<e Qnee ?D t<e tr7ssesA (e>7re g7ssets Cit<...
  • Page 22 Step 19 Install Trusses 3A (t=rting =t t<e en& C=88 Cit<?7t t<e &??r ?)ening in&i>=te Cit< 4f4 +=rQs C<ere t<e tr7sses Ci88 ,e 8?>=te&A ;<e 8=st s)=>e Ci88 ,e Ci&er t<=n t<e Dirst X03IcgLeY s)=>eA J=rQ 05W O8=te ?n Kr?nt =n& 6=>Q ]=88s 24"...
  • Page 23 Step 20 Install Front and Back Wall Overhangs 3A F?>=te X2Y D?7r dI3g2e 8?ng 352 tri+ ,8?>QsA bnst=88 ?ne ?D t<e 352 tri+ ,8?>Qs =t e=>< >?rner ?D Dr?nt C=88A bnst=88 t<e 352 tri+ ,8?>Qs 7n&er t<e 052 g=,8e )8=te/ D87s< Cit< t<e si&ing ?n t<e gableA ;<e ,8?>Q Ci88 e5ten&...
  • Page 24 Step 21 Install Roof Sheathing C7t XNY Di#e s<eets ?D dg3We T(6 int? t<e R7=ntit@ =n& si_es s<?Cn ,e8?CA Cut (1) one 4x8 Sheet Cut (4) Four 4x8 Sheets 20-3/4" x 96" 48" x 48" 48" x 48" 27" x 96" 0A F?>=te X0Y tC? 2Le5L2e T(6 s<eets =n&...
  • Page 25 Step 22 Install Gable Trim 3A bnst=88 d1I3g2e 8?ng 35W tri+ ,?=r&s =t t<e t?) ?D t<e g=,8eA bnst=88 t<e tri+ Cit< t<e #erti>=8 >7t 8?>=te& =t t<e )e=Q ?D t<e g=,8eA bnst=88 35W D87s< Cit< t<e t?) ?D t<e r??D s<e=t<ingA Bse W&...
  • Page 26 Step 23 Install Door Trim 3A bnst=88 cIdgLe 5 L2e )ri+e& FO &??r a=+, +=teri=8 t? t<e si&es ?D t<e &??r ?)eningA bnst=88 &??r a=+, D87s< Cit< t<e si&ingA Bse W& g=8#A n=i8sA 0A bnst=88 X0Y tC? 2LIcg2e 8?ng 352 tri+ ,?=r&s =n& = 35W Qe@st?ne =>r?ss t<e t?) ?D t<e &??r ?)eningA bnst=88 t<e tri+ ,?=r&s >entere&...
  • Page 27: Install Doors

    Step 24 Install Doors If your door opening is out of square, the space around the doors will not be even. You can remove and re-position the side trim to make allowances for this. The side trim does not have to be flush with the frame of the door opening.
  • Page 28 Step 25 Install Windows 3A M))8@ >=78Qing =r?7n& t<e Cin&?C ?)ening ,eD?re inst=88ing t<e Cin&?CsA 0A E?8& t<e Cin&?C in t<e ?)ening 7sing = DeC n=i8s Cit< = D8=t <e=& s? t<e tri+ >=n ,e inserte& in t<e s8?tA [=i8s 7se& t? inst=88 s<ing8es C?rQ Ce88A cA bnsert cLI3g0e 8?ng 35c tri+ ,?=r&s =8?ng e=><...
  • Page 29 Step 29 Install Roofing — Not Supplied in Kit 3A bnst=88 +et=8 r??D 4&ri)4 e&ging =8?ng t<e Optional Roof Covering )eri+eter ?D t<e r??DA ,&8A !??D (<ing8es 0A bnst=88 De8t )=)er =n& s<ing8es =>>?r&ing t? )>sA !??D 4&ri)4 P&geI314 t<e instr7>ti?ns ?n t<e Cr=))er N11 sRA DtA Ke8t O=)er jt@A...
  • Page 30 Qty. Material Shipped on Pallet Qty. Hardware Breakdown ;r7ss I ;?) C?r&s 5 W.IdgLe 8,sA !3W& Z=8#=ni_e& ()ir=8 [=i8s ;r7ss Fegs 5 W0I3gLe 8,sA 31& C?=te& (inQers OreI,7i8t D??r Ee=&er 5 cdI3g0e 8,sA W& Z=8#=ni_e& [=i8s OreI,7i8t (?DDit T#er<=ngs 8,sA L&...