Sentry Buildings The Jefferson Assembly Book

Sentry Buildings The Jefferson Assembly Book

Building 16'x20'
Hide thumbs Also See for The Jefferson:

Advertisement

Quick Links

Sentry Buildings
Assembly Book
:2F#$23%G)(2%BC7%@A@B
the Jefferson
BCDE@AD%;)#*3#(0
Manufactured by Reynolds Building Systems, Inc.
205 Arlington Drive
Greenville, PA 16125
!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$
;)#*3#(0%<.$12&$7%=(+4
>%%?,-./#0"1%@A@A

Advertisement

loading
Need help?

Need help?

Do you have a question about the The Jefferson and is the answer not in the manual?

Questions and answers

Summary of Contents for Sentry Buildings The Jefferson

  • Page 1 Sentry Buildings Assembly Book :2F#$23%G)(2%BC7%@A@B the Jefferson BCDE@AD%;)#*3#(0 Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4 >%%?,-./#0"1%@A@A...
  • Page 2 MPORTANT NFORMATION BOUT ?"2+K 6#1" .,)/ *,+'* NOP ,/ 8)#*3#(0 +,32 ,99#+2 9,/ '(. /2L)#/2&2(1$7 Building Permits: /2$1/#+1#,($%,/%-2/&#1$%(2+2$$'/.%9,/%+,($1/)+1#,(4 ;.%,6(2/4%:292/%1,%(2E1%-'02%9,/%9,)(3'1#,(%$)002$1#,($%'(3%$#Q24 Foundation: O)/ -'+K'02 #(+*)32$ -/2R+)1 &'12/#'*$ 9,/ 1"2 @(3 9*,,/ /,,9 0'8*2$7 /,,9 What's Included: 1/)$$2$ '(3 0'8*2 1/#&4 !6, $#(0*2 ")(0 #($)*'123 6#(3,6$ 6#1" 1/#& '(3 F#(.* $")112/$4 !"#$ &'12/#'* #$ 32*#F2/237 curb side in covered van7 ,( 16, SDETD -'**21$4 <22 8'+K -'02 9,/ &'12/#'* *#$14 !"2 ('#*$ '(3 "'/36'/2 (2+2$$'/.
  • Page 3 Foundation Types & Measurements Important[ H,) 6#** (223 1, "'F2 ' -/,-2/ 9,)(3'1#,( #($1'**23 1, $)--,/1 1"2 8)#*3#(04 `2-2(3#(0%,(%1"2%#(12(323%)$2%3212/&#(2$%6"'1%1.-2%,9%9,)(3'1#,(%#$%82$14 Do Not &'K2 1"2 9,)(3'1#,( *'/02/ 1"'( 1"2 8)#*3#(0 $#Q24 ]"2( #($1'**#(0 1"2 8)#*3#(0 ,( ' +,(+/212 $*'87 #($1'** 1"2 $#3#(0 9*)$" 6#1" 1"2 8,11,& -*'124 ]"2( #($1'**#(0 ,( ' 6,,3 9*,,/7 2E12(3 1"2 $#3#(0 ^YSf 82*,6 1"2 8,11,&...
  • Page 4 Rough Opening Details for Window and Door ]"2( '$$2&8*#(0 1"2 *,62/ 6'** 9/'&2$ .,) 6#** (223 1, 32+#32 6"2/2 .,) 6'(1 1, *,+'12 1"2 2(1/. 3,,/ '(3 1"2 @Xf E ^Xf 6#(3,6 $)--*#23 #( ,)/ K#14 !"2 321'#*$ 82*,6 $",6 ",6 1, 9/'&2R#( 1"2 /,)0" ,-2(#(0$4 If you add additional windows, follow the manufacturer's instructions for the rough opening size.
  • Page 5 Step 1 Assemble (2) Two 92-1/2" Rear Wall Frames B4 ?)1 I@J 16, @ESRXD I,(2 6#** 82 1/2'123J 1, ' *2(01" ,9 g@RBY@f4 W,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3%#(3#+'12%6#1"%DhD%%&'/K$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 V'/K%'%D?D%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/K$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 92-1/2 Top Wall Plate 92-1/2" Treated Bottom Plate 11-3/4" 16" 16"...
  • Page 6 Step 2B Assemble (2) Two 8' Side Wall Frames continued @4 =($1'** ITJ $2F2( -/2R+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 a'#* 1"2 1/2'123 8,11,& -*'12%1,%2'+"%6'**%$1)3%6#1"%I@J%16,%BC3%0'*F'(#Q23%32+K%('#*$4%5$2%I@J%16,%BA3%+,'123%$#(K2/ ('#*$%-2/%$1)3%1,%$2+)/2%1"2%1,-%-*'124 ^4 :2-2'1%1,%8)#*3%IBJ%,(2%&,/2%XD%*,(0%6'**%9/'&24 S4 V'/K%8,1"%9/'&2$%DSide Wall Frames'%'(3%$21%9/'&2$%'$#324 Pre-cut 2x4 Wall Studs Treated Bottom Plate Step 3 Assemble Door Header B4 =9%.,)%'/2%#($1'**#(0%'%XD%6#32%0'/'02%3,,/%+)1%I@J%16,%BAD%*,(0%@EX%8,'/3$%1,%'%*2(01"%,9%ggf4...
  • Page 7 Step 4 Assemble (2) Two 12' Side Wall Frames B4 !/#&7 if necessary7 I@J 16, @ESRB@D 8,'/3$ I,(2 6#** 82 1/2'123J 1, ' *2(01" ,9 BSSf4 W,$#1#,( 1"2 8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%DhD%&'/K$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 144" Top Wall Plate 144" Treated Bottom Plate 16" 15-1/4" 16" Stud Spacing @4 =($1'** IBAJ 12( -/2R+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,&...
  • Page 8 Step 5A Assemble 15'-5' Front wall - 8' Wide Door Opening =9 .,) '/2 #($1'**#(0 ' gD 6#32 0'/'02 3,,/ 0, 1, Step 5B4 B4 ?)1 I@J 16, @ESRBCD I,(2 6#** 82 1/2'123J 1, ' *2(01" ,9 BZDRZf4 W,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3 #(3#+'12 6#1"...
  • Page 9 Step 5B Assemble 15'-5' Front wall - 9' Wide Door Opening B4 ?)1 I@J 16, @ESRBCD I,(2 6#** 82 1/2'123J 1, ' *2(01" ,9 BZDRZf4 W,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3 #(3#+'12 6#1" DhD &'/K$ 6"2/2 1"2 6'** $1)3$ 6#** 82 *,+'123 '(3 '( D<D 6"2/2 1"2 $)--,/1 $1)3$ 6#**%82%*,+'12344 15' - 5"...
  • Page 10 Step 6A Set Wall Frames Front and back wall frames are positioned between long side walls. B4 =($1'** ,(2 ,9 1"2 g@RBY@f /2'/ 6'** 9/'&2$ '0'#($1 #($#32 ,9 ' XD $#32 6'** 9/'&24 IMPORTANT: O/#2(1 2(3 &'/K23 6#1" ' D?D 1, +,/(2/4 <2+)/2 9/'&2$ 1,021"2/ '1 1"2 +,/(2/ )$#(0 ISJ 9,)/ BA3 $#(K2/$4%;/'+2%6'**$%6#1"%-/2R+)1%$1)3$4 @4 =($1'** 1"2 ,1"2/ g@RBY@f /2'/ 6'** 9/'&2 1, 1"2 /2'/ 6'** 9/'&24 a'#* 1"2 /2'/ 6'** 9/'&2$ 1,021"2/ 6"2/2%1"2.%8)11%6#1"%IXJ%2#0"1%BA3%$#(K2/%I$1'002/%('#*$%,(%2'+"%$#32%,9%1"2%$1)3$J%4...
  • Page 11 Step 6B Set Wall Frames continued S4 =($1'**%,--,$#12%$#32%6'**%9/'&2$4 15'-5" Front Wall Frame Z4 =($1'**%1"2%9/,(1%6'**%9/'&2%821622(%1"2%$#32%6'**%9/'&2$4%<2+)/2%9/'&2$%1,021"2/%'1%1"2 +,/(2/%)$#(0%ISJ%9,)/%BA3%$#(K2/$4 C4 a'#*%9/'&2$%1,%1"2%9*,,/%)$#(0%BC3%c'*F4%$-#/'*%('#*$%,/7%#9%2/2+1#(0%,(%'%+2&2(1%$*'87 +,(+/212%'(+",/%8,*1$%Inot includedJ%$-'+23%@Sf%,(%+2(12/4%`,%(,1%('#*%1"2%@ES%-*'12%#( 1"2%3,,/%,-2(#(04...
  • Page 12 Step 7 Install 2x4 Tie Plates B4 =($1'**%'%BCD%*,(0%@ES%,(%1"2%8'+K%6'**4%5$2%BA3%$#(K2/$%$-'+2%BCf%'-'/1%1,%$2+)/2%1#2%-*'12$4 @4 :2-2'1%1,%#($1'**%'%BCD%*,(0%@ES%1#2%-*'12%,(%1"2%,--,$#12%9/,(1%6'**4 8' Long 2x4 Tie Plate 16' Long 2x4 Tie Plate Back Wall Frames ^4 =($1'**%'%@ESRB@D%8,'/3%,(%1"2%$#32%6'**%9/'&24%!"2%@ES%$#32%6'**%1#2%-*'12%6#**%8)11%'0'#($1 1"2%BCD%*,(0%1#2%-*'12%'1%1"2%8'+K%6'**4%5$2%BA3%$#(K2/$4 S4 ?)1%1,%9#1%'(3%#($1'**%'%@ESRXD%8,'/3%,(%1"2%$'&2%$#32%6'**%9/'&24 Z4 :2-2'1%1,%#($1'**%@ES%1#2%-*'12$%,(%1"2%,--,$#12%$#32%6'**%9/'&2$4 Step 8A Install Siding on Wall Frames If a siding panel has a damaged edge, install this edge at a corner where it will be covered with corner trim.
  • Page 13 Step 8B Install Siding on Wall Frames continued Cut siding around the locations of the walk-in door and window openings. B4 =($1'** ' 9)** 6#31" $#3#(0 -'(2* ,( 1"2 $#32 6'** 6#1" 1"2 DbPWD 2302 9*)$" 6#1" 1"2 @ES$ ,( 1"2 8'+K%6'**4%=($1'**%ISJ%9,)/%&,/2%$#3#(0%-'(2*$4%%=9%(2+2$$'/.%+)1%*'$1%-'(2*%9*)$"%6#1"%@ES$%,( 9/,(1%6'**45$2%X3%0'*F4%8,E%('#*$%$-'+23%Xf%'-'/14 @4 =($1'** ' $#3#(0 -'(2* ,( 1"2 8'+K 6'** 6#1"...
  • Page 14 Step 9 thru 11 Steps not needed with this size and model. Step 12 Install Stairs IMPORTANT: Go now to the instructions in the stair kit book to install the stairs, floor joist and flooring.
  • Page 15 Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. B4 ?)1 I@J 16, @ESRBAD 8,'/3$ 1, ' *2(01" ,9 gTRBY@f4 W,$#1#,( 1"2$2 @ES$7 on edge '(3 8)11 1,021"2/4 @4 W,$#1#,(%I@J%16,%XBR^YSf%*,(0%@EC$%'(3%I@J%16,%TBR^YXf%*,(0%@EC%8,'/3$%,(%1"2%@ES%-*'12$%'$ $",6(%82*,64%!"2%1,-%@EC%8,'/3$%"'F2%8*)2%&'/K$%,(%1"2%2(3$4%W,$#1#,(%1"2$2%2(3$%1,021"2/ '1%1"2%1,-4...
  • Page 16 Step 13B Assemble Rear Gable continued Two Ridge Gussets have equal angles cuts. Four Knee Gussets have offset angles cuts. B4 <2+)/2%1"2%@EC%8,'/3$%1,021"2/%'1%1"2%K(22%'(3%/#302%6#1"%BY@f%O<;%0)$$21$4 5$2%C3%+,&&,(%('#*$4%a'#*%ZRBYSf%E%B@f%O<;%9#**2/$%6"2/2%$",6(%82*,64 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4" x 12" 1/2" Gusset OSB Filler at Knee @4 W*'+2 I@J 16, XBR^YSf '(3 I@J 16, TBR^YXf @EC$ ,F2/ 1"2 9#**2/$4 <2+)/2 )$#(0 ICJ $#E BA3 $#(K2/$ 6"2/2%9#**2/$%'(3%0)$$21$%'/2%*,+'1234 ^4 =($1'** ' @BR^YSf "#0"...
  • Page 17 Step 14 Install Siding on Rear Gable Frame B4 <1'(3%)-%1"2%0'8*2%9/'&2%'(3%$*#32%#1%1,%1"2%/2'/%,9%1"2%8)#*3#(04%W,$#1#,(%1"2%9/'&2%6#1"%1"2 8,11,&%1,6'/3$%1"2%/2'/%6'**%$,%#1%+'(%82%2/2+123%'912/%1"2%$#3#(0%#$%'--*#234 =($1'** ' -/2R+)1 $#3#(0 -'(2* 6#1" 1"2 D+)1 2302D 9*)$" 6#1" 1"2 *291 $#32 ,9 1"2 0'8*2 9/'&24 !"2 $#3#(0 $",)*3 2E12(3 ^YSf 82*,6 1"2 8,11,& @ES 0'8*2 -*'124 =($1'** $#3#(0 6#1" X3 0'*F4 ('#*$4 =($1'** I@J 16, SEX $#3#(0 -'(2*$4 ?)1 '(3 /2&,F2%$#3#(0%1"'1%2E12(3$%'8,F2%1"2%1,- ,9%1"2%0'8*2%9/'&24...
  • Page 18 Step 16 Install Rear Roof Gable 2x4-12' Vertical Boards B4 =($1'**%I@J%16,%@ESRB@D%8,'/3$%,(%1"2%8'+K%6'**%1,%-/2F2(1 1"2%0'8*2%9/,&%9'**#(0%,99%3)/#(0%0'8*2%#($1'**'1#,(4%=($1'** I@J 16, &,/2 @ESRB@ 8,'/3$ 1, 8/'+2 1"2 F2/1#+'* @ES #( -*'+24 ;29,/2 8/'+#(0 1"2 F2/1#+'* @ES$ #( -*'+2 '11'+" I@J%16,%@ES%8*,+K$%1,%1"2%8'+K%,9%1"2%@ES$4 !"#$%6#**%+/2'12%1"2%-/,-2/%$-'+#(0%1,%$21%1"2 0'8*2%,F2/%1"2%*,62/%6'**4 2x4 Block 2x4 Block 2x4-12' 2x4 Stake 2x4-12' Brace @4 \/2+1 1"2 0'8*2 ,( 8'+K 6'**4 ;2 +')1#,)$ '(3 2($)/2 0'8*2 $#3#(0 2E12(3$ ,F2/ 1/#&...
  • Page 19 Step 17 Assemble & Install Front Gable B4 :2-2'1%Step 13 1,%'$$2&8*2%9/,(1%0'8*24%P*12/%$1)3%9/'&#(0%9,/%6#(3,6%,-2(#(04%b,+'12%I^J 1"/22%STR^YSf%*,(0%@ES$4%?)1%IBJ%,(2%1,%^Cf4%W,$#1#,(%1"2$2%8,'/3$%'$%$",6(%82*,64%V2'$)/2 3#$1'(+2 1, 8,11,& 0'8*2 9/'&2 '(3 +)1 I^J 1"/22 @ES$ 1, 1"#$ *2(01" '(3 #($1'** )(32/ ^Cf 8,'/34 =($1'**%@ES$%6#1"%BA3%$#(K2/$4 @4 <*#32 0'8*2 1, 1"2 9/,(1 ,9 1"2 8)#*3#(04 47-3/4"...
  • Page 20 Step 19 Install 2x6 Soffit Blocks B4 =($1'** I^J 1"/22 BE^RXD $1/#--#(0 ,( 2'+" $#32 6'**4 <1'/1#(0 9/,& 8'+K 6'** 8)11 ' @EC $,99#1 8*,+K '0'#($1 1"2 8,11,& ,9 1"2 @EC 1/)$$ -*'124 W,$#1#,( 1"2 9#/$1 BE^ 8,'/3 BRBY@f 9/,& 8'+K 6'** 1/#& '(3 #(1, (,1+"4 Tip;...
  • Page 21 Step 20 Assemble Roof Trusses B4 b'. 1/)$$ -'/1$ #($#32 1"2 @ES 8*,+K$ )$23 '/,)(3 0'8*2 9/'&2$4 O(2 2(3 ,9 1"2 XBR^YSf *,(0 @EC 8,'/3$ "'F2 ' 8*)2 &'/K4 W*'+2 1"2$2 2(3$ 1,021"2/ '1 1"2 /#3024 P33 ' @ES 8*,+K '1 1"2 8,11,&%,9%1"2%1/)$$%*20$%1,%K22-%1"#$%@EC%9/,&%&,F#(04 @4 <2+)/2 1"2 @EC 8,'/3$ 1,021"2/ )$#(0 -/2R+)1 -*.6,,3 0)$$21$4 i(22 0)$$21$ '/2 @Sf 6#324 :#302 0)$$21 #$ ^BR^YSf 6#324 P--*.
  • Page 22 Step 21 Install Roof Trusses B4 =($1'**%@EC%"'(02/$%,F2/%1"2%DhD%&'/K$%,(%1"2%1/)$$%-*'12%'(3%9*)$"%6#1"%,)1$#32%2302%,9%@EC4 5$2%BRBY@f%M,#$1%"'(02/%('#*$4%<21%1/)$$%*20$%#(1,%"'(02/4%5$2%BA3%+,'123%$#(K2/%('#*$%1,%$2+)/2 1"2%1/)$$%1,%1"2%&21'*%"'(02/%I)$2%"'(02/%2.2*21$%1,%0)#32%1"2%('#*$%'1%1"2%+,//2+1%'(0*2J4 2x4-12' Board @4 :2&,F2%1"2%@ESRB@D%8,'/3$%)$23%1,%8/'+2 1"2 9/,(1 0'8*24 P$ .,) -/,0/2$$ $211#(0 1/)$$2$ 1'+K%1"2$2%8,'/3$%1,%K22-%1/)$$2$%-*)&84 `,(D1 /2&,F2 1"2 @ES$ )(1#* 1"2 /,,9 $"2'1"#(0 #$%'--*#234 2x6 Metal Hanger Step 22 Install Soffit B4 c'1"2/ IXJ 2#0"1 ZRBYSf E SXR^YSf -/#&23 $,99#1 -'(2*$4 V2'$)/2 9/,&...
  • Page 23 Step 23 Install Front Gable Soffit B4 =($1'**%XBR^YSf%*,(0%@ES$%,(%1"2%1,-%,9%1"2%9/,(1 0'8*27 9*)$" 6#1" 1"2 1,- ,9 1"2 0'8*2 9/'&24 =($1'** 2x4x81-3/4" 1"2%2(3$%6#1"%1"2%8*)2%&'/K%1,021"2/%'1%1"2%-2'K ,9%1"2%0'8*24%5$2%BA3%$#(K2/$%$-'+23%B@f%'-'/14 @4 =($1'** X@RZYXf *,(0 @ES$ ,( 1"2 $#32 ,9 1"2 9/,(1 0'8*27%9*)$"%6#1"%1"2%$#32%,9%1"2%0'8*2%9/'&24 ^4 =($1'** I@J 16, Xf 6#32 E SXR^YSf $,99#1 -'(2*$ )(32/ 1"2 @ES$ 6#1"...
  • Page 24 Step 24B Install Roof Sheathing continued Straight @4 <1'/1#(0 '1 0'8*2 K(22 #($1'** /,,9 $"2'1"#(0 '1 Edge 1"2 9/,(1 ,9 1"2 8)#*3#(07 refer to the sheathing 48"x59" Roof layout below4 5$#(0 ' $1/'#0"1 2302 -,$#1#,( 1"2 Sheathing 9#/$1 $"221$ -*)&8 6#1" 1"2 $,99#1 -'(2*$4 !"2 /,,9 $"2'1"#(0 $",)*3 &221 '1 +2(12/ ,9 1"2 1/)$$2$4 ^4 ?)1%O<;%9*)$"%6#1"%8'+K%0'8*2%$#3#(04 Gsble...
  • Page 25 Step 25A Install Front Gable Trim B4 =($2/1 ' XBR^YSf *,(0 @ES 821622( 1"2 $,99#1 -'(2*$ '(3 1"2 /,,9 $"2'1"#(0 ,( 1"2 )--2/ 0'8*24 5$2%BRBYSf%1/#&%$+/26$%1,%$2+)/2%1"2%$,99#1%-'(2*$%1,%1"2%@ES$4%5$2%T3%$#(K2/$%1,%$2+)/2%1"2 /,,9%$"2'1"#(0%1,%1"2%@ES$4 @4 =($2/1%'(3%$2+)/2%X@RZYXf%*,(0%@ES$%821622(%1"2%$,99#1%-'(2*$%'(3%1"2%/,,9%$"2'1"#(0%,(%1"2 $#32%,9%1"2%0'8*24 2x4x81-3/4" 2x4x81-3/4" 2x4x82-5/8" 2x4x82-5/8" ^4 =($1'**%'%^RBY@f%E%Xf%1/#&%8,'/3 1,%1"2%8,11,&%,9%1"2%@ES$%)$#(0 BRBYSf%1/#&%$+/26$4...
  • Page 26 Step 25B Install Front Gable Trim continued S4 =($1'**%X@RBYSf%*,(0%BEC%1/#&%8,'/3$%'1%1"2%1,-%,9%1"2%0'8*24 Blue Ends Together =($1'** 1"2 2(3 6#1" 1"2 8*)2 &'/K#(0 '1 1"2 /#3024 =($1'** BEC 9*)$" 6#1" 1"2 1,- ,9 1"2 /,,9 $"2'1"#(04 5$2 X3 0'*F4 ('#*$4 82-1/4" long 1x6 Trim Z4 =($1'**%XSf%*,(0%BEC%6"#12%-#(2%1/#&...
  • Page 27 Step 27 Install 1x4 Trim Around Door Opening 1x4 Door Trim B4 ?)1 1, *2(01" '(3 #($1'** BESRXD 1/#& 8,'/3$%,(%1"2%$#32$%,9%1"2%3,,/ ,-2(#(07%9*)$"%6#1"%1"2%BEC%M'&8%4 5$2%X3%0'*F4%('#*$4 @4 ?)1 ' BESRBAD 1/#& 8,'/3 '(3 #($1'** '+/,$$ 1"2 3,,/ ,-2(#(07 +2(12/23 '+/,$$ 1"2 1,- ,9%1"2%$#32%3,,/%1/#&4 Step 28 Install 2x4s Around Door Jamb B4 c'1"2/%@ES%8,'/3$%1"'1%62/2%)$23%9,/%6'**%'(3%0'8*2%8/'+#(04%?)1%1,%9#1%'(3%#($1'**%,(%1"2 #($#32%,9%1"2%3,,/%,-2(#(04%=($1'**%@ES$%,(%2'+"%$#32%'(3%'+/,$$%1"2%1,-%,9%3,,/%,-2(#(04...
  • Page 28 Step 29 Install Windows B4 P--*.%+')*K#(0%'/,)(3%1"2%6#(3,6%,-2(#(0%829,/2%#($1'**#(0%1"2%6#(3,6$4 @4 =($2/1 6#(3,6 #( ,-2(#(04 N,*3 1"2 6#(3,6 #( -*'+2 )$#(0 ' 926 ('#*$4 Note; the front flange projects past the window frame creating a slot for the trim4 5$2 ('#*$ 6#1" ' 9*'1 "2'3%$,%1"2%1/#&%+'(%82%#($2/123%#(%1"2%$*,14%a'#*$%)$23%1,%#($1'**%$"#(0*2$%6,/K%62**4 ^4 =($2/1 BE^ 1/#&...
  • Page 29 Step 30 Install Roofing — Not Supplied in Kit B4 =($1'**%&21'*%/,,9%D3/#-D%230#(0%'*,(0%1"2 Optional Roof Covering -2/#&212/%,9%1"2%/,,94 83*4 :,,9%<"#(0*2$ @4 =($1'**%$"#(0*2$%'++,/3#(0%1,%1"2%#($1/)+1#,($ ,(%1"2%6/'--2/4%=9%.,)%(223%&,/2%321'#*23 -+$4 :,,9%D3/#-D%\302RBAD #($1/)+1#,($%,(%#($1'**#(0%$"#(0*2$7%1"2/2%'/2 TAA $L4%914 U2*1%W'-2/ 0,,3%-)8*#+'1#,($%'(3%F#32,$ W'+K#(0 b#$1 G2992/$,(%%%BCD%]#32%E%@AD%;)#*3#(0%i#1 Abbreviation - White Pine (W.P.) Qty. Hardware Breakdown 'A' Pallet Qty.
  • Page 30 W'+K#(0 b#$1 G2992/$,(%%%BCD%]#32%E%@AD%;)#*3#(0%i#1 Qty. Material Shipped on 'A' Pallet Qty. Material Shipped on 'B' Pallet W/2R8)#*1%c'8*2%U/'&2$ @BR^YSf E% !/)$$%R%!,-%?,/3 E XBR^YSf W/2R8)#*1%c'8*2%U/'&2$ BgRBYSf E c'8*2%OF2/"'(0 E XBR^YSf W/2R8)#*1%@ES%`,,/%N2'32/ @ES ^TRBY@f c'8*2%]'**%<1)3$ E CSRBY@f W/2R8)#*1%@ES%]34%N2'32/ c'8*2%!/#& !/)$$%R%b20$ E TBR^YXf %%% S c'8*2%!/#&...