Download Print this page

Advertisement

Quick Links

Sentry Buildings
Assembly Book
:2B#$23%C'/+"%D7%@A@@
the Virginia
EFGH@IG%;)#*3#(0
Manufactured by Reynolds Building Systems, Inc.
205 Arlington Drive
Greenville, PA 16125
!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$
;)#*3#(0%<.$12&$7%=(+4
>%%?,-./#0"1%@A@A

Advertisement

loading
Need help?

Need help?

Do you have a question about the Virginia 16x24 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sentry Buildings Virginia 16x24

  • Page 1 Sentry Buildings Assembly Book :2B#$23%C'/+"%D7%@A@@ the Virginia EFGH@IG%;)#*3#(0 Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4 >%%?,-./#0"1%@A@A...
  • Page 2 MPORTANT NFORMATION BOUT ?"2+M 6#1" .,)/ *,+'* P[Y ,/ 8)#*3#(0 +,32 ,99#+2 9,/ '(. /2N)#/2&2(1$7 Building Permits: /2$1/#+1#,($%,/%-2/&#1$%(2+2$$'/.%9,/%+,($1/)+1#,(4 ;.%,6(2/4%:292/%1,%(2H1%-'02%9,/%9,)(3'1#,(%$)002$1#,($%'(3%$#\24 Foundation: [)/ -'+M'02 #(+*)32$ -/2]+)1 &'12/#'*$ 9,/ 1"2 @(3 9*,,/ /,,9 0'8*2$7 /,,9 What's Included: 1/)$$2$7 $1'#/ M#17 -/2]8)#*1 8'/( 3,,/$ '(3 0'8*2 1/#&4 !6, $#(0*2 ")(0 #($)*'123 6#(3,6$ 6#1" 1/#&...
  • Page 3 Foundation Types & Measurements ImportantX J,) 6#** (223 1, "'B2 ' -/,-2/ 9,)(3'1#,( #($1'**23 1, $)--,/1 1"2 8)#*3#(04 S2-2(3#(0%,(%1"2%#(12(323%)$2%3212/&#(2$%6"'1%1.-2%,9%9,)(3'1#,(%#$%82$14 Do Not &'M2 1"2 9,)(3'1#,( *'/02/ 1"'( 1"2 8)#*3#(0 $#\24 a"2( #($1'**#(0 1"2 8)#*3#(0 ,( ' +,(+/212 $*'87 #($1'** 1"2 $#3#(0 9*)$" 6#1" 1"2 8,11,& -*'124 a"2( #($1'**#(0 ,( ' 6,,3 9*,,/7 2H12(3 1"2 $#3#(0 DdIe 82*,6 1"2 8,11,&...
  • Page 4 Step 1 Assemble (2) Two 92-1/2" Rear Wall Frames E4 ?)1 K@L 16, @HI]VG K,(2 6#** 82 1/2'123L 1, ' *2(01" ,9 f@]Ed@e4 R,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3%#(3#+'12%6#1"%GgG%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 C'/M%'%G?G%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/M$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 92-1/2 Top Wall Plate 92-1/2" Treated Bottom Plate 16" 11-3/4" 16"...
  • Page 5 Step 2B Assemble (6) Six 8' Side Wall Frames continued If you are adding additional windows or doors, frame-in rough opening(s) per manufacturer's instructions. @4 =($1'** K^L $2B2( -/2]+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 c'#* 1"2 1/2'123 8,11,& -*'12%1,%2'+"%6'**%$1)3%6#1"%K@L%16,%EF3%0'*B'(#\23%32+M%('#*$4%5$2%K@L%16,%EA3%+,'123%$#(M2/ ('#*$%-2/%$1)3%1,%$2+)/2%1"2%1,-%-*'124 D4 :2-2'1%1,%8)#*3%K_L%9#B2%&,/2%VG%*,(0%6'**%9/'&24...
  • Page 6 Step 4 Assemble 15'-5" Front Wall Door Frame E4 ?)1%K@L%16,%@HI]EFG%K,(2%6#**%82%1/2'123L%1,%'%*2(01"%,9%EV_e4%R,$#1#,(%1"2%8,'/3$%1,021"2/%'(3 #(3#+'12%6#1"%GgG%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'123%'(3%'(%G<G%6"2/2%1"2%3,,/%"2'32/ $)--,/1%$1)3$%6#**%82%*,+'12344 15' - 5" Wall Plates 99" Door Header Regular Treated 96" Door Opening 17-1/2" 28-1/2" 17-1/2" 19-1/2" When setting the wall panels the door opening can be positioned on the right, as shown below, or reverse framing to position on the left end of the wall.
  • Page 7 Step 5 Install Wall Frames Front and back wall frames are positioned between long side walls. E4 =($1'** ,(2 ,9 1"2 f@]Ed@e /2'/ 6'** 9/'&2$ '0'#($1 #($#32 ,9 ' VG $#32 6'** 9/'&24 IMPORTANT: [/#2(1 2(3 &'/M23 6#1" ' G?G 1, +,/(2/4 <2+)/2 9/'&2$ 1,021"2/ '1 1"2 +,/(2/ )$#(0 KIL 9,)/ EA3 $#(M2/$4%;/'+2%6'**$%6#1"%-/2]+)1%$1)3$4 @4 =($1'** 1"2 ,1"2/ f@]Ed@e /2'/ 6'** 9/'&2 1, 1"2 /2'/ 6'** 9/'&24 c'#* 1"2 /2'/ 6'** 9/'&2$ 1,021"2/ 6"2/2%1"2.%8)11%6#1"%KVL%2#0"1%EA3%$#(M2/%K$1'002/%('#*$%,(%2'+"%$#32%,9%1"2%$1)3$L4...
  • Page 8 Step 6 Install Wall Frames continued E4 =($1'**%VG%$#32%6'**%9/'&2$%'1%1"2%9/,(1%+,/(2/$4 15'-5" Front Wall Frame 8' Side Wall Frame @4 =($1'** 1"2 9/,(1 6'** 9/'&2 821622( 1"2 $#32 6'** 9/'&2$4 !)/( 1"2 6'** 9/'&2 '/,)(3 #9 .,) 6'(1 1"2 6#(3,6 *,+'123 ,( 1"2 /#0"14 <2+)/2 9/'&2$ 1,021"2/ '1 1"2 +,/(2/ )$#(0%KIL%9,)/%EA3%$#(M2/$4 D4 c'#*%9/'&2$%1,%1"2%9*,,/%)$#(0%EF3%U'*B4%$-#/'*%('#*$%@Ie%,(%+2(12/4%[/%+,(+/212 '(+",/%8,*1$4%S,%(,1%('#*%1"2%@HI%-*'12%#(%1"2%3,,/%,-2(#(04...
  • Page 9 Step 7 Install 2x4 Tie Plates E4 =($1'**%'%EFG%*,(0%@HI%,(%1"2%8'+M%6'**4%5$2%EA3%$#(M2/$%$-'+2%EFe%'-'/1%1,%$2+)/2%1#2%-*'12$4 @4 :2-2'1%1,%#($1'**%'%EFG%*,(0%@HI%1#2%-*'12%,(%1"2%,--,$#12%9/,(1%6'**4 12' Long 2x4 Tie Plate 16' Long 2x4 Tie Plate Back Wall Frames D4 =($1'**%'%@HI]E@G%8,'/3%,(%1"2%$#32%6'**%9/'&24%!"2%@HI%$#32%6'**%1#2%-*'12%6#**%8)11%'0'#($1 1"2%EFG%*,(0%1#2%-*'12%,(%1"2%8'+M%6'**4%5$2%EA3%$#(M2/$4 I4 ?)1%%1,%9#1%'(3%#($1'**%'%@HI]E@G%8,'/3%,(%1"2%$'&2%$#32%6'**%9/'&24 _4 :2-2'1%1,%#($1'**%@HI%1#2%-*'12$%,(%1"2%,--,$#12%$#326'**%9/'&2$4 Step 8A Install Siding on Wall Frames If a siding panel has a damaged edge, install this edge at a corner where it will be covered with corner trim.
  • Page 10 Step 8B Install Siding on Wall Frames continued E4 =($1'** ' 9)** 6#31" $#3#(0 -'(2* ,( 1"2 $#32 6'** 6#1" 1"2 GQYRG 2302 9*)$" 6#1" 1"2 @HI$ ,( 1"2 8'+M 6'**4 =($1'** K_L 9#B2 &,/2 $#3#(0 -'(2*$4 =9 (2+2$$'/. +)1 *'$1 -'(2* 9*)$" 6#1" @HI$ ,( 9/,(1 6'**4%5$2%V3%0'*B4%8,H%('#*$%$-'+23%Ve%'-'/14 @4 =($1'** ' $#3#(0 -'(2* ,( 1"2 8'+M 6'** 6#1"...
  • Page 11 Step 9 thru 11 Steps not needed with this size and model. Step 12 Install Stairs IMPORTANT: Go now to the instructions in the stair kit book to install the stairs, floor joist and flooring.
  • Page 12 Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. E4 ?)1 K@L 16, @HI]EAG 8,'/3$ 1, ' *2(01" ,9 f^]Ed@e4 R,$#1#,( 1"2$2 @HI$7 on edge '(3 8)11 1,021"2/4 @4 R,$#1#,(%K@L%16,%VE]DdIe%*,(0%@HF$%'(3%K@L%16,%^E]DdVe%*,(0%@HF%8,'/3$%,(%1"2%@HI%-*'12$%'$ $",6(%82*,64%!"2%1,-%@HF%8,'/3$%"'B2%8*)2%&'/M$%,(%1"2%2(3$4%R,$#1#,(%1"2$2%2(3$%1,021"2/ '1%1"2%1,-4...
  • Page 13 Step 13B Assemble Rear Gable continued E4 <2+)/2%1"2%@HF%8,'/3$%1,021"2/%'1%1"2%M(22%'(3%/#302%6#1"%Ed@e%[<;%0)$$21$4 5$2%F3%+,&&,(%('#*$4%c'#*%_]EdIe%H%E@e%[<;%9#**2/$%6"2/2%$",6(%82*,64 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4" x 12" 1/2" Gusset OSB Filler at Knee @4 R*'+2 K@L 16, VE]DdIe '(3 K@L 16, ^E]DdVe @HF$ ,B2/ 1"2 9#**2/$4 <2+)/2 )$#(0 KFL $#H EA3 $#(M2/$ 6"2/2%9#**2/$%'/2%*,+'1234 D4 =($1'** ' @E]DdIe "#0"...
  • Page 14 Step 14 Install Siding on Rear Gable Frame E4 <1'(3%)-%1"2%0'8*2%9/'&2%'(3%$*#32%#1%1,%1"2%/2'/%,9%1"2%8)#*3#(04%R,$#1#,(%1"2%9/'&2%6#1"%1"2 8,11,&%1,6'/3$%1"2%/2'/%6'**%$,%#1%+'(%82%2/2+123%'912/%1"2%$#3#(0%#$%'--*#234 =($1'** ' -/2]+)1 $#3#(0 -'(2* 6#1" 1"2 G+)1 2302G 9*)$" 6#1" 1"2 *291 $#32 ,9 1"2 0'8*2 9/'&24 !"2 $#3#(0 $",)*3 2H12(3 DdIe 82*,6 1"2 8,11,& @HI 0'8*2 -*'124 =($1'** $#3#(0 6#1" V3 0'*B4 ('#*$4 =($1'** K@L 16, IHV $#3#(0 -'(2*$4 ?)1 '(3 /2&,B2%$#3#(0%1"'1%2H12(3$%'8,B2%1"2%1,- ,9%1"2%0'8*2%9/'&24...
  • Page 15 Step 16 Install Rear Roof Gable 2x4-12' Vertical Boards E4 =($1'**%K@L%16,%@HI]E@G%8,'/3$%,(%1"2%8'+M%6'**%1,%-/2B2(1 1"2%0'8*2%9/,&%9'**#(0%,99%3)/#(0%0'8*2%#($1'**'1#,(4%=($1'** K@L 16, &,/2 @HI]E@ 8,'/3$ 1, 8/'+2 1"2 B2/1#+'* @HI #( -*'+24 ;29,/2 8/'+#(0 1"2 B2/1#+'* @HI$ #( -*'+2 '11'+" K@L%16,%@HI%8*,+M$%1,%1"2%8'+M%,9%1"2%@HI$4 !"#$%6#**%+/2'12%1"2%-/,-2/%$-'+#(0%1,%$21%1"2 0'8*2%,B2/%1"2%*,62/%6'**4 2x4 Block 2x4 Block 2x4-12' 2x4 Stake 2x4-12' Brace @4 `/2+1 1"2 0'8*2 ,( 8'+M 6'**4 ;2 +')1#,)$ '(3 2($)/2 0'8*2 $#3#(0 2H12(3$ ,B2/ 1/#&...
  • Page 16 Step 17 Assemble & Install Front Gable E4 :2-2'1%Step 13 1,%'$$2&8*2%9/,(1%0'8*24%Y*12/%$1)3%9/'&#(0%9,/%6#(3,6%,-2(#(04%Q,+'12%KDL 1"/22%I^]DdIe%*,(0%@HI$4%?)1%KEL%,(2%1,%DFe4%R,$#1#,(%1"2$2%8,'/3$%'$%$",6(%82*,64%C2'$)/2 3#$1'(+2 1, 8,11,& 0'8*2 9/'&2 '(3 +)1 KDL 1"/22 @HI$ 1, 1"#$ *2(01" '(3 #($1'** )(32/ DFe 8,'/34 =($1'**%@HI$%6#1"%EA3%$#(M2/$4 @4 <*#32 0'8*2 1, 1"2 9/,(1 ,9 1"2 8)#*3#(04 47-3/4"...
  • Page 17 Step 19 Install 2x6 Soffit Blocks E4 =($1'** KDL 1"/22 EHD]VG $1/#--#(0 ,( 2'+" $#32 6'**4 <1'/1#(0 9/,& 8'+M 6'** 8)11 ' @HF $,99#1 8*,+M '0'#($1 1"2 8,11,& ,9 1"2 @HF 1/)$$ -*'124 R,$#1#,( 1"2 9#/$1 EHD 8,'/3 E]Ed@e 9/,& 8'+M 6'** 1/#& '(3 #(1, (,1+"4 Tip;...
  • Page 18 Step 20 Assemble Roof Trusses E4 Q'. 1/)$$ -'/1$ #($#32 1"2 @HI 8*,+M$ )$23 '/,)(3 0'8*2 9/'&2$4 [(2 2(3 ,9 1"2 VE]DdIe *,(0 @HF 8,'/3$ "'B2 ' 8*)2 &'/M4 R*'+2 1"2$2 2(3$ 1,021"2/ '1 1"2 /#3024 Y33 ' @HI 8*,+M '1 1"2 8,11,&%,9%1"2%1/)$$%*20$%1,%M22-%1"#$%@HF%9/,&%&,B#(04 @4 <2+)/2 1"2 @HF 8,'/3$ 1,021"2/ )$#(0 -/2]+)1 -*.6,,3 0)$$21$4 h(22 0)$$21$ '/2 @Ie 6#324 :#302 0)$$21 #$ DE]DdIe 6#324 Y--*.
  • Page 19 Step 21 Install Roof Trusses E4 =($1'**%@HF%"'(02/$%,B2/%1"2%GgG%&'/M$%,(%1"2%1/)$$%-*'12%'(3%9*)$"%6#1"%,)1$#32%2302%,9%@HF4 5$2%E]Ed@e%O,#$1%"'(02/%('#*$4%<21%1/)$$%*20$%#(1,%"'(02/4%5$2%EA3%+,'123%$#(M2/%('#*$%1,%$2+)/2 1"2%1/)$$%1,%1"2%&21'*%"'(02/%K)$2%"'(02/%2.2*21$%1,%0)#32%1"2%('#*$%'1%1"2%+,//2+1%'(0*2L4 2x4-12' Board @4 :2&,B2%1"2%@HI]E@G%8,'/3$%)$23%1,%8/'+2 1"2%9/,(1%0'8*24%Y$%.,)%-/,0/2$$%$211#(0 1/)$$2$%1'+M%1"2$2%8,'/3$%1,%M22-%1/)$$2$ -*)&84 S,(G1 /2&,B2 1"2 @HI$ )(1#* 1"2 /,,9 $"2'1"#(0%#$%'--*#234 2x6 Metal Hanger Step 22 Install Soffit E4 U'1"2/ KVL 2#0"1 _]EdIe H IV]DdIe -/#&23 $,99#1 -'(2*$4 C2'$)/2 9/,& 1"2 9'+2 ,9 1"2 3,)8*2 8*,+M 1, 1"2 +2(12/ ,9 1"2 9#/$1 $,99#1 8*,+M4 ?)1 ,(2 $,99#1 -'(2* 1, 1"#$ *2(01"...
  • Page 20 Step 23 Install Front Gable Soffit E4 =($1'**%VE]DdIe%*,(0%@HI$%,(%1"2%1,-%,9%1"2%9/,(1 0'8*27 9*)$" 6#1" 1"2 1,- ,9 1"2 0'8*2 9/'&24 =($1'** 2x4x81-3/4" 1"2%2(3$%6#1"%1"2%8*)2%&'/M%1,021"2/%'1%1"2%-2'M ,9%1"2%0'8*24%5$2%EA3%$#(M2/$%$-'+23%E@e%'-'/14 @4 =($1'** V@]_dVe *,(0 @HI$ ,( 1"2 $#32 ,9 1"2 9/,(1 0'8*27%9*)$"%6#1"%1"2%$#32%,9%1"2%0'8*2%9/'&24 D4 =($1'**%K@L%16,%Ve%6#32%H%IV]DdIe%-/#&23%$,99#1 2x4x -'(2*$ )(32/ 1"2 @HI$ 6#1" -/#&23 $#32 3,6( '(3 82-5/8"...
  • Page 21 Step 24B Install Roof Sheathing continued Straight @4 ?)1 K@L 16, IVeHfFe [<; $"221$ #( "'*9 1, &'M2 KIL Edge 9,)/%IVeHIVe%$"221$4 48"x59" Roof D4 <1'/1#(0%'1%0'8*2%M(22%#($1'**%/,,9%$"2'1"#(0%'1%1"2 Sheathing 9/,(1%,9%1"2%8)#*3#(07%refer to the sheathing layout below4 5$#(0 ' $1/'#0"1 2302 -,$#1#,( 1"2 9#/$1 $"221$ -*)&8%6#1"%1"2%$,99#1%-'(2*$4%!"2%/,,9%$"2'1"#(0 Gsble $",)*3%&221%'1%+2(12/%,9%1"2%1/)$$2$4...
  • Page 22 Step 25 Install Gable Trim E4 =($2/1 ' VE]DdIe *,(0 @HI 821622( 1"2 $,99#1 -'(2*$ '(3 1"2 /,,9 $"2'1"#(0 ,( 1"2 )--2/ 0'8*24 5$2%E]EdIe%1/#&%$+/26$%1,%$2+)/2%1"2%$,99#1%-'(2*$%1,%1"2%@HI$4%5$2%^3%$#(M2/$%1,%$2+)/2%1"2 /,,9%$"2'1"#(0%1,%1"2%@HI$4 @4 =($2/1%'(3%$2+)/2%V@]_dVe%*,(0%@HI$%821622(%1"2%$,99#1%-'(2*$%'(3%1"2%/,,9%$"2'1"#(0%,(%1"2 $#32%,9%1"2%0'8*24 2x4x81-3/4" 2x4x81-3/4" 2x4x82-5/8" 2x4x82-5/8" D4 =($1'**%'%D]Ed@e%H%Ve%1/#&%8,'/3 1,%1"2%8,11,&%,9%1"2%@HI$%)$#(0 E]EdIe%1/#&%$+/26$4...
  • Page 23 Step 26 Install Front Gable Trim continued I4 =($1'**%V@]EdIe%*,(0%EHF%1/#&%8,'/3$%'1%1"2%1,-%,9%1"2%0'8*24 Blue Ends Together =($1'** 1"2 2(3 6#1" 1"2 8*)2 &'/M#(0 '1 1"2 /#3024 =($1'** EHF 9*)$" 6#1" 1"2 1,- ,9 1"2 /,,9 $"2'1"#(04 5$2 V3 0'*B4 ('#*$4 82-1/4" long 1x6 Trim _4 =($1'**%VIe%*,(0%EHF%1/#&%8,'/3$%'1 1"2%$#32%,9%1"2%0'8*27%9*)$"%6#1"%1"2 /,,9%$"2'1"#(04...
  • Page 24: Install Doors

    Step 28 Install Doors If your door opening is out of square, the space around the doors will not be even. You can remove and re-position the side trim to make allowances for this. The side trim does not have to be flush with the frame of the door opening. You can move the trim in or out to make the door spacing equal.
  • Page 25 Step 29 Install Windows E4 Y--*.%+')*M#(0%,(%$#3#(0%'/,)(3%1"2%6#(3,6%,-2(#(0%829,/2%#($1'**#(0%1"2%6#(3,6$4 @4 =($2/1%6#(3,6%#(%,-2(#(04%P,*3%1"2%6#(3,6%#(%-*'+2%)$#(0%'%926%V3%0'*B4%('#*$4 D4 ;)11 EHD 1/#& 8,'/3$ '*,(0 2'+" $#32 ,9 1"2 6#(3,67 9*)$" 6#1" 1"2 1,- 9/'&24 !"2 EHD $#32 1/#& 6#**%2H12(3%D]Ed@e%82*,6%1"2%6#(3,6%9/'&2%1,%/2+2#B2%1"2%8,11,&%1/#&4%!"2%1,-%1/#&%6#**%/2$1 ,(%1"2%$#32%1/#&4%:292/%1,%1"2%+"'/1%82*,6%9,/%1"2%1/#&%6#31"%'(3%*2(01"%1,%82%)$234 I4 <2+)/2%1"2%1/#&%8,'/3$%)$#(0%KFL%$#H%$1'#(*2$$%1/#&%$+/26$4 _4 =($1'**%EHI%1/#&%'+/,$$%1"2%1,-4%Y--*.%+')*M#(0%'*,(0%1"2%1,-%,9%1"2%1/#&%8,'/34 F4 ?)1%1,%9#1%'%EHI%1/#&%8,'/3%'(3%#($1'**%)(32/%1"2%6#(3,6%821622(%1"2%EHD%$#32%1/#&4 ^4 =($1'**%$")112/$%6#1"%$+/26$%-/,B#3234 Nailing Flange 1x3 Trim Window Trim Size...
  • Page 26 Step 30 Install Roofing — Not Supplied in Kit E4 =($1'** &21'* /,,9 G3/#-G 230#(0 '*,(0 Optional Roof Covering 1"2%-2/#&212/%,9%1"2%/,,94 83*4 :,,9%<"#(0*2$ @4 %=9%.,)%(223%321'#*23%#($1/)+1#,($%,( -+$4 :,,9%G3/#-G%`302]EAG #($1'**#(0%$"#(0*2$7%1"2/2%'/2%0,,3 -)8*#+'1#,($%'B'#*'8*2%,(*#(24 ^AA $N4%914 T2*1%R'-2/ j1.4 Material Shipped in 48" Door Ctn. j1.4 Material Shipped in Extersion Kit IVe%H%VIe R/2]8)#*1%S,,/$ @HF%%H%VE]DdIe% !/)$$%!,-%?,/3...
  • Page 27 R'+M#(0 Q#$1 i#/0#(#'%EFG%a#32%H%@IG%;)#*3#(0%h#1 Qty. Material Shipped on 'A' Pallet Qty. Material Shipped on 'B' Pallet R/2]8)#*1%U'8*2%T/'&2$ @E]DdIe H% @F !/)$$%]%!,-%?,/3 H VE]DdIe R/2]8)#*1%U'8*2%T/'&2$ Ef]EdIe H I U'8*2%[B2/"'(0 H VE]DdIe R/2]8)#*1%@HI%S,,/%P2'32/ @HI D^]Ed@e D U'8*2%a'**%<1)3$ H FI]Ed@e R/2]8)#*1%@HI%a34%P2'32/ I U'8*2%!/#& !/)$$%]%Q20$ H ^E]DdVe %%% I U'8*2%!/#&...
  • Page 28 Qty. Stair Material Shipped on 'B' pallet Qty. Material Shipped by Local Supplier @ E]DdIe%<#H%<12-%<1/#(02/$ EE]^dVe H ^_]_dVe R/2]+)1%a'**%<1)3$ @ E]DdIe%T#B2%%<12-%<1/#(02/$ EE]^dV H FD]Ed@e a'**%R*'12$%K1/2'123L EE <1'#/%!/2'3$ EA]Ed@e H a'**%-*'12$%K1/2'123L f :#$2/$ ^]EdIe T/'&#(0%Q)&82/ @ :#$2/$% F]Ed@e T/'&#(0%Q)&82/ E Q'(3#(0%C'12/#'* @HE@ T/'&#(0%Q)&82/ E Q'(3#(0%C'12/#'*...