Download Print this page

Sentry Buildings The Virginia Assembly Book

Building 16'x32'
Hide thumbs Also See for The Virginia:

Advertisement

Quick Links

Sentry Buildings
Assembly Book
:2G#$23%H+1,82/%BI7%@A@A
the Virginia
BCDEF@D%;)#*3#(0
Manufactured by Reynolds Building Systems, Inc.
205 Arlington Drive
Greenville, PA 16125
!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$
;)#*3#(0%<.$12&$7%=(+4
>%%?,-./#0"1%@A@A

Advertisement

loading
Need help?

Need help?

Do you have a question about the The Virginia and is the answer not in the manual?

Questions and answers

Summary of Contents for Sentry Buildings The Virginia

  • Page 1 Sentry Buildings Assembly Book :2G#$23%H+1,82/%BI7%@A@A the Virginia BCDEF@D%;)#*3#(0 Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 !"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'* &'. (,1 82 +,-#237 #( 6",*2 ,/ #( -'/17 6#1",)1 +,($2(1 9/,& :2.(,*3$ ;)#*3#(0%<.$12&$7%=(+4 >%%?,-./#0"1%@A@A...
  • Page 2 MPORTANT NFORMATION BOUT ?"2+M 6#1" .,)/ *,+'* PHZ ,/ 8)#*3#(0 +,32 ,99#+2 9,/ '(. /2N)#/2&2(1$7 Building Permits: /2$1/#+1#,($%,/%-2/&#1$%(2+2$$'/.%9,/%+,($1/)+1#,(4 ;.%,6(2/4%:292/%1,%(2E1%-'02%9,/%9,)(3'1#,(%$)002$1#,($%'(3%$#\24 Foundation: H)/ -'+M'02 #(+*)32$ -/2]+)1 &'12/#'*$ 9,/ 1"2 @(3 9*,,/ /,,9 0'8*2$7 /,,9 What's Included: 1/)$$2$7 $1'#/ M#17 -/2]8)#*1 8'/( 3,,/$ '(3 0'8*2 1/#&4 !6, $#(0*2 ")(0 #($)*'123 6#(3,6$ 6#1" 1/#&...
  • Page 3 Foundation Types & Measurements ImportantY J,) 6#** (223 1, "'G2 ' -/,-2/ 9,)(3'1#,( #($1'**23 1, $)--,/1 1"2 8)#*3#(04 S2-2(3#(0%,(%1"2%#(12(323%)$2%3212/&#(2$%6"'1%1.-2%,9%9,)(3'1#,(%#$%82$14 Do Not &'M2 1"2 9,)(3'1#,( *'/02/ 1"'( 1"2 8)#*3#(0 $#\24 a"2( #($1'**#(0 1"2 8)#*3#(0 ,( ' +,(+/212 $*'87 #($1'** 1"2 $#3#(0 9*)$" 6#1" 1"2 8,11,& -*'124 a"2( #($1'**#(0 ,( ' 6,,3 9*,,/7 2E12(3 1"2 $#3#(0 Fd^e 82*,6 1"2 8,11,&...
  • Page 4 Step 1 Assemble (2) Two 92-1/2" Rear Wall Frames B4 ?)1 K@L 16, @E^]WD K,(2 6#** 82 1/2'123L 1, ' *2(01" ,9 f@]Bd@e4 R,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3%#(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 @4 T'/M%'%D?D%'(.6"2/2%821622(%9#/$1%16,%$1)3%&'/M$4%!"#$%#$%/292/2(+23%#(%'%*'12/%$12-4 92-1/2 Top Wall Plate 92-1/2" Treated Bottom Plate 16" 11-3/4" 16"...
  • Page 5 Step 2 Assemble (2) Two 8' Long Side Wall Frames B4 <2*2+1%K@L%16,%@E^]WD%K,(2%6#**%82%1/2'123L%#9%(2+2$$'/.%1/#&%1,%'%*2(01"%,9%fCe4%R,$#1#,(%1"2 8,'/3$%1,021"2/%'(3%#(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'1234 96" Top Wall Plate 96" Treated Bottom Plate 15-1/4" 16" 16" Stud Spacing @4 =($1'** K_L $2G2( -/2]+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 c'#* 1"2 1/2'123 8,11,&...
  • Page 6 Step 3B Assemble (4) Four 12' Side Wall Frames continued @4 =($1'** KBAL 12( -/2]+)1 6'** $1)3$ 821622( 1"2 1,- '(3 8,11,& -*'12$4 c'#* 1"2 1/2'123 8,11,&%-*'12%1,%2'+"%6'**%$1)3%6#1"%K@L%16,%BC3%0'*G'(#\23%32+M%('#*$4%5$2%K@L%16, BA3%+,'123%$#(M2/%('#*$%-2/%$1)3%1,%$2+)/2%1"2%1,-%-*'124 F4 :2-2'1%1,%8)#*3%KFL%1"/22%(,/2%B^^e%*,(0%6'**%9/'&24 ^4 T'/M%8,1"%9/'&2$%DSide Wall Frames'%'(3%$21%9/'&2$%'$#324 Pre-cut 2x4 Wall Studs Treated Bottom Plate Step 4 Assemble Door Header B4 ?)1%K@L%16,%BAD%*,(0%@EW%8,'/3$%1,%'%*2(01"%,9%ffe4...
  • Page 7 Step 5 Assemble 15'-5" Front wall Door Frame B4 ?)1 K@L 16, @E^]BCD K,(2 6#** 82 1/2'123L 1, ' *2(01" ,9 BID]Ie4 R,$#1#,( 1"2 8,'/3$ 1,021"2/ '(3 #(3#+'12%6#1"%DgD%%&'/M$%6"2/2%1"2%6'**%$1)3$%6#**%82%*,+'123%'(3%'(%D<D%6"2/2%1"2%3,,/%"2'32/ $)--,/1%$1)3$%6#**%82%*,+'12344 15' - 5" Wall Plates 99" Door Header Regular Treated 96" Door Opening 13-1/2"...
  • Page 8 Step 6 Set Wall Frames Front and back wall frames are positioned between long side walls. B4 =($1'**%,(2%,9%1"2%f@]Bd@e%/2'/%6'**%9/'&2$%'0'#($1%#($#32%,9%'%WD%$#32%6'**%9/'&24%;/'+2%6'**$ 6#1"%-/2]+)1%$1)3$4%IMPORTANT:%H/#2(1%2(3%&'/M23%6#1"%'%D?D%1,%+,/(2/4%<2+)/2%9/'&2$ 1,021"2/%'1%1"2%+,/(2/%)$#(0%K^L%9,)/%BA3%$#(M2/$ @4 =($1'** 1"2 ,1"2/ f@]Bd@e /2'/ 6'** 9/'&2 1, 1"2 /2'/ 6'** 9/'&24 c'#* 1"2 /2'/ 6'** 9/'&2$ 1,021"2/ 6"2/2%1"2.%8)11%6#1"%KWL%2#0"1%BA3%$#(M2/%K$1'002/%('#*$%,(%2'+"%$#32%,9%1"2%$1)3$L%4 F4 =($1'** ' B@D 9/'&27 (2E1 1, 1"2 9#/$1 WD $#32 6'** 9/'&24 c'#* 9/'&2$ 1,021"2/ 6"2/2 1"2.
  • Page 9 Step 7 Install 2x4 Tie Plates B4 =($1'**%'%BCD%*,(0%@E^%,(%1"2%8'+M%6'**4%5$2%BA3%$#(M2/$%$-'+2%BCe%'-'/1%1,%$2+)/2%1#2%-*'12$4 @4 :2-2'1%1,%#($1'**%'%BCD%*,(0%@E^%1#2%-*'12%,(%1"2%,--,$#12%9/,(1%6'**4 16' Long 2x4 Tie Plate 12' Long 2x4 Tie Plate Back Wall Frames F4 =($1'**%'%@E^]B@D%,(%1"2%$#32%6'**4%!"2%@E^%6#**%8)11%'0'#($1%1"2%BCD%*,(0%1#2%-*'12%,(%1"2%8'+M 6'**4%5$2%BA3%$#(M2/$4 ^4 =($1'**%'(,1"2/%%@E^]B@D%8,'/3$%,(%1"2%$'&2%$#32%6'**%9/'&24 I4 ?)1%1,%9#1%'(3%#($1'**%'%@E^]WD%8,'/3%1,%9#(#$"4 C4 :2-2'1%1,%#($1'**%@E^%1#2%-*'12$%,(%1"2%,--,$#12%$#326'**%9/'&2$4 Step 8A Install Siding on Wall Frames If a siding panel has a damaged edge, install this edge at a corner where it will be covered with corner trim.
  • Page 10 Step 8B Install Siding on Wall Frames continued B4 =($1'** ' 9)** 6#31" $#3#(0 -'(2* ,( 1"2 $#32 6'** 6#1" 1"2 DQZRD 2302 9*)$" 6#1" 1"2 @E^$ ,( 1"2 8'+M%6'**4%=($1'**%K_L%$2G2(%&,/2%$#3#(0%-'(2*$4%=9%(2+2$$'/.%+)1%*'$1%-'(2*%9*)$"%6#1"%@E^$%,( 9/,(1%6'**4%5$2%W3%0'*G4%8,E%('#*$%$-'+23%We%'-'/14 @4 =($1'** ' $#3#(0 -'(2* ,( 1"2 8'+M 6'** 6#1" 1"2 DQZRD 2302 9*)$" 6#1" 1"2 $#3#(0 ,( 1"2 $#32 6'**4%=($1'**%F%&,/2%-'(2*$4 F4 =($1'** $#3#(0 ,( ,--,$#12 $#32%6'**4...
  • Page 11 Step 9 thru 11 Steps not needed with this size and model. Step 12 Install Stairs IMPORTANT: Go now to the instructions in the stair kit book to install the stairs, floor joist and flooring.
  • Page 12 Step 13A Assemble Rear Gable Assemble the roof gables and trusses on the center of the loft floor. This will make it easier to stand the gable upright over the lower wall. B4 ?)1 K@L 16, @E^]BAD 8,'/3$ 1, ' *2(01" ,9 f_]Bd@e4 R,$#1#,( 1"2$2 @E^$7 on edge '(3 8)11 1,021"2/4 @4 R,$#1#,(%K@L%16,%WB]Fd^e%*,(0%@EC$%'(3%K@L%16,%_B]FdWe%*,(0%@EC%8,'/3$%,(%1"2%@E^%-*'12$%'$ $",6(%82*,64%!"2%1,-%@EC%8,'/3$%"'G2%8*)2%&'/M$%,(%1"2%2(3$4%R,$#1#,(%1"2$2%2(3$%1,021"2/ '1%1"2%1,-4...
  • Page 13 Step 13B Assemble Rear Gable continued Two Ridge Gussets have equal angles cuts. Four Knee Gussets have offset angles cuts. B4 <2+)/2%1"2%@EC%8,'/3$%1,021"2/%'1%1"2%M(22%'(3%/#302%6#1"%Bd@e%H<;%0)$$21$4 5$2%C3%+,&&,(%('#*$4%c'#*%I]Bd^e%E%B@e%H<;%9#**2/$%6"2/2%$",6(%82*,64 5/1/4" x 12" OSB Gusset 1/2" Gusset at Ridge 5-1/4" x 12" 1/2" Gusset OSB Filler at Knee @4 R*'+2 K@L 16, WB]Fd^e '(3 K@L 16, _B]FdWe @EC$ ,G2/ 1"2 9#**2/$4 <2+)/2 )$#(0 KCL $#E BA3 $#(M2/$ 6"2/2%9#**2/$%'(3%0)$$21$%'/2%*,+'1234 F4 =($1'** ' @B]Fd^e "#0"...
  • Page 14 Step 14 Install Siding on Rear Gable Frame B4 <1'(3%)-%1"2%0'8*2%9/'&2%'(3%$*#32%#1%1,%1"2%/2'/%,9%1"2%8)#*3#(04%R,$#1#,(%1"2%9/'&2%6#1"%1"2 8,11,&%1,6'/3$%1"2%/2'/%6'**%$,%#1%+'(%82%2/2+123%'912/%1"2%$#3#(0%#$%'--*#234 =($1'** ' -/2]+)1 $#3#(0 -'(2* 6#1" 1"2 D+)1 2302D 9*)$" 6#1" 1"2 *291 $#32 ,9 1"2 0'8*2 9/'&24 !"2 $#3#(0 $",)*3 2E12(3 Fd^e 82*,6 1"2 8,11,& @E^ 0'8*2 -*'124 =($1'** $#3#(0 6#1" W3 0'*G4 ('#*$4 =($1'** K@L 16, ^EW $#3#(0 -'(2*$4 ?)1 '(3 /2&,G2%$#3#(0%1"'1%2E12(3$%'8,G2%1"2%1,- ,9%1"2%0'8*2%9/'&24...
  • Page 15 Step 16 Install Rear Roof Gable 2x4-12' Vertical Boards B4 =($1'**%K@L%16,%@E^]B@D%8,'/3$%,(%1"2%8'+M%6'**%1,%-/2G2(1 1"2%0'8*2%9/,&%9'**#(0%,99%3)/#(0%0'8*2%#($1'**'1#,(4%=($1'** K@L 16, &,/2 @E^]B@ 8,'/3$ 1, 8/'+2 1"2 G2/1#+'* @E^ #( -*'+24 ;29,/2 8/'+#(0 1"2 G2/1#+'* @E^$ #( -*'+2 '11'+" K@L%16,%@E^%8*,+M$%1,%1"2%8'+M%,9%1"2%@E^$4 !"#$%6#**%+/2'12%1"2%-/,-2/%$-'+#(0%1,%$21%1"2 0'8*2%,G2/%1"2%*,62/%6'**4 2x4 Block 2x4 Block 2x4-12' 2x4 Stake 2x4-12' Brace @4 `/2+1 1"2 0'8*2 ,( 8'+M 6'**4 ;2 +')1#,)$ '(3 2($)/2 0'8*2 $#3#(0 2E12(3$ ,G2/ 1/#&...
  • Page 16 Step 17 Assemble & Install Front Gable B4 :2-2'1%Step 13 1,%'$$2&8*2%9/,(1%0'8*24%Z*12/%$1)3%9/'&#(0%9,/%6#(3,6%,-2(#(04%Q,+'12%KFL 1"/22%^_]Fd^e%*,(0%@E^$4%?)1%KBL%,(2%1,%FCe4%R,$#1#,(%1"2$2%8,'/3$%'$%$",6(%82*,64%T2'$)/2 3#$1'(+2 1, 8,11,& 0'8*2 9/'&2 '(3 +)1 KFL 1"/22 @E^$ 1, 1"#$ *2(01" '(3 #($1'** )(32/ FCe 8,'/34 =($1'**%@E^$%6#1"%BA3%$#(M2/$4 @4 <*#32 0'8*2 1, 1"2 9/,(1 ,9 1"2 8)#*3#(04 47-3/4"...
  • Page 17 Step 19 Install 2x6 Soffit Blocks B4 =($1'** K^L 9,)/ BEF]WD $1/#--#(0 ,( 2'+" $#32 6'**4 <1'/1#(0 9/,& 8'+M 6'** 8)11 ' @EC $,99#1 8*,+M '0'#($1 1"2 8,11,& ,9 1"2 @EC 1/)$$ -*'124 R,$#1#,( 1"2 9#/$1 BEF 8,'/3 B]Bd@e 9/,& 8'+M 6'** 1/#& '(3 #(1, (,1+"4 Tip;...
  • Page 18 Step 20 Assemble Roof Trusses B4 Q'. 1/)$$ -'/1$ #($#32 1"2 @E^ 8*,+M$ )$23 '/,)(3 0'8*2 9/'&2$4 H(2 2(3 ,9 1"2 WB]Fd^e *,(0 @EC 8,'/3$ "'G2 ' 8*)2 &'/M4 R*'+2 1"2$2 2(3$ 1,021"2/ '1 1"2 /#3024 Z33 ' @E^ 8*,+M '1 1"2 8,11,&%,9%1"2%1/)$$%*20$%1,%M22-%1"#$%@EC%9/,&%&,G#(04 @4 <2+)/2 1"2 @EC 8,'/3$ 1,021"2/ )$#(0 -/2]+)1 -*.6,,3 0)$$21$4 i(22 0)$$21$ '/2 @^e 6#324 :#302 0)$$21 #$ FB]Fd^e 6#324 Z--*.
  • Page 19 Step 21 Install Roof Trusses B4 =($1'**%@EC%"'(02/$%,G2/%1"2%DgD%&'/M$%,(%1"2%1/)$$%-*'12%'(3%9*)$"%6#1"%,)1$#32%2302%,9%@EC4 5$2%B]Bd@e%O,#$1%"'(02/%('#*$4%<21%1/)$$%*20$%#(1,%"'(02/4%5$2%BA3%+,'123%$#(M2/%('#*$%1,%$2+)/2 1"2%1/)$$%1,%1"2%&21'*%"'(02/%K)$2%"'(02/%2.2*21$%1,%0)#32%1"2%('#*$%'1%1"2%+,//2+1%'(0*2L4 2x4-12' Board @4 :2&,G2%1"2%@E^]B@D%8,'/3$%)$23%1,%8/'+2 1"2 9/,(1 0'8*24 Z$ .,) -/,0/2$$ $211#(0 1/)$$2$ 1'+M%1"2$2%8,'/3$%1,%M22-%1/)$$2$%-*)&84 S,(D1 /2&,G2 1"2 @E^$ )(1#* 1"2 /,,9 $"2'1"#(0 #$%'--*#234 2x6 Metal Hanger Step 22 Install Soffit B4 V'1"2/ KBAL 12( I]Bd^e E ^W]Fd^e -/#&23 $,99#1 -'(2*$4 T2'$)/2 9/,&...
  • Page 20 Step 23 Install Front Gable Soffit B4 =($1'**%WB]Fd^e%*,(0%@E^$%,(%1"2%1,-%,9%1"2%9/,(1 0'8*27 9*)$" 6#1" 1"2 1,- ,9 1"2 0'8*2 9/'&24 =($1'** 2x4x81-3/4" 1"2%2(3$%6#1"%1"2%8*)2%&'/M%1,021"2/%'1%1"2%-2'M ,9%1"2%0'8*24%5$2%BA3%$#(M2/$%$-'+23%B@e%'-'/14 @4 =($1'** W@]IdWe *,(0 @E^$ ,( 1"2 $#32 ,9 1"2 9/,(1 0'8*27%9*)$"%6#1"%1"2%$#32%,9%1"2%0'8*2%9/'&24 F4 =($1'** K@L 16, We 6#32 E ^W]Fd^e $,99#1 -'(2*$ )(32/ 1"2 @E^$ 6#1"...
  • Page 21 Step 24B Install Roof Sheathing continued @4 ?)1 K@L 16, ^WeEfCe H<; $"221$ #( "'*9 1, &'M2 K^L 9,)/%^WeE^We%$"221$4%:2]+)1%,(2%1,%FCeE^We4 48"x59" Roof F4 <1'/1#(0%'1%0'8*2%M(22%#($1'**%/,,9%$"2'1"#(0%'1%1"2 Sheathing 9/,(1%,9%1"2%8)#*3#(07%refer to the sheathing layout below4 5$#(0 ' $1/'#0"1 2302 -,$#1#,( 1"2 9#/$1 $"221$ -*)&8%6#1"%1"2%$,99#1%-'(2*$4%!"2%/,,9%$"2'1"#(0 Straight Edge $",)*3%&221%'1%+2(12/%,9%1"2%1/)$$2$4 ^4 ?)1%H<;%9*)$"%6#1"%8'+M%0'8*2%$#3#(04...
  • Page 22 Step 25 Install Front Gable Trim B4 =($2/1 ' WB]Fd^e *,(0 @E^ 821622( 1"2 $,99#1 -'(2*$ '(3 1"2 /,,9 $"2'1"#(0 ,( 1"2 )--2/ 0'8*24 5$2%B]Bd^e%1/#&%$+/26$%1,%$2+)/2%1"2%$,99#1%-'(2*$%1,%1"2%@E^$4%5$2%_3%$#(M2/$%1,%$2+)/2%1"2 /,,9%$"2'1"#(0%1,%1"2%@E^$4 @4 =($2/1%'(3%$2+)/2%W@]IdWe%*,(0%@E^$%821622(%1"2%$,99#1%-'(2*$%'(3%1"2%/,,9%$"2'1"#(0%,(%1"2 $#32%,9%1"2%0'8*24 2x4x81-3/4" 2x4x81-3/4" 2x4x82-5/8" 2x4x82-5/8" F4 =($1'**%'%F]Bd@e%E%We%1/#&%8,'/3 1,%1"2%8,11,&%,9%1"2%@E^$%)$#(0 B]Bd^e%1/#&%$+/26$4...
  • Page 23 Step 26 Install Front Gable Trim continued ^4 =($1'**%W@]Bd^e%*,(0%BEC%1/#&%8,'/3$%'1%1"2%1,-%,9%1"2%0'8*24 Blue Ends Together =($1'** 1"2 2(3 6#1" 1"2 8*)2 &'/M#(0 '1 1"2 /#3024 =($1'** BEC 9*)$" 6#1" 1"2 1,- ,9 1"2 /,,9 $"2'1"#(04 5$2 W3 0'*G4 ('#*$4 82-1/4" long 1x6 Trim I4 =($1'**%W^e%*,(0%BEC%6"#12%-#(2%1/#&...
  • Page 24 k1.4 Material Shipped in 48" Door Ctn. ^We%E%W^e R/2]8)#*1%S,,/$ B@e%E%^@e !/'($,&%a#(3,6$ BE^e%E%W^e a4R4%S,,/%!/#& BE^e%E%^W]Fd^e a4R4%S,,/%!/#& BECe%E%BAe a4R4%i2.$1,(2 F]_dWe%E%W^e R/#&23%S,,/%l'&8 Ce%S,,/%P#(02$ S,,/%P'(3*2%6dM2. Ce%;'//2*%;,*1 +/26$ _I 2'4 @e%P#(02%< BC 2'4 a"#12%a#(3,6%<+/26$ Step 28 Install Door Stop on Left Door =($1'**%'%^]Bd^e%E%WFe%*,(0%8,'/3%'$%'%3,,/%$1,-%1,%1"2%/#0"1%$#32%,9%,(2%,9%1"2%3,,/$4%!"#$%6#**%82 1"2 *291 3,,/ 6"2( #($1'**234 !"2 3,,/ $1,- $",)*3 2E12(3 Fd^e 82.,(3 1"2 9/'&2 ,9 1"2 3,,/4 =($1'** 6#1"%B]B]@e%2E12/#,/%$+/26$%-'+M23%#(%1"2%&'#(%+,&-,(2(1%M#14%<-'+2%$+/26$%B@e%'-'/14 S,,/%<1,-%`E12(3$%Fd^e ;2.,(3%U/'&2...
  • Page 25: Install Doors

    Step 29 Install Doors If your door opening is out of square, the space around the doors will not be even. You can remove and re-position the side trim to make allowances for this. The side trim does not have to be flush with the frame of the door opening. You can move the trim in or out to make the door spacing equal.
  • Page 26 Step 30 Install Windows B4 Z--*.%+')*M#(0%'/,)(3%1"2%6#(3,6%,-2(#(0%829,/2%#($1'**#(0%1"2%6#(3,6$4 @4 =($2/1 6#(3,6 #( ,-2(#(04 P,*3 1"2 6#(3,6 #( -*'+2 )$#(0 ' 926 ('#*$4 Note; the front flange projects past the window frame creating a slot for the trim4 5$2 ('#*$ 6#1" ' 9*'1 "2'3%$,%1"2%1/#&%+'(%82%#($2/123%#(%1"2%$*,14%c'#*$%)$23%1,%#($1'**%$"#(0*2$%6,/M%62**4 F4 =($2/1 BEF 1/#&...
  • Page 27 R'+M#(0 Q#$1 a2$1%j#/0#(#'%BCD%a#32%E%F@D%;)#*3#(0%i#1 Qty. Material Shipped on 'A' Pallet Qty. Material Shipped on 'B' Pallet R/2]8)#*1%V'8*2%U/'&2$ @B]Fd^e E% @C !/)$$%]%!,-%?,/3 E WB]Fd^e R/2]8)#*1%V'8*2%U/'&2$ Bf]Bd^e E ^ V'8*2%HG2/"'(0 E WB]Fd^e R/2]8)#*1%@E^%S,,/%P2'32/ @E^ F_]Bd@e F V'8*2%a'**%<1)3$ E C^]Bd@e R/2]8)#*1%@E^%a34%P2'32/ ^ V'8*2%!/#& !/)$$%]%Q20$ E _B]FdWe %%% ^ V'8*2%!/#&...
  • Page 28 Qty. Stair Material Shipped on 'B' pallet Qty. Material Shipped by Local Supplier @ B]Fd^e%<#E%<12-%<1/#(02/$ BB]_dWe E _I]IdWe R/2]+)1%a'**%<1)3$ a'**%R*'12$%K1/2'123L @ B]Fd^e%U#G2%%<12-%<1/#(02/$ BB]_dW E CF]Bd@e BB <1'#/%!/2'3$ BA]Bd@e E a'**%-*'12$%K1/2'123L a'**%-*'12$%K1/2'123L f a4R4%:#$2/$ _]Bd^e U/'&#(0%Q)&82/ @ a4R4%:#$2/$% C]Bd@e B Q'(3#(0%T'12/#'* @EB@ U/'&#(0%Q)&82/ U/'&#(0%Q)&82/...