Dell EMC AX4-5 Hardware Installation And Troubleshooting Manual page 29

Fibre channel storage arrays with microsoft windows server failover clusters
Table of Contents

Advertisement

Connect a cable from Fibre Channel switch 0 (sw0) to SP-B Fibre port
d
3(Fourth fibre port).
Connect a cable from Fibre Channel switch 1 (sw1) to SP-A Fibre port
e
2(Third fibre port).
Connect a cable from Fibre Channel switch 1 (sw1) to SP-A Fibre port
f
3(Fourth fibre port).
Connect a cable from Fibre Channel switch 1 (sw1) to SP-B Fibre port
g
0(first fibre port).
Connect a cable from Fibre Channel switch 1 (sw1) to SP-B Fibre port
h
1(Second fibre port).
Figure 2-10. Cabling a SAN-Attached Cluster to an AX4-5FX Storage System
cluster node 1
HBA ports (2)
0 1
sw0
SP-B
AX4-5FX storage system
Cabling Your Cluster Hardware
cluster node 2
HBA ports (2)
sw1
SP-A
0 1
29

Advertisement

Table of Contents
loading

Table of Contents