ANY QUESTIONS? Scan the QR code to contact us via our customer portal.
Page 3
ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
Page 4
What is a Modular Shed? This Modular shed allows you to choose the layout of your shed, yourself. The 4ft Door, Window and Plain Panels (No. 4a, 4b & 4c) are all interchangeable, and can be swapped and positioned however you choose. For pent buildings, we recommend keeping the Door and Window Panels as close to the top end of the building as possible (shown below).
Page 5
Building Contents: Tip: Labelling your parts, using a pencil and masking tape, may help you to identify them easier when you need them. 2ft Roof QTY 1 4ft Roof QTY 2 SU-S21MBLID1811X590-V1 SU-S21MBLID1811X1180-V1 End View Floor Extension Joist - 44x56x1175mm QTY 2 F4456-1175mm-DT End View Floor Extension Joist - 44x56x585mm QTY 2...
End View Fascia - 12x40x2000mm QTY 2** S1240-2000mm *You may have more of this part than required. T-Hinge QTY 3 Felt QTY 1** PI-07-0021 Turn Button QTY 2 PI-07-0034 Capping Felt QTY 1** End View Pad Bolt QTY 1 Door Block - 27x44x150mm QTY 2 PI-07-0035 F2744-150mm Door Handle QTY 1...
Page 7
Step 1 IMPORTANT: Pre-drill before xing screws. Before assembly, please make sure you have a suitable Parts needed - No. 3 QTY 1 No. 4b QTY 1 base ready to install your building onto. No. 22 QTY 3 Place the 4ft Door Panel (No. 4b) face up onto a at and level base.
Page 8
Step 2 IMPORTANT: Pre-drill before xing screws. Step 3 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 3 QTY 1 Parts needed - No. 24 QTY 1 Horizontal Handle: No. 28 QTY 2 *Internal door framing* Opens from the Left Opens from the Right Locate the Pad Bolt (No.
Page 9
Step 5 Step 6 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 25 QTY 1 Parts needed - No. 1 QTY 2 No. 2 QTY 1 Horizontal Handle: Please note: Your Handle can be *Internal door framing* positioned horizontally or vertically.
Page 10
Step 8 Step 10 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 5 QTY 2 Once assembled, ip the Floor Panel (No. 1) over so the bearers are at on **Please note: The 4ft Panels (No. 4a, 4b your rm and level base. and 4c) are all interchangeable and can be positioned in a variety of di erent Ensure the base has suitable drainage,...
Page 11
Step 11 Step 12 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 4 QTY 2 (4a, 4b OR 4c) Parts needed - No. 5 QTY 1 Locate a 4ft Panel (No. 4a, 4b, 4c) next to Locate a 2ft Panel (No.
Page 12
Step 13 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 4 QTY 2 (4a, 4b OR 4c) Parts needed - No. 4 QTY 1 (4a, 4b OR 4c) Locate a 4ft Panel (No. 4a, 4b, 4c) next to Locate a 4ft Panel (No.
Page 13
Step 15 IMPORTANT: Pre-drill before xing screws. Step 16 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 4 QTY 1 (4a, 4b OR 4c) Parts needed - No. 8 QTY 1 No. 5 QTY 1 No. 9 QTY 1 Locate the remaining 4ft Panel (No.
Page 14
Step 17 Step 18 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 6 QTY 2 Parts needed - No. 10 QTY 1 No. 7 QTY 1 No. 11 QTY 2 Locate one of the 4ft Toppers (No. 6) on Locate one 4ft Roof (No.
Page 15
Step 20 Step 19 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Once the Roof is xed, secure the Make sure the building is square Panels to the oor using 50mm by measuring from corner to screws, screwing down through the corner comparing Panel framing into the Floor bearers...
Page 16
Step 21 Step 22 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 14 QTY 2 Parts needed - No. 18 QTY 4 No. 15 QTY 10 Along the front of the building, use a No.
Page 17
Step 23 Step 24 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 18 QTY 2 Parts needed - No. 26 QTY 1 No. 27 QTY 1 At either end of the building, use a tape measure to measure the total Cut the Felt (No.
Page 18
Step 25 Step 26 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 19 QTY 12 Parts needed - No. 20 QTY 2 Please note: You have been supplied with Please note: You have been supplied with six 12 Cover Trims (No.
Page 19
Step 27 IMPORTANT: Pre-drill before xing screws. Step 28 Parts needed - No. 20 QTY 2 No. 21 QTY 2 Once constructed, apply a preserving treatment and a waterproo ng treatment Please note: You have been supplied with six Fascias to your garden building as soon as (No.
Page 20
ANY QUESTIONS? Scan code contact us via our customer portal.
Need help?
Do you have a question about the SI-100-001-0011 and is the answer not in the manual?
Questions and answers