Download Print this page

Mercia Garden Products SI-100-001-0005 Instructions Manual

10x6 apex / reverse apex shiplap shed

Advertisement

Quick Links

x2
MADE IN GREAT BRITAIN
2mm Drill bit
Water proof
Preservative

Advertisement

loading
Need help?

Need help?

Do you have a question about the SI-100-001-0005 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products SI-100-001-0005

  • Page 1 MADE IN GREAT BRITAIN 2mm Drill bit Water proof Preservative...
  • Page 2 ANY QUESTIONS? Scan the QR code to contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 What is a Modular Shed? This Modular shed allows you to choose the layout of your shed, yourself. The 4ft Door, Window and Plain Panels (No. 4a, 4b & 4c) are all interchangeable, and can be swapped and positioned however you choose. Please note: The buildings shown may di er in size from your chosen building however the process of interchanging the Panels is the same.
  • Page 5 End View Building Contents: Floor Extension Joist - 44x56x1175mm QTY 2 Tip: Labelling your parts, using a pencil and masking tape, F4456-1175mm-DT End View may help you to identify them easier when you need them. Floor Extension Joist - 44x56x585mm QTY 2 F4456-585mm-DT End View Ridge Bar - 27x70x1475mm QTY 2...
  • Page 6: Missing Parts

    Door Handle QTY 1 Finial QTY 2 Shed Diamond Finial PI-07-0240 T-Hinge QTY 3 Corner Brace QTY 2 PI-07-0021 PI-07-0012 U-Channel QTY 1 Felt QTY 1** PI-07-0013 Turn Button QTY 2 Capping Felt QTY 1** PI-07-0034 End View Door Block - 27x44x150mm QTY 2 Pad Bolt QTY 1 F2744-150mm PI-07-0035...
  • Page 7 Step 1 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 3 QTY 1 Before assembly, please make sure you have a suitable No. 4b QTY 1 No. 24 QTY 3 base ready to install your building onto. Place the 4ft Door Panel (No. 4b) face up onto a at and level base.
  • Page 8 Step 2 IMPORTANT: Pre-drill before xing screws. Step 3 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 3 QTY 1 Parts needed - No. 27 QTY 1 Horizontal Handle: No. 32 QTY 2 Opens from the Left Opens from the Right *Internal door framing* Locate the Pad Bolt (No.
  • Page 9 Step 5 Step 6 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 28 QTY 1 Parts needed - No. 1 QTY 2 No. 2 QTY 1 Horizontal Handle: Please note: Your Handle can be *Internal door framing* positioned horizontally or vertically.
  • Page 10 Step 8 Step 10 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 5 QTY 2 Once assembled, ip the Floor Panel (No. 1 & 2) over so the bearers are at **Please note: The 4ft Panels (No. 4a, 4b on your rm and level base.
  • Page 11 Step 11 Step 12 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 4 QTY 2 (4a, 4b OR 4c) Parts needed - No. 5 QTY 1 (4a, 4b OR 4c) Locate a 4ft Panel (No. 4a, 4b, 4c) next to Locate a 2ft Panel (No.
  • Page 12 Step 13 Step 14 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 4 QTY 2 (4a, 4b OR 4c) Parts needed - No. 4 QTY 1 (4a, 4b OR 4c) Locate a 4ft Panel (No. 4a, 4b, 4c) next to Locate a 4ft Panel (No.
  • Page 13 Step 15 Step 16 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 4 QTY 1 (4a, 4b OR 4c) Parts needed - No. 6 QTY 2 No. 5 QTY 1 Locate the Gable Tops (No. 6) on top Locate the remaining 4ft Panel (No.
  • Page 14 Step 18 IMPORTANT: Pre-drill before xing screws. Align the assembled Ridge Bar (No. 12) with the central framing on the Gables, ensuring the top and sides are ush. (If you have not yet assembled your Ridge Bar, please refer to Step 17). Secure the Corner Braces (No.
  • Page 15 Step 19 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 7 QTY 2 No. 8 QTY 2 No. 9 QTY 4 At one end of the building, position a Large 2ft Roof Panel (No. 9) onto the Gable Top (No. 6), ensuring the Roof Panel framing sits rmly within the notches on the Gable Top and on top of the Ridge Bar (No.
  • Page 16 Step 20 Step 21 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 14 QTY 2 Once the Roof Panels are in place and positioned centrally to the building, On either side of the Ridge bar, they can be xed in place.
  • Page 17 Step 22 Step 23 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 16 QTY 2 Parts needed - No. 13 QTY 2 Please note: You have been supplied with two Place the Truss Block (No. 13) up to the Truss Support Blocks (No.
  • Page 18 Step 24 Step 26 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 15 QTY 1 Once the Roof is xed, secure the Panels Place the Truss Support (No. 15) to the oor using 50mm screws, underneath the two Truss Frames screwing down through the Panel (No.
  • Page 19 Step 27 Step 28 IMPORTANT: Pre-drill before xing screws. Parts needed - No. 17 QTY 2 Parts needed - No. 30 QTY 1 No. 18 QTY 10 No. 31 QTY 1 No. 19 QTY 2 Cut the Felt (No. 30) into two sheets measuring: No.
  • Page 20 Step 29 Step 30 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts needed - No. 21 QTY 12 Parts needed - No. 22 QTY 4 No. 23 QTY 2 Please note: You have been supplied with 12 Locate two Fascias (No.
  • Page 21 Step 31 Once constructed, apply a preserving treatment and a waterproo ng treatment to your garden building as soon as possible. This will help to protect your building and prevent decay. See page 22 for a full guide and instructions. Once fully treated, score around the protective covers on the glazing and carefully peel the coverings back.