Page 1
DL2.5 USER MANUAL Battery Module 25V/100Ah File version-20240301-V1-EN Information might be subject to change without notice during product improving.
DL2.5 ESS Unit User Manual Statement of Law Copyright of this document belongs to Dyness Digital Energy Technology Co., LTD. No part of this documentation maybe excerpted, reproduced, translated, annotated or duplicated in any form or by any means without the prior written permission of Dyness Digital Energy Technology Co., LTD.
DL2.5 ESS Unit User Manual Preface Manual declaration DL2.5 lithium iron phosphate battery energy storage system can provide energy storage for photovoltaic power generation users through parallel combination.Our product can store extra electricity into battery from photovoltaic power generation system in daytime and supply stable power to user’s equipment as power backup at nighttime or any time when needed.
DL2.5 lithium iron phosphate battery system is a standard battery system unit, customers can choose a certain number of DL2.5 according to their needs, by connecting parallel to form a larger capacity battery pack, to meet the user's long-term power supply needs.
Page 12
1. The communication cable from the master CAN IN to the inverter comm port should be the correct one. 2. When the battery works with Dyness CAN protocol(CAN comm) ,before starting the battery,you need put the master DIP switch "# 3" to the "ON" position (to the top), then turn on the batteries.
Page 13
6. When you setup the master DIP as setting 1~4,all the slaves keep the DIP 0000,no need change. 7. If the energy storage system has only one DL2.5, it is the master itself, and still follow the above steps. Note: For more informationof matching inverter brands, please subject to the latest document <The list of compatibility between Dyness ESS and Inverters >.
Equipment installation Step 1 Installation preparation Confirm that the ON/OFF switch on the front panel of DL2.5 unit is in the “OFF” state to ensure no live operation. Step 2 Mechanical installation 1. Battery placement position determination 2.
Page 22
4. Shut down the system Installation preparation Prepare equipment and tools for installation. 2. Check the DL2.5 unit and confirm that the ON/OFF switch is in the "OFF" state to ensure the device is shut off.. Mechanical installation Wall hanging Installation method: 1.
Page 23
11.8N·m. Figure 3-4 5. When DL2.5 battery wall hanging installing, pay attention to insert the two screw heads on the back of the chassis into the slot on the wall hanging.As shown in figure 3-5 after the installation is completed.
Page 25
After the battery system installation is completed and the running is normal, you need to log in to the DYNESS official website to register the product installation and use information to make the product warranty effective. Please follow the instructions on the website to register.
Alarm description and processing When protection mode is activated or system failure occurred, the alarm signal will be given through the working status indicator on the front panel of the DL2.5. The network management can query the specific alarm categories.
Need help?
Do you have a question about the DL2.5 and is the answer not in the manual?
Questions and answers