Huawei UPS5000-E-180 kVA Quick Manual
Huawei UPS5000-E-180 kVA Quick Manual

Huawei UPS5000-E-180 kVA Quick Manual

Integrated ups, 30 kva power modules
Hide thumbs Also See for UPS5000-E-180 kVA:

Advertisement

Quick Links

UPS5000-E-180 kVA
(Integrated UPS, 30 kVA
Power Modules)
Quick Guide
Issue: 03
Date: 2025-01-15
Copyright © Huawei Digital Power Technologies Co., Ltd. 2025. All rights reserved.
Installation Preparation
• Before installing the equipment, read the product documentation carefully to get familiar with
product information and safety precautions. Equipment damage caused by failure to abide by
the storage, transportation, installation, and operation guidelines specified in the product
documentation is not covered by the product warranty. Log in to the technical support website
to view the product documentation and safety precautions.
• The information in this document is subject to change without notice. Every effort has been
made in the preparation of this document to ensure accuracy of the contents, but all
statements, information, and recommendations in this document do not constitute a warranty
of any kind, express or implied.
• Only qualified personnel are allowed to perform operations on the equipment. Operation
personnel should understand the system, its working principles, and relevant national/regional
standards.
• Wear dedicated personal protective equipment during operations. Use dedicated insulated tools
during electrical operations.
Environment requirements
520 kg
Operating
Relative humidity
Floor and support
The equipment
0%–95% RH
temperature
load capacity
room is airtight.
0–40°C
(non-condensing)
Heat source,
Dust or
Water source,
inflammable or
Direct sunlight
conductive
water vapor
explosive article
metal dust
Clearance
Unit: mm
Recommended Circuit Breaker Specifications for
a 380 V AC/400 V AC/415 V AC Voltage System
When the Short-circuit Current Going Through the Device
Input
Smart cooling product
IT load
Recommended Cable Specifications for
a 380 V AC/400 V AC/415 V AC Voltage System (mm
AC input
Input power
cable
Battery input
Smart cooling
product
Excessive
salt content
Output power
cable
Lighting
system
IT load
Volatile or
corrosive
substance
Equipotential
-
ground
Is Less than 65 kA
630 A/3P
63 A/3P
or
40 A/3P
63 A/1P
or
40 A/1P
2
)
L1: 2×120
L2: 2×120
L3: 2×120
N: 2×120
PE: 120
+: 2×120
N: 2×120
-: 2×120
PE: 120
L1: 6
L1: 10
L2: 6
L2: 10
L3: 6
L3: 10
(40 A)
(63 A)
N: 6
N: 10
PE: 6
PE: 10
L: 2.5
N: 2.5
PE: 2.5
L: 6
L: 10
N: 6
N: 10
(40 A)
(63 A)
PE: 6
PE: 10
GND: 16
1
Installing a Cabinet
Secured Installation
1
Determine the UPS cabinet installation position. Draw mounting holes in the
installation position according to the drawing.
Unit: mm
2
Drill holes in the mounting holes using a hammer drill, and install expansion bolts
in the holes.
M12 bolt
Spring washer
Flat washer
Concrete floor
Expansion sleeve
Expansion nut
3
Move the UPS cabinet over its castors to the installation position.
Adjust the anchor bolts until the castors hang in the air and the anchor bolts bear
4
4
all of the cabinet weight. Check the cabinet levelness using a level instrument.
5
Open the front and rear doors of the UPS cabinet. Insert expansion bolts into the
expansion bolt holes in the floor, and tighten the expansion bolts.

Advertisement

loading
Need help?

Need help?

Do you have a question about the UPS5000-E-180 kVA and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Huawei UPS5000-E-180 kVA

  • Page 1 63 A/3P Issue: 03 Smart cooling product Concrete floor Expansion sleeve Date: 2025-01-15 40 A/3P Copyright © Huawei Digital Power Technologies Co., Ltd. 2025. All rights reserved. 63 A/1P IT load Installation Preparation 40 A/1P Expansion nut Recommended Cable Specifications for •...
  • Page 2 Unsecured Installation Remove the cable hole protection panels from the top of the cabinet. Install AC input cables. Move the cabinet over its castors to the installation position. Adjust the castors of the cabinet until they are lifted from the floor, ensure that the anchor bolts bear all of the cabinet weight, and use a level instrument to check that the cabinet is level.
  • Page 3 One End The Other End Install battery cables. Install the signal cable. Cable Type No. Protocol Component Port Port Component PDF mains input circuit breaker PDF N bar PDF PE bar AC power cable PDF output circuit breaker PDF N bar PDF PE bar Internal Equipotential...
  • Page 4 Take out the desiccant. Turn on the input circuit breaker QF. Turn on the UPS input circuit breaker QF1. Maintenance bypass Bypass Load Mains Input Desiccant Huawei Digital Power Technologies Co., Ltd. Battery Huawei Digital Power Antuoshan Headquarters, Futian District, Shenzhen 518043 www.huawei.com...