Summary of Contents for Texas Instruments LM68645EVM
Page 1
300kHz to 2.2MHz switching frequency a 5V output to a load requiring 4.5A or less. • Minimized switch node ringing to reduce The LM68645EVM can be used in many different Electromagnetic Interference (EMI) configurations by substituting other versions of the •...
Page 2
4.5A of load current from an input voltage as high as 65V. For more details, see Section 1.4. 1.2 Kit Contents This kit includes one LM68645EVM. 1.3 Specification Performance characteristics for the LM68645EVM are found in Table 1-1 Unless otherwise stated: V = 24V, V = 5V, T = 25ºC.
Page 3
Hardware 2 Hardware 2.1 Additional Images The front and back of the LM68645EVM are shown in Figure 2-1 Figure 2-2, respectively. Figure 2-1. LM68645EVM (Top View) Figure 2-2. LM68645EVM (Bottom View( 2.2 Power Requirements Any power source in the range of 6V to 63V, and capable of delivering 3A, can be used to evaluate the LM68645EVM, under normal conditions.
Page 4
2.3 Setup and Operation This section describes the connectors, test points, and jumpers on the EVM and how to properly connect, set up, and use the LM68645EVM. For location of connectors and jumpers and typical setup, see Figure 2-3.
Page 14
STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
Page 15
www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
Page 16
www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
Page 17
www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
Need help?
Do you have a question about the LM68645EVM and is the answer not in the manual?