The Texas Instruments LM63625EVM evaluation module (EVM) helps designers evaluate the operation
and performance of the LM63625-Q1 buck regulator. The LM63625-Q1 is a family of easy-to-use
synchronous step-down DC/DC converters capable of driving up to 2.5 A of load current from an input
voltage of 3.5 V to 36 V. The LM63625EVM features a selectable output voltage of 3.3 V or 5 V and a
switching frequency of 2.1 MHz . See the
down Voltage Converter Data Sheet
The EVM options are found in
LM63625EVM
..........................................................................................................................
1
Setup
.....................................................................................................................
2
Operation
3
Performance Curves
.....................................................................................................................
4
Schematic
5
Board Layout
6
Bill of Materials
1
EVM Board Connections
2
EVM Card Edge Connections
3
Jumper Locations
....................................................................................................................
4
FRA Setup
5
Efficiency Without Input Filter AUTO Mode, V
SNVU599A – February 2019 – Revised October 2019
Submit Documentation Feedback
Advance Information
LM636x5-Q1 3.5-V to 36-V, 1.5-A, and 2.5-A Automotive Step-
for additional features, detailed description, and available options.
Table
1.
Table 1. Device and Package Configurations
EVM
LM63625DQPWPRQ1
........................................................................................................
................................................................................................................
.............................................................................................................
....................................................................................................
..............................................................................................
............................................................................................................
Copyright © 2019, Texas Instruments Incorporated
SNVU599A – February 2019 – Revised October 2019
LM63625EVM EVM User's Guide
DEVICE
Contents
List of Figures
= 3.3V, f
= 2.1 MHz
OUT
SW
User's Guide
FREQUENCY/OUTPUT
CURRENT
2100 kHz / 2.5 A
.............................................
LM63625EVM EVM User's Guide
3
6
6
9
10
13
3
4
4
5
6
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LM63625EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments LM63625EVM

  • Page 1 DC/DC converters capable of driving up to 2.5 A of load current from an input voltage of 3.5 V to 36 V. The LM63625EVM features a selectable output voltage of 3.3 V or 5 V and a switching frequency of 2.1 MHz . See the LM636x5-Q1 3.5-V to 36-V, 1.5-A, and 2.5-A Automotive Step-...
  • Page 2: Table Of Contents

    ..................Device and Package Configurations ....................BOM for LM63625EVM Trademarks All trademarks are the property of their respective owners. LM63625EVM EVM User’s Guide SNVU599A – February 2019 – Revised October 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 3 This section describes the test points and connectors on the EVM and how to properly connect, set up, and use the LM63625EVM . Either the test points on the top of the board or the card edge connector can be used for connections. See...
  • Page 4 GND, the part operates in auto mode where pulse frequency modulation (PFM) is engaged. 5V or 3.3V FPWM or Auto Output Voltage Selection Jumper Selection Jumper Figure 3. Jumper Locations LM63625EVM EVM User’s Guide SNVU599A – February 2019 – Revised October 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 5 Figure ^ _ /v‰µš š} ^ _ /v‰µš š} network analyzer network analyzer Signal Injection Figure 4. FRA Setup SNVU599A – February 2019 – Revised October 2019 LM63625EVM EVM User’s Guide Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 6 = 2 × 22 µF , I Slew Rate = 1 A/µs = 2 × 22 µF, I Slew Rate = 1 A/µs LM63625EVM EVM User’s Guide SNVU599A – February 2019 – Revised October 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 7 = 2 × 22 µF, I Slew Rate = 1 A/µs = 2 × 22 µF, I Slew Rate = 1 A/µs SNVU599A – February 2019 – Revised October 2019 LM63625EVM EVM User’s Guide Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 8: Ic Temperature = 48.2°C 2 V

    , 3.3 V = 2.5 A, f = 2.1 MHz , 5 V = 2.5 A, f = 2.1 MHz LM63625EVM EVM User’s Guide SNVU599A – February 2019 – Revised October 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 9: Submit Documentation Feedback

    Advance Information Schematic www.ti.com Schematic Figure 19. LM63625EVM Schematic SNVU599A – February 2019 – Revised October 2019 LM63625EVM EVM User’s Guide Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 10: Top View Of Evm

    Board Layout CAUTION Caution Hot surface. Contact may cause burns. Do not touch. Figure 20. Top View of EVM LM63625EVM EVM User’s Guide SNVU599A – February 2019 – Revised October 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 11: Evm Top Copper Layer

    Advance Information Board Layout www.ti.com Figure 21. EVM Top Copper Layer Figure 22. EVM Mid Layer One SNVU599A – February 2019 – Revised October 2019 LM63625EVM EVM User’s Guide Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 12: Evm Mid Layer Two

    Advance Information Board Layout www.ti.com Figure 23. EVM Mid Layer Two Figure 24. EVM Bottom Copper Layer LM63625EVM EVM User’s Guide SNVU599A – February 2019 – Revised October 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 13: Bom For Lm63625Evm

    Advance Information Bill of Materials www.ti.com Bill of Materials Table 2. BOM for LM63625EVM DESIGNATOR COMMENT DESCRIPTION MANUFACTURER PART NUMBER QUANTITY CAP, CERM, 0.22 µF, 16 V, ±10%, X7R, AEC- CBOOT Samsung CL10B224KO8VPNC Q200 Grade 1, 0603 CAP, CERM, 4.7 µF, 50 V, ±10%, X7R, 1206 C3216X7R1H475K160AC CAP, CERM, 2.2 µF, 50 V, ±10%, X7R, AEC-...
  • Page 14: Snvu599A - February 2019 - Revised October 2019

    NOTE: Page numbers for previous revisions may differ from page numbers in the current version. Changes from Original (February 2019) to A Revision ....................Page ........................• First public release ........................• Updated schematic Revision History SNVU599A – February 2019 – Revised October 2019 Submit Documentation Feedback Copyright © 2019, Texas Instruments Incorporated...
  • Page 15 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 16 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 17 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 18 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 19 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 20 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...

This manual is also suitable for:

Lm63625dqpwptq1Lm63625-q1Lm63635-q1

Table of Contents