MAIN SPECIFICATIONS : Overall assembled size : W6.1 x L9.15 x H3.66 (m) / 20 x 30 x 12 (ft) Roll up door : W4.3 x H3.2 (m) /14.1 x 10.5 (ft) CONCRETE FOUNDATION SIZE SEE BELOW FIGURE. The layout of foundation (one).
Page 3
The layout of foundation(two). Note: the ground anchor is installed on the cement block. 2/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Baseplate layout. PRIOR TO ASSEMBLY Please read the instructions carefully before installation. It is important to follow your local safety regulations and industry standards during installation. Regulations may include but are not limited to : Safety helmets, protective eyewear, and clothing ...
Page 5
TMG-ST2031PV PART LIST PARTS GRAPHICAL DESCRIPTION LENGTH CODE Peak arch tube φ42xL1712mm Middle bent tube φ42xL2145mm Lower bent tube φ42xL2128mm Roof purlin φ42xL1261mm (horizontal tube) Bottom tension tube φ32x1260mm (for both long bottom sides) Middle truss connectors W50xL180mm Front and rear connectors...
Middle truss baseplate W150xL150mm Tube clamp φ42 Expansion bolt φ14x100mm (not included) Half round head bolt M8x60mm Hex bolt and nut M8x60mm Hex bolt and nut M10x30mm Hex bolt and nut M10x20mm Top cover panel W9480xL10920mm Front and rear cover panel W3700xL6060mm Braided rope 1 bundle...
Page 7
STEP 2 : INSTALL BASE PLATES, ALL BASE PLATES MUST BE INSTALLED FIRMLY WITH EXPANSION BOLTS. The diagonal X and Y must be equal. Installation diagram of expansion bolt. PART PART 6/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Page 8
STEP 3 : ASSEMBLE ALL TRUSSES. PART PART 7/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Page 9
STEP 4 : WRAP (#17) AROUND THE SHARP POINTS OF THE JOINT TO AVOID FRICTION BETWEEN THE FABRIC AND THE INTERFACE. PART 8/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Page 10
STEP 5 : PUT UP THE ALL TRUSS. PART 9/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Page 11
STEP 6 : PUT UP THE REST TRUSSES. PART PART 10/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Page 12
STEP 7 : INSTALL THE DIAGONAL BRACING BARS (#6). PART 11/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Page 13
STEP 8 : INSTALL FRONT AND REAR FABRIC PANELS. PART PART 12/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
Page 14
STEP 9 : INSTALL THE TOP COVER (#14) STRETCH AND TIGHTEN TOP COVER. PART PART 13/14 TOLL FREE:1-877-761-2819 ►www.tmgindustrial.com...
AFTER THE INSTALLATION Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported. Check all bolts and nuts as well as all connection points to make sure they are all in good position.
Need help?
Do you have a question about the TMG-ST2031PV and is the answer not in the manual?
Questions and answers