MAIN SPECIFICATIONS : Overall assembled size : W3.66 x L : W3.66 x L6 x H2.9 (m) / 12 x 19.7 x 9.5 (ft) Width : 3.66 m / 12ft Length : 6 m / 19.7ft Ridge peak height : 2.9 m / 9.5 9.5 ft ...
Page 3
The layout of foundation(two) Note: the ground anchor is installed on the the ground anchor is installed on the cement block. www.tmgindustrial.com www.tmgindustrial.com 2/16 TOLL FREE: 1 REE: 1-877-761-2819 ▶...
Baseplate layout. PRIOR TO ASSEMBLY Please read the instructions carefully before installation. It is important to follow your local safety regulations and industry standards during installation. Regulations may include but are not limited to: Safety helmets, protective eyewear, and clothing ...
Page 5
TMG-MSC1220F PART LIST PARTS GRAPHICAL DESCRIPTION LENGTH LENGTH CODE Peak arch tube L483 483mm Middle rafter tube L1280 1280mm Shoulder tube L1034 034mm Sidewall tube L1524 524mm Short casing L198mm Metal sheet tile C W580xL16 xL1620mm (front and rear truss)
Page 7
STEP 1 : BASEPLATE POSITIONING AND INSTALLATION. STEP 1 : BASEPLATE POSITIONING AND INSTALLATION. The diagonal X and Y must be equal. he diagonal X and Y must be equal. Installation diagram of expansion bolt. Installation diagram of expansion bolt. ...
Page 8
STEP 2 : INSTALL ALL TRUSSES. Install front and rear trusses. Note : use (#18) at the links of (#3) and (#4) to reinforce the inner side the links of (#3) and (#4) to reinforce the inner side PART PART 24x2 12x2...
Page 9
INSTALL OTHER TRUSSES. (3 TRUSSES) . (3 TRUSSES) PART PART 24x3 12x3 Lay down all (5) trusses on the ground as Lay down all (5) trusses on the ground as figure when the assembly is all completed and before moving to when the assembly is all completed and before moving to ...
Page 10
STEP 3 : PUT UP THE ALL TRUSSES. The front and rear trusses are installed with one side of (#12) Steel cable mounting plate facing outwards. PART www.tmgindustrial.com 9/16 TOLL FREE: 1-877-761-2819 ▶...
Page 11
STEP 4 : INSTALL THE COLOR IRON TILE. STEP 4 : INSTALL THE COLOR IRON TILE. Before installation, ensure that the distance between centers of each collapse is 1500mm. Install the first row Before installation, ensure that the distance between centers of each collapse is 1500mm. Install the first row Before installation, ensure that the distance between centers of each collapse is 1500mm.
Page 12
Install the first color iron tile. Take the first colored iron tile at the top as the benchmark, ensure that both Install the first color iron tile. Take the first colored iron tile at the top as the benchmark, ensure that both Install the first color iron tile.
Page 13
Install all color iron tiles in turn, make sure that both ends of each color iron tile are aligned, and apply Install all color iron tiles in turn, make sure that both ends of each color iron tile are aligned, and apply Install all color iron tiles in turn, make sure that both ends of each color iron tile are aligned, and apply ...
Page 14
STEP 5 : INSTALL THE FRONT AND REAR EDGING STRIPS. Start to install the color iron tile edge protector (#9) from one side, and align one end with the color iron tile edge. The opening of the edge banding strip of the color iron tile shall be aligned with the end face of the color iron tile, and the bottom buckle can be pressed into place.
Page 15
Install the edge buckle (#10), and the two raised card points of the Edge buckle are aligned with the square holes at the interfaces of the two color iron tile edge bands, and then press the buckle in place. The front and rear installation methods are the same.
Page 16
STEP 6 : INSTALL THE WIRE ROPE. PART Now that your building is completely installed, we need to check all components and trusses to make sure the whole Now that your building is completely installed, we need to check all components and trusses to make sure the whole Now that your building is completely installed, we need to check all components and trusses to make sure the whole structure is rectangular.
AFTER THE INSTALLATION Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole Walk around and inspect the shelter periodically to make sure all components are still firmly secured and the whole shelter is well supported.
Need help?
Do you have a question about the TMG-MSC1220F and is the answer not in the manual?
Questions and answers