Page 1
5877 Personas ATM Site Preparation Rear of Terminal 37.5mm (1.5in.) (0.2in.) 16mm (0.6in.) 426mm (16.8in.) 16mm (0.6in.) (0.2in.) 120mm (4.7in.) 272.5mm (10.7in.) Front of Terminal Publication ID: B006-6208-A000 Date: 0801...
Page 2
NCR, therefore, reserves the right to change specifications without prior notice. All features, functions, and operations described herein may not be marketed by NCR in all parts of the world. In some instances, photographs are of equipment prototypes. Therefore, before using this document, consult with your NCR representative or NCR office for information that is applicable and current.
Federal Communications Commission (FCC) Radio Frequency Interference Statement Note: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment.
If this equipment does cause interference, which can be determined by turning the equipment off and on, the user is encouraged to consult an NCR service representative immediately. Caution NCR Corporation is not responsible for any radio or television...
Preface This book contains the information necessary for the preparation of a site conforming to NCR specifications. It is very important that the site complies with the requirements specified in this document because, once the equipment has been installed, deficiencies in site preparation or the problems caused by these deficiencies are much more difficult to detect and correct.
Page 8
NCR will not be liable in respect of any comment, suggestion or advice given by its staff or in respect of any failure to give advice.
Table of Contents Contents About This Document Preface ......................vii Chapter 1 Planning Check List and Installation Accessories Planning Check List ................1-1 Installation Accessories ................1-2 Chapter 2 Physical Requirements Overview ....................2-1 Customer Responsibilities..............2-2 Product Identification ................2-3 Packaging Dimensions .................2-4 Terminal Dimensions................2-5 Installation And Service Clearances ...........2-6 Securing Bolt Location Points ............2-8 Securing Bolts..................2-9...
Page 10
Table of Contents Chapter 3 Electrical Requirements Power Quality Distribution And Grounding Requirements..3-1 AC Requirements ................3-1 Input Voltage Setting............... 3-1 Power Cable ..................3-2 Grounding Requirements ............... 3-3 Transient Power Loss ..............3-3 EMI Susceptibility ................3-3 EMI Emission ..................3-3 Communications Requirements ............
Page 11
AC Power Line Transient Protection..........A-1 Data Line Transient Protection............A-3 Appendix B Power Protection NCR Power Protection and Cabling Products ......... B-1 AC Power Line Transient Protection..........B-1 Data Line Transient Protection ............B-2 Uninterruptible Power Supplies ........... B-2 Contact Information ................ B-4 Index Index ....................Index-1...
Page 12
Table of Contents P77 ATM - Site Preparation...
Table of Contents Planning Check List and Installation Accessories Chapter 1 Planning Check List and Installation Accessories Planning Check List Installation Accessories P77 ATM - Site Preparation...
Page 14
Table of Contents Planning Check List and Installation Accessories P77 ATM - Site Preparation...
Planning Check List and Installation Accessories Planning Check List Planning Check List To assist in preparing your site for the arrival of the terminal, it is recommended that the various procedures, detailed in the following check list be carried out prior to the arrival of the terminal.
Selection of screwdrivers for flat blade and cross head applications Forklift or a lifting/moving device Packing to protect exterior of the terminal while on trolleys Lifting Trolleys (may need to be modified, refer to the NCR 5877 Personas ATM Installation Manual (B006-6209-A000) Scissors. P77 ATM - Site Preparation...
Physical Requirements Overview Overview The NCR 5877 Personas ATM (P77) is a self-service ATM which may be installed in any suitable interior location. The P77 is designed to enable customers to avail themselves of a range of services such as:...
Physical Requirements Customer Responsibilities Customer Responsibilities The customer must do or provide the following: When required by NCR, provide the NCR customer service representative with appropriate drawings that indicate: Location of the equipment Site wiring (power and signal, paths and lengths) Location of other equipment capable of generating electrical noise, electromagnetic interference, heat, etc.
Product Identification Product Identification The product is identified by a class type number (5877), and a 4- digit model number which is printed on a label (similar to the following) attached to the inside wall of the P77 near the ON/OFF switch.
Physical Requirements Packaging Dimensions Packaging Dimensions The type of packaging used is dependent on the shipping method - road or air/sea freight. If access to the installation location is not wide enough to allow the package to pass through, unpack the P77 in an area with sufficient access.
Physical Requirements Installation And Service Clearances Installation And Service Clearances The following illustrations show both minimum and recommended floor areas required for installing, servicing and replenishing a P77. Note: This illustrations show the safe door in the service position. Minimum 908 mm (35.8 in.) 930 mm...
Page 25
Physical Requirements Installation And Service Clearances Recommended 1492 mm (58.7 in.) 1213 mm (47.8 in.) 753 mm (29.7 in.) 38 mm (1.5 in.) Cable Access on Rear Panel 38 mm 472 mm 548 mm (1.5 in.) (18.6 in.) (21.6 in.) P77 ATM - Site Preparation...
Physical Requirements Installation And Service Clearances The following illustrations show the dimensions for the securing Securing Bolt bolt location points for UL Standard Security safe viewed from Location Points above. Rear of Terminal 37.5mm (1.5in.) (0.2in.) 16mm (0.6in.) 426mm (16.8in.) 16mm (0.6in.) (0.2in.)
Physical Requirements Installation And Service Clearances The P77 must be bolted to the floor using two (2) security bolts. The Securing Bolts floor must be capable of taking the anchor points for the bolts. Note: The securing bolts, anchors and appropriate washers must be supplied by the owning organisation.
The P77 can be stabilised by using the bolts that secure the transportation feet to the terminal. Refer NCR 5877 Personas ATM Installation Manual (B006-6209-A000). Note: Floor loading is calculated by dividing the maximum weight of the P77 by the surface area of the P77 base (the area in contact with the floor).
Physical Requirements Access For All Access For All The P77 is designed to meet optimum height and reach requirements to provide comfortable access for all users. This design takes account of wheelchair users, the visually impaired and all others. For wheelchair users, optimized parallel approach is offered, providing security and private space if installed according to recommendations.
Physical Requirements Access For All The following illustrations shows the heights from the P77 base Heights To Main (safe floor) to the main items, or exit slots, located on the P77 facia. Facia Items 2-12 P77 ATM - Site Preparation...
Physical Requirements Access For All The following illustration shows the recommended clearance for Recommended wheelchair approach. Wheelchair Clearance 1500 mm (59.1 in.) Wheelchair Turning Circle O 1500mm 1500 mm (59.1 in.) 750 mm 750 mm (29.5 in.) (29.5 in.) P77 ATM - Site Preparation 2-13...
Page 32
Physical Requirements Access For All 2-14 P77 ATM - Site Preparation...
Table of Contents Electrical Requirements Chapter 3 Electrical Requirements Power Quality Distribution And Grounding Requirements AC Requirements Input Voltage Setting Power Cable Grounding Requirements Transient Power Loss EMI Susceptibility EMI Emission Communications Requirements High Order Communications Cables High Order Communications Standard Cable (RS-232) Alarm Interface Cable P77 ATM - Site Preparation...
Page 34
Table of Contents Electrical Requirements P77 ATM - Site Preparation...
Electrical Requirements Power Quality Distribution And Grounding Requirements Power Quality Distribution And Grounding Requirements Voltage transients, line noise, surges, sags, impulses, and spikes may be experienced routinely or sporadically. When such phenomena occur, the use of protective devices, as described in Appendix A and B, may be required to ensure proper operation of the equipment.
Electrical Requirements Power Quality Distribution And Grounding Requirements The power cable supplied with the P77 is fitted with a NEMA type Power Cable 5-15P power source connector. If this is not suitable for your use, it should be replaced with a suitable power source connector. This connector must be wired as shown below: The power cable supplied is 3m (9ft 9 in.) in length.
50% of the nominal value for a maximum of one half cycle at a Loss maximum rate of 1 every 10 seconds. The P77 meets NCR CES-2-11-09 and CES-2-11-10 (details available EMI Susceptibility on request). The P77 meets FCC Class A and FTZ VDE 0871/0875 requirements EMI Emission for radiated and conducted emission.
Appendix A, may be required to ensure proper operation of the equipment. It is the responsibility of the customer to assure that all installation preparations are complete and in compliance with NCR specifications and requirements and with all national, state or local telephone and telegraph regulations and laws.
Page 39
Electrical Requirements Communications Requirements The interconnecting cable to the remote modem should not exceed 15.24m (50ft.) in length, and must conform to the specification and wiring given in the following diagram. P77 ATM - Site Preparation...
Electrical Requirements Communications Requirements Cable Preparation At a point 940mm (37 in.) from the connector end of the cable, remove a 20mm (0.8 in.) section of the outer sleeve as shown. Note: Take care not to cut through the cable shielding when removing the outer sleeve.
Page 41
Electrical Requirements Communications Requirements The interconnecting cable to the P77 is similar for both alarm interface options and must conform to the following specification and wiring: P77 ATM - Site Preparation...
Page 43
Electrical Requirements Communications Requirements Cable Preparation Starting from the connector end, remove 20mm (0.8 in.) sections of the outer sleeve at the distances detailed in the following diagram. Note: Take care not to cut through the cable shielding when removing the outer sleeve. 20 mm 20 mm 20 mm...
Table of Contents Installation Site Environmental Requirements Chapter 4 Installation Site Environmental Requirements Environmental Requirements Temperature And Humidity Normal Operating Range (Interior ATM Environment) All Environments Barometric Pressure Heat Dissipation Air Flow Temperature Rise Acoustical Noise P77 ATM - Site Preparation...
Page 46
Table of Contents Installation Site Environmental Requirements P77 ATM - Site Preparation...
Installation Site Environmental Requirements Environmental Requirements Environmental Requirements For the terminal to function correctly, the installation site should meet the following environmental requirements. The terminal will operate over a range of temperature and Temperature And humidity. However, continuous operation at or near the range Humidity limits or in a location where the temperature and humidity change beyond the specification, should be avoided.
Temperature Rise (5.4 The P77 complies with the following standards. Acoustical Noise NCR Corporate Standard CES 2-10-02: 65 decibels (A) Sound Pressure (operating mode) 65 decibels (A) Sound Power (idle mode) 68 decibels (A) Sound Power (operating mode). International Standard ISO 7779: Acoustic Noise Emitted by Computer &...
Decals Decal Specifications Decal Specifications This following illustration shows the approximate locations for the decals which you may wish to fit to the front of your P77. Card Accept Window Receipt Card Insert Card Orientation Window Cash Specifications and guidelines for the various decals are given in the following sections.
3mm (0.12in.) radius on all corners 95mm (3.74in.) 111mm (4.37in.) The insert should be a maximum of 0.8mm (0.031 in.) thick. NCR recommend that the insert be made from one of the following materials: Polycarbonate Polyester Paper.
Decals Decal Specifications If the Card Reader Module window is to be customised to indicate Card Orientation card orientation. The card/decal to be inserted should be a Decal maximum of 0.75mm (0.029 in.) thick and conform to the following dimensions: 3mm (0.12in.) radius on all corners 86mm (3.35in.)
Decals Decal Specifications Decals can be used to identify the exit/entry slots for the receipt Exit/Entry Slot printer, cash dispenser and card entry. The decal should be a Decals maximum of 0.5mm (0.02 in.) thick and it is recommended that it is made from Textured Polycarbonate with 3M 467 High Performance MP adhesive.
Page 55
Decals Decal Specifications On the P77, the MEIs are within the decal location recesses, this has to be considered when designing decals. The following are recommendations only: if the background of the decal is transparent the decal can be the full depth 12.5mm (0.49in.) with/without a section (55mm (2.17in.) x 4mm (0.16in.) - the dotted area shown on the decals) cut out for the MEI.
Page 56
Decals Decal Specifications P77 ATM - Site Preparation...
Table of Contents Transient Protection Appendix A Transient Protection AC Power Line Transient Protection Data Line Transient Protection P77 ATM - Site Preparation...
Page 58
Table of Contents Transient Protection P77 ATM - Site Preparation...
Improvement of any deficiencies in power quality is a customer responsibility. Malfunction and/or component failure as a result of power quality problems are/is not covered by NCR Maintenance Agreement, NCR accepts no liability for any such occurrence nor for its consequences. When power transient suppression is required, the suppressors...
Page 60
Transient Protection AC Power Line Transient Protection Dissipate energy to match the appropriate application categories as defined by IEEE Standard 587. These categories are described in the following table: Comparable Transient Location Category to IEC No 664 Waveform Amplitudes Category µ...
Be installed in accordance with all applicable local, state, and national electrical codes and regulations. Note: In certain countries, NCR is able to supply both power and data line transient suppressors as well as a comprehensive line of power conditioning equipment. For application data, contact your NCR Customer Services Division Representative.
Page 62
Transient Protection Data Line Transient Protection P77 ATM - Site Preparation...
Table of Contents Power Protection Appendix B Power Protection NCR Power Protection and Cabling Products AC Power Line Transient Protection Data Line Transient Protection Uninterruptible Power Supplies On-line UPS Enhanced Line-Interactive UPS Line-Interactive UPS Contact Information P77 ATM - Site Preparation...
Page 64
Table of Contents Power Protection P77 ATM - Site Preparation...
NCR Power Protection and Cabling Products NCR Power Protection and Cabling Products Power protection equipment suitable for use with NCR ATMs can be purchased from the NCR Power Protection and Cabling group. Some of these products are outlined below. The following products can be purchased from the NCR Power...
NCR Power Protection and Cabling Products The following Data Line Transient Voltage Surge Suppressors can Data Line Transient be purchased from the NCR Power Protection and Cabling group to Protection help protect the communications port against harmful transient surges from both external and internal sources not eliminated by...
Page 67
Power Protection NCR Power Protection and Cabling Products extended battery cabinets available for extended run times on-board SNMP optional on all models standard LAN/serial (RS-232) network interface standard rack-mountable unit design also available in 1500 VA, 2000 VA and 3000 VA sizes.
LAN/serial (RS-232) network interface hot-swappable batteries available in 450 VA, 700 VA, 1500 VA sizes. For more information from NCR’s Power Protection and Cabling Contact Information Group on the power protection, data line transient suppressors and uninterruptible power supply products available, warranty or...
Page 69
Index Index About This Document Preface vii AC Current Requirement s3-1 AC Power Line Transient Protection A-1, B-1 Access For All 2-11 Recommended Wheelchair Clearance 2-13 Alarm Interface Cable 3-6 Wiring 3-8 Americans with Disabilities Act (ADA) 2-11 Cables Alarm Interface 3-6 High Order Communications 3-4 High Order Communications Standard (RS-232) 3-4 Canadian Standards Association (CSA) 2-11...
Page 70
Index Electrical Requirements 3-1 Communications Requirements 3-4 Power Distribution And Grounding 3-1 EMI Emission 3-3 EMI Susceptibility 3-3 Environmental Requirements 4-1 Acoustical Noise 4-2 Air Flow 4-2 All Environment s4-2 Barometric Pressure 4-2 Heat Dissipation 4-2 Temperature And Humidity 4-1 Temperature Rise 4-2 Floor Covering 2-9 Floor Loading 2-10...
Page 71
Index Positioning 2-9 Packaging Dimensions 2-4 Physical Requirements Access For All 2-11 Customer Responsibilities 2-2 Installation And Service Clearances 2-6 Overview 2-1 Packaging Dimensions 2-4 Product Information 2-3 Terminal Dimensions 2-5 Planning Check List 1-1 Positioning The P77 2-9 Power Cable 3-2 Power Protection And Cabling Products B-1 AC Power Line Transient Protection B-1 Contact Information B-4...
Page 72
Index Temperature And Humidity 4-1 Terminal Dimensions 2-5 Transient Power Loss 3-3 Transient Protection AC Power Line A-1 Data Line A-3 Uninterruptible Power Supplies B-2 Enhanced Line-Interactiv eB-3 Line-Interactive B-4 On-line B-2 Weight 2-10 Index-4 P77 ATM - Site Preparation...
Page 73
NCR 5877 Personas ATM - Site Preparation Number: B006-6208- A000 Date: NCR welcomes your feedback on this publication. Your comments can be of great value in helping us improve our information products. You may send your comments, electronically, to the Information Solutions Department at Dundee.
Page 74
Thank you for your evaluation of this publication. Fold the form where indicated, tape (please do not staple), affix stamp and drop in the mail. F 8763-0695 Fold Affix Postage Stamp Here NCR Financial Solutions Ltd. Information Solutions Kingsway West Dundee Scotland DD2 3XX...
Need help?
Do you have a question about the 5877 and is the answer not in the manual?
Questions and answers