Quick Installation Guide
EES6-10K - M1
Overview
1.1 Scope of Delivery
2
1
6
5
1.2 Port Description
1
2
2
Mechanical Installation
2.1 Installation Requirement
300 mm
150 mm
150 mm
300 mm
Warning
Do not select installtion locations storing flammable material, which may cause fire or
explosion!
2.2 Mounting
4
3
Documents
8
7
3
4
5
6 7
0°- 15°
1) Drill 3 mounting holes of about
4 cm deep with a 10 mm drill bit
2) Insert expansion tubes into
holes
3) Fix the bracket on the wall with
screws
No.
1
2
3
4
5
6
7
8
No.
1
2
3
PV
DC
CT
Name
Ports
Switch
Port
1) A minimum 150 mm clearance should be kept
between two inverters and a minimum 300 mm
clearance between inverters and the ground.
2) Install inverter vertically or with a backward tilt
within 15°.
Description
Inverter
Wall Bracket
Expansion Screws
Fastening Screws
DC Connectors
AC Connectors
WiFi/GPRS Stick
Documents
4
5
6
Wifi/
COM/
Grounding
GPRS
Meter/
Port
Port
DRM
1) Hang the inverter
on the bracket
2) Lock the inverter to
the bracket with
screws
Quantity
1
1
3
3
3/4 pairs
1
1
1
7
AC
Port