Quick Installation Guide
EET15-30K-M1
Overview
1.1 Scope of Delivery
1
2
6
5
1.2 Port Description
1
2
Mechanical Installation
2.1 Installation Requirement
300 mm
150 mm
150 mm
300 mm
Warning
Do not select locations storing flammable material, which may cause fire or explosion!
2.2 Mounting
3
4
Documents
8
7
3 4 5 6
2
7
0°- 15°
1) Drill 4 mounting holes of about
4 cm deep with a 10 mm drill bit
2) Insert expansion tubes into
holes
3) Fix the bracket on the wall with
screws
No.
1
2
3
4
5
6
7
8
No.
1
2
DC
PV
Name
Switch
Ports
1) A minimum 150 mm clearance should be kept
between two inverters and a minimum 300 mm
clearance between inverters and the ground.
2) Install inverter vertically or with a backward tilt
within 15°.
Description
Inverter
Wall Bracket
Expansion Screws
Fastening Screws(M4)
Fastening Screws(M3)
DC Connectors
AC Connector
WiFi/4G Stick
Documents
5
3
4
Wifi/
CT
Grounding
4G
Port
Port
I
1) Hang the inverter
on the bracket
2) Lock the inverter to
the bracket with
screws
Quantity
1
1
3
3
4
6
Pairs
1
1
1
6
7
COM/
AC
Meter
Port
/DRM
Need help?
Do you have a question about the EET15-30K-M1 and is the answer not in the manual?
Questions and answers