Download Print this page
Each Energy EET5-20K-M1 Quick Installation Manual

Each Energy EET5-20K-M1 Quick Installation Manual

Advertisement

Quick Links

Quick Installation Guide
EET5-20K-M1
Overview
1.1 Scope of Delivery
1
2
5
6
1.2 Port Description
2
Mechanical Installation
2.1 Installation Requirement
300 mm
150 mm
150 mm
300 mm
Warning
Do not select locations storing flammable material, which may cause fire or explosion!
2.2 Mounting
3
4
Documents
7
8
0°- 15°
1) Drill 3 mounting holes of about
4 cm deep with a 10 mm drill bit
2) Insert expansion tubes into
holes
3) Fix the bracket on the wall with
screws
No.
1
2
3
4
5
6
7
8
No.
1
2
PV
DC
Name
Ports
Switch
1) A minimum 150 mm clearance should be kept
between two inverters and a minimum 300 mm
clearance between inverters and the ground.
2) Install inverter vertically or with a backward tilt
within 15°.
Description
Inverter
Wall Bracket
Expansion Screws
Fastening Screws
DC Connectors
AC Connector
WiFi/GPRS Stick
Documents
5
3
4
COM/
Wifi/
CT
Meter
4G
Port
/DRM
1) Hang the inverter
on the bracket
2) Lock the inverter to
the bracket with
screws
Quantity
1
1
3
3
3/4
Pairs
1
1
1
6
7
Grounding
AC
Port
Port

Advertisement

loading
Need help?

Need help?

Do you have a question about the EET5-20K-M1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Each Energy EET5-20K-M1

  • Page 1 Quick Installation Guide EET5-20K-M1 Overview 1.1 Scope of Delivery Description Quantity Inverter Wall Bracket Expansion Screws Fastening Screws Documents DC Connectors Pairs AC Connector WiFi/GPRS Stick Documents 1.2 Port Description COM/ Grounding Wifi/ Meter Name Ports Port Switch Port Port...
  • Page 2 Note:Insert the wires to corresponding conductors in the terminal block with a 2 mm wide socket head wrench Copyright © Each Energy Technology (Suzhou) Co., Ltd. Subject to change without notice.