Amendments to the manual
2024.09 Version 3
•
Added ChillPAC LP and DualPAC and related information throughout.
•
Updated Figure 1.
•
Added Figure 2.
•
Updated point D and added point E in Planning the machine room section.
•
Updated Connection of piper, Leak and pressure test, and Coupling sections.
ChillPAC, ChillPAC LP, HeatPAC, and DualPAC units
Note that this installation guide only describes the main issues to consider during
installation.
Further installation guidance is available in the operating manual, which must be read
carefully before operating the equipment.
Ensure that all local and national installation and safety precautions are observed.