2. Installation
This chapter involves unpacking, temperature requirements and installation of the
instrument.
2.1 Unpacking and Inspection
1.
Visually inspect the cardboard box for damage. Report any damage immediately.
2.
Lift the instrument out of the cardboard box and place it on a flat surface.
The instrument is shipped in one cardboard box that includes:
1 Main unit complete
1 Hand unit complete
1 Coaxial cable
1 Battery charger
1 Adapter kit
1 Operator's manual
3.
The above list is subject to change, refer to the packing list for accurate descrip-
tion of contents.
If any parts are missing or if the parts are damaged, report it immediately.
4.
Please keep all shipping and packaging materials, as they may be required for
later transportation, at least during the warranty time.
CS624 Qseal-extra Operator´s manual
15
Need help?
Do you have a question about the Qseal-extra and is the answer not in the manual?
Questions and answers