Uplinking The Switch; Figure 3-3: Attaching Brackets To The Switch; Figure 3-4: Mounting The Switch - Cisco SRW224P User Manual

24-port 10/100 + 2-port gigabit switch with webview and power over ethernet
Table of Contents

Advertisement

24-Port 10/100 + 2-Port Gigabit Switch with Webview and Power over Ethernet
Rack-Mount Placement
To rack-mount the Switch in any standard 19-inch rack, follow the instructions described below.
1. Place the Switch on a hard flat surface with the front panel faced towards your front side
2. Attach a rack–mount bracket to one side of the Switch with the supplied screws.
3. Secure the brackets tightly.
4. Follow the same steps to attach the other bracket to the opposite side.
5. After the brackets are attached to the Switch, use suitable screws to securely attach the brackets to any
standard 19-inch rack.
6. Connect the Switch to network devices according to the Hardware Installation instructions above.

Uplinking the Switch

To uplink the Switch, connect one end of a Cat5 (or better) cable into one of the 24 10/100 ports, and then
connect the other end of the cable into the peripheral device's uplink port. MDI/MDIX will automatically detect the
speed and cable type.
The hardware installation is complete. Proceed to Chapter 4: Configuration using the Console Interface, for
directions on how to set up the Switch.
Chapter 3: Connecting the Switch
Uplinking the Switch

Figure 3-3: Attaching Brackets to the Switch

IMPORTANT: Make sure to use the power cord that is
supplied with the Switch. Use of a different power
cord could damage the Switch.

Figure 3-4: Mounting the Switch

9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents