Chapter 2 Installing The Chassis; Site Planning - Cisco 8540 - Catalyst Campus Switch Router Modular Expansion Base Installation Manual

User guide
Hide thumbs Also See for 8540 - Catalyst Campus Switch Router Modular Expansion Base:
Table of Contents

Advertisement

Installing the Chassis
This chapter describes how to prepare your site for installation, and to install and
power up your chassis. This chapter contains the following sections:
Before you install, operate, or service the system, read the Site
Warning
Preparation and Safety Guide. This guide contains important
safety information you should know before working with the
system.

Site Planning

Planning the proper location and layout of your equipment rack or wiring closet
is essential for successful system operation. Equipment placed in an inadequately
ventilated area can cause system overtemperature conditions. In addition, poor
equipment placement can make chassis panels inaccessible and difficult
to maintain.
78-6134-03
Site Planning
Rack-Mounting the Chassis
Installing Power Supplies
Connecting Power to the Chassis
C H A P T E R
Catalyst 8540 Chassis Installation Guide
2
2-1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 8540 - Catalyst Campus Switch Router Modular Expansion Base and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

C8540-chas13

Table of Contents