Download Print this page

HMS Networks Intesis INSTCMBG 0000 Series Installation Sheet page 2

Intesis modbus/bacnet to cloud gateway

Advertisement

CONNECTIONS
Power
BACnet MS/TP
Supply
Modbus RTU
ELECTRICAL & MECHANICAL FEATURES
Plastic, type PC (UL 94 V-0)
Net dimensions (d
Enclosure
Recommended space for installation (d
Color: Light Grey. RAL 7035
Wall.
Mounting
DIN rail EN60715 TH35.
Per terminal: solid wires or stranded wires (twisted or with
ferrule)
Terminal Wiring
1 core: 0.5mm
(for power supply and
low-voltage signals)
2 cores: 0.5mm
3 cores: not permitted
1 x Plug-in screw terminal block (3 poles)
Power
Positive, Negative, Earth
9-36 VDC / 24 VAC / 50-60 Hz / 0.140 A / 1.7 W
1 x Ethernet 10/100 Mbps RJ45
Ethernet
2 x Ethernet LED: port link and activity
1 x Serial EIA485 (Plug-in screw terminal block 3 poles)
Port
A, B, SGND (Reference ground or shield)
1500VDC isolation from other ports
Operation
0°C to +60°C
Temperature
Operational
5 to 95%, no condensation
Humidity
IP20 (IEC60529)
Protection
70mm (h)
This marking on the product, accessories, packaging or literature (manual) indicates that the product contains electronic
parts and they must be properly disposed of by following the instructions at
Rev.1.0
© HMS Industrial Networks S.L.U - All rights reserved
This information is subject to change without notice
Power Supply
Must use NEC Class 2 or Limited Power Source (LPS) and SELV rated power supply.
Respect polarity applied of terminals (+) and (-). Be sure the voltage applied is within
the range admitted (check table below). The power supply can be connected to earth
but only through the negative terminal, never through the positive terminal.
Ethernet (ST Cloud, BACnet IP, Modbus TCP and console)
Connect the cable coming from the IP network to the connector ETH of the gateway.
Use an Ethernet CAT5 cable. If communicating through the LAN of the building,
contact the network administrator and make sure traffic on the port used is allowed
through all the LAN path (check the gateway user manual for more information). With
factory settings, after powering up the gateway, DHCP will be enabled for 30
seconds. After that time, if no IP is provided by a DHCP server, the default IP
192.168.100.246 will be set.
Port A (BACnet MS/TP or Modbus RTU)
Connect the EIA485 bus to connectors A3 (A), A2 (B) and A1 (SNGD) of gateway's
Port. Respect the polarity.
Note for Port A: Remember the characteristics of the standard EIA485 bus:
maximum distance of 1200 meters, maximum 32 devices connected to the bus, and
in each end of the bus it must be a termination resistor of 120 Ω.
ST Cloud
BACnet IP
Modbus TCP
w
h): 93x53x58 mm
x
x
w
h): 100x60x70mm
x
x
... 2.5mm
2
2
... 1.5mm
2
2
60 mm (w)
https://intesis.com/weee-regulation
LABEL INFORMATION
MAC: CC3Fxxxxxxxx
Activation code:
xxxxx-xxxxx-xxxxx-xxxxx-xxxxxx
Product activation website:
https://stcloud.intesis.com
MAC: Stands for the MAC address of the gateway
Activation Code: Required to activate the device in
the Cloud.
QR: Includes the Activation Code information in a QR
format for easiness of use.
100 mm (d)
URL
https://www.intesis.com
2 / 2

Advertisement

loading
Need help?

Need help?

Do you have a question about the Intesis INSTCMBG 0000 Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Intesis instcmbg0320000Intesis instcmbg0040000Intesis instcmbg0080000Intesis instcmbg0160000