• Trained or experienced electrical personnel are required to operate the equipment. • Operators should be familiar with national/regional laws, regulations and standards, the structure and working principle of relevant systems. Please read carefully the operating requirements and precautions in this document and “Important Notice” before operating. Failure to do so may •...
Page 3
S/N Equipment/component Model/version Function specification PV module B SigenStor EC SigenStor EC Inverter; it can be used in photovoltaic energy storage scenarios 5.0/6.0/8.0/10.0/12.0/15.0/17.0/20.0/25.0 TP and needs to be used together with PV modules and SigenStor BAT. SigenStor AC SigenStor AC Inverter;...
Page 4
S/N Equipment/component Model/version Function specification H Power sensor Sigen Sensor TP-DH(SDM630MODBUS V2) Data acquisition for grid connection points enables zero- Sigen Sensor TP-CT120-DH(SDM630MCT 40mA/120A) power grid connection. Sigen Sensor TP-CT300-DH(SDM630MCT 40mA/300A) Sigen Sensor TP-CT600-DH(SDM630MCT V2/600A) Power grid J App mySigen Android 6.0 or later iOS 12.0 onwards K Router...
2 Pre-installation Check • According to the packing list, check whether the components are complete and in good appearance. If any abnormality occurs, contact your sales agent in time. • Check personal protective equipment and installation tools to ensure that they are complete; If not, please make them up. •...
Page 7
Installer-provided cable Cable name Recommended specifications Protective ground cable of inverter housing Outdoor single-conductor copper cable Same as PE line for AC cable AC cable Outdoor five-conductor copper cable(L1、L2、L3、N、PE) • SigenStor EC/SigenStor AC/Sigen Hybrid (5.0–12.0) TP: Cross-sectional area of core conductor: 4–6 mm²; outer diameter: 13–19 mm •...
3 Equipment Installation Installation environment Mounting surface Do not install the equipment in smoky, flammable, explosive, or Do not install the equipment on a flammable carrier. • • corrosive environments. • The installation carrier must meet load-bearing requirements. Solid • Do not install the equipment outdoors in areas prone to salt damage brick-concrete structure, concrete walls, and ground are recommended.
4 Installation of inverter and battery pack (Optional) Base ground fixation: If you receive the base as shown in the picture and need to reinforce the equipment, you can perform this step. • At least two people are required to install the equipment. •...
Page 11
INV1 is the hole punching point for the Inverter wall fastener on Before installing the handle, please use a Torque socket wrench to the left side, and INV2 is the hole punching point for the Inverter measure the screws and confirm that the screws on Sigen BAT are wall fastener on the right side.
Page 12
Arrange SigenStor EC, SigenStor AC or Sigen Hybrid. For details about how to place the second SigenStor BATs, see Steps SigenStor EC or SigenStor AC (Optional) If three or more SigenStor BATs are to be installed, use For details, see Step a Lift.
Page 14
Base bracket has two versions in terms of appearance. The actual product shall prevail. The installation method for both versions remains the same. Appearance 1:...
Page 16
To install six SigenStor BATs, please install a external cooling fan on the inverter. The external cooling fan is included in the external cooling fan installation package.
Page 17
4.2 Wall Installation There are two installation methods for the tripod. Please refer to the actual product received for detailed instructions. Option 1: Option 2:...
Page 18
For details about how to place the SigenStor BAT, see Steps in Section 4.1 Floor installation. SigenStor BAT units L1 length L2 length For details about how to place the inverter, see Steps in Section 581 mm 574 mm 4.1 Floor installation. 851 mm 844 mm For the installation of the cascaded plate, please refer to Step...
Page 19
5 Cable Connection and Component Installation Scheme II Before connecting cables, ensure that DC SWITCH is in the OFF state, and the front switch of the AC line is off. • The cable colors in the figure are used only to distinguish different lines.
Page 20
5.2 Protective Ground Cable of Inverter 5.3 AC Output Cable of Inverter The protective ground wire should be grounded in close proximity. Unit: mm Unit: mm Hexagon socket M5...
Page 22
5.4 RS485 Signal Cable If a power sensor is used, one end of the RS485 signal cable is connected to the inverter while the other end to the power sensor. 5.4.1 Introduction to Correspondence COM terminal of the inverter The appearance and specific wiring of the power sensor can be found in the instruction manual delivered with the case.
Page 23
5.4.2 RS485 Signal Cable of inverter Shielding layer Unit: mm Click Click...
Page 24
5.5 DC input cable of inverter The DC cable is connected to the inverter from the PV string. Ignore this section in case of SigenStor AC inverters. Positive metal terminal 8-10 mm • If the voltage is negative, the polarity is incorrect. Rectify the fault Negative metal terminal in time.
Page 25
5.6 RJ45 Cable of inverter RJ45 cables are EIA/TIA 568B standard cables. ① White orange ② Orange ③ White green ④ Blue ⑤ White blue Green ⑥ ⑦ White brown ⑧ Brown Click Click...
Page 26
5.8 WLAN antenna stick Installation 5.7 Sigen CommMod Installation Sigen CommMod is required for 4G communication. WLAN communication requires the installation of WLAN antenna stick. S/N Indicator Description Power indicator Network • Slow flashing(200 ms on/1800 state ms off): The network is being indicator connected •...
6 Post-installation Check Check Item The equipment has been securely installed. Ground cables, DC cables, signal cables, etc. are installed accurately without leftovers. The cable fastening screws or terminals are properly installed. There are no sharp spikes or acute angles at the cut point of the cable tie.
Page 28
7 Installation of the Decorative Cover The end waterproofing plug for the strip light Click The end waterproofing plug for the strip light in step is at the lower end of the decoration on the left side of the inverter, please remove it for spare. •...
Page 29
8 Equipment Power-On 1. Turn on the front switch of the equipment. Indicator Color State Description 2. Rotate DC SWITCH to ON. (This step is not necessary for SigenStor AC) Always on All SigenStor BATs are connected 3. Observe the indicators on the front side of the inverter to learn about but not running.
Page 30
9 Download and create new system for mySigen APP Please enter the “Partner" → “Register Now" at the Company's official website (https://www.sigenergy.com), and complete the account registration based on facts. Download the mySigen App and create new system for the device.
Page 31
Daylight Saving Time Scan the SN code label on the accompanying box material. Locate the address manually If an upgrade is required, If the SN is lost, scan the SN and complete the Total Panel perform the upgrade on the side of the inverter or Capacity and Owner Details SigenStor BAT.
Page 32
You can manually set and modify some function parameters of the power station. Upon completion of the new system creation, the installer shall inform the owner to check its "sigencloud" e-mail within 24 hours and proceed with activating its account.
Need help?
Do you have a question about the SigenStor Home and is the answer not in the manual?
Questions and answers