Pacific energy C Series Installation And Operating Instructions Manual

Pacific energy C Series Installation And Operating Instructions Manual

Direct vent fireplace

Advertisement

Quick Links

IMPORTANT:
THESE INSTRUCTIONS ARE TO
REMAIN WITH THE
HOMEOWNER
FOR YOUR SAFETY
WARNING: If the information in this manual
is not followed exactly, a fi re or explosion
may result causing property damage,
personal injury or loss of life.
-- Do not store or use gasoline or other
fl ammable vapors and liquids in the vicinity
of this or any other appliance.
-- WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switch; do
not use any phone in your building.
• Immediately call your gas supplier
from a neighbour's phone. Follow
the gas supplier's instructions.
• If you cannot reach your gas supplier,
call the fi re department.
--Installation and service must be performed
by a qualifi ed installer, service agency or
the gas supplier.
This appliance may be installed in an af-
termarket permanently located, manufac-
tured (mobile) home, where not prohibited
by local codes.
This appliance is only for use with the
type of gas indicated on the rating plate.
This appliance is not convertible for use
with other gases, unless a certifi ed kit is
130206-40
Esteem
DIRECT VENT FIREPLACE
INSTALLATION
AND OPERATING
INSTRUCTIONS
ESTEEM_C
The
SERIES C
5056.411.C

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the C Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Pacific energy C Series

  • Page 1 IMPORTANT: THESE INSTRUCTIONS ARE TO REMAIN WITH THE HOMEOWNER FOR YOUR SAFETY WARNING: If the information in this manual is not followed exactly, a fi re or explosion may result causing property damage, personal injury or loss of life. -- Do not store or use gasoline or other fl...
  • Page 2: Table Of Contents

    Contents CAUTION ......................3 SAFETY ........................ 3 MAINTENANCE ....................3 TOP STANDOFFS ....................5 INSTALLATION REQUIREMENTS ............... 6 FRAMING ......................6 FRAMING FOR SCREEN FRONT ................ 7 TOP OR REAR VENT ................... 8 VENT ADAPTER INSTALLATION ................ 8 VENTING ....................... 9 VENT SYSTEM RESTRICTOR ADJUSTMENT ..........
  • Page 3: Caution

    CAUTION MAINTENANCE FOR YOUR SAFETY - Do not install or operate your Pacifi c Energy Caution: Turn off gas and electrical power supply and allow ample fi replace without fi rst reading and understanding this manual. Any time for unit to cool before servicing appliance. It is recommended installation or operational deviation from the following instructions that this appliance and venting should be inspected at least once a voids the Pacifi c Energy Warranty and may prove hazardous.
  • Page 4 MANTEL CLEARANCES MANTEL CLEARANCES Fig. # 3 Fig. # 3a WITH OPTIONAL BAY FRONT COMBUSTIBLE COMBUSTIBLE MANTEL MANTEL 1" [25mm.] 1" [25mm.] TOP OR REAR TOP OR VENTING REAR FINISHED WALL HEADER VENTING FINISHED WALL HEADER Ref. Mantel Width Ref. Clearance 4"...
  • Page 5: Top Standoffs

    MANTEL CLEARANCES Fig. # 3c WITH OPTIONAL SCREEN FRONT FINISHED WALL COMBUSTIBLE MANTEL TOP OR REAR VENTING 1" [25mm.] STANDOFF HEADER 8" HIGH CEMENT BOARD MANDATORY WITH SCREEN DOORS Ref. Mantel Width Ref. Clearance Clearance Top Edge of Screen Top Edge of Unit 4"...
  • Page 6: Installation Requirements

    INSTALLATION REQUIREMENTS FRAMING The Esteem Fireplace installation and venting must conform In planning the installation for the Esteem Fireplace, it is necessary to the current CAN/CGA-B149 installation code (in Canada) or the to determine where the unit is to be installed, location of vent system current National Fuel Gas Code, ANSI Z223.1 (in the USA), and and where gas supply piping may be plumbed.
  • Page 7: Framing For Screen Front

    FRAMING FOR SCREEN FRONT Fig. #6b CONCRETE BOARD DETAIL In planning the installation for the Esteem Fireplace, it is necessary to determine where the unit is to be installed, location of vent system and where gas supply piping may be plumbed. Various installations Extended are possible, such as, into an existing wall, a corner, a built-in wall or a Top Standoffs...
  • Page 8: Top Or Rear Vent

    Fig. # 7 Examples of Common Locations TOP OR REAR VENT to seal this joint may cause the fi replace to not operate properly. 1) Apply a bead of black sealant (supplied with the fi replace) to inside of the fl ared end of adapter. Caution: Vent outlet not used must be blocked with the vent cover 2) Place the gasket and vent adapter over the vent outlet and align plate and gasket.
  • Page 9: Venting

    Cover Plate CAUTION: UNDER NO CONDITION SHOULD COMBUSTIBLE MATERIAL BE CLOSER THAN 1 INCH FROM THE VERTICAL AND HORIZONTAL SECTIONS OF THE PACIFIC ENERGY FLEX VENT SYSTEM AND 1-3/4 INCHES FROM THE SIMPSON DURA-VENT GS and SECURITY SECURE VENT SYSTEM.
  • Page 10 Fig. # 11 Fig. # 12 24" 45˚ Top View Top View Corner Vent HORIZONTAL RUN Fig. # 13 MAX. WALL TERMINATION VENTING CHART NOTE: The vent must not exceed a total length of 20 feet. Any com- bination of rise and run may be used but must be constrained to the boundaries of this chart.
  • Page 11 Fig. # 14 ROOF TERMINATION MAX. VENTING CHART NOTE: The vent must not exceed a total length of 40 feet. Any com- bination of rise and run may be used but must be constrained to the boundaries of this chart. For each additional 90°...
  • Page 12: Vent System Restrictor Adjustment

    VENT SYSTEM RESTRICTOR ADJUSTMENT Fig. # 15c Located on the fi rebox rear wall are vent restrictors. The unit leaves the factory with the restrictors wide open as shown in Fig. 15b. These are built into the appliance for combustion air fl ow rate adjustment. WALL AND ROOF Adjustment of these restrictors ensures proper fl ame appearance for TERMINATION...
  • Page 13: Flex Vent Connection

    FLEX VENT CONNECTION F i g . # It is preferred to attach venting before framing begins. Once the fi replace is in position proceed to attach the venting (see Fig #16). The fl exible vent pipe may be stretched to accommodate various lengths of venting.
  • Page 14: Vent Extension

    VENT EXTENSION Fig. # 19 Vent Pipe Kits may be combined together for longer vent length. PIPE SUPPORT Extend the fl ex pipes as shown in fi gure #19. Use the 4 and 8 inch couplers supplied with the vent kit. Insert coupler into the appropriate fl ex pipe and secure in place with screws provided.
  • Page 15: Vent Terminal Installation

    VENT TERMINAL INSTALLATION Fig. # 21 Where a vent pipe passes through a combustible wall, a wall thimble must be used to retain insulation and maintain a 1 inch clearance. The wall thimble may be cut to length for various wall thicknesses (see Fig.
  • Page 16: Roof Vent Terminal Installation

    ROOF VENT TERMINAL INSTALLATION Fig. # 23 Firestops must be used where a vent passes through a fl oor. Where a vent passes through a ceiling, a wall/roof thimble must be used to retain 10 1/2" insulation and maintain a 1 inch clearance. Avoid cutting rafters. 1) Once the location of the terminal is determined, cut and frame a minimum 10-1/2"...
  • Page 17 Fig. # 24 Fig. # 26 6) Place the storm collar down over the pipe until it is level. Tighten roof vent terminal. Secure to the collar with screws provided. Seal the storm collar for a snug fi t. Apply a thick horizontal ring of mastic joint and screw heads using the high temperature sealant provided.
  • Page 18: Optional Venting

    Fig. # 27 Venting System Components Dura-Vent GS Secure Vent galv. black galv. black 6" Pipe Length ............908 ..908B ..... SV 4 L6 ....SV 4 LB6 9" Pipe Length ............907 ..907B 12" Pipe Length ............906 ..906B ..... SV 4 L12 .... SV 4 LB12 24"...
  • Page 19: Optional Snorkel Vent Terminal

    14" - # 982 SECURE VENT 36" - SV4STC36 14" - SV4STC36 PACIFIC ENERGY FLEX VENT * Minimum distance from the fi nished fl oor to the center of the opening varies with top or rear venting and vent system used.
  • Page 20: Manufactured (Mobile) Home

    MANUFACTURED (MOBILE) HOME Correct gas pressure requirement: In some jurisdictions, the Esteem Fireplace may be installed in Manufactured Homes after the "fi rst sale". Consult local codes for Natural Gas Propane approval. The fi replace must be fastened in place. Install in accordance with the current standard Mobile Homes, CAN/ Min.
  • Page 21: Burner Removal

    BURNER REMOVAL Fig. # 31 Caution: Turn off gas and electrical power supply and allow ample time for the unit to cool before proceeding. The glass frame must be removed, if installed, to remove the burner from the fi rebox. The glass frame is held in place by two over-center latches located under the fi rebox.
  • Page 22: Log Set Assembly

    LOG SET ASSEMBLY Step 1 Fig. # 33 Ember Floor Pt# 5097.26105 Unpack and inspect log set. There should be a total of 7 logs, one ember bed and two base brick panels. Gas and vent connections should be completed before installing the log set. Position the logs, ember bed and base bricks as indicated by pic- tures below.
  • Page 23 Step 5 Step 7 Middle Front Log Pt# 5097.23 Right Front Chunk Pt# 5097.2614 Step 8 Left Front Chunk Step 6 Pt# 5097.2613 Left Front Log Pt# 5097.25 Complete Log Set Placement 130206-40 ESTEEM_C...
  • Page 24: Optional Blower

    OPTIONAL BLOWER 115 VOLTS Fig. # 37 60 Hz Electrical Supply: 0.5 AMPERES It is recommended that the fi replace electrical receptacle box be prewired during installation The optional blower (kit # ENCD.BLOW) ROCKER SNAP DISC SWITCH SWITCH is equipped with a three prong power cord and may be installed and plugged in at a later date.
  • Page 25 SCREEN DOOR INSTALLATION screwdriver is required to install this kit. The Screen Door must be WARNING: Non-combustible facing material and extended top stand- installed before the top and bottom louvers. offs must be used if the Optional Screen Door is to be installed. Do not install the Optional Screen Door onto an Esteem Fireplace Slide the spring nuts (supplied) over the slotted holes in the outer that was framed in without the extended top standoffs and non-com-...
  • Page 26: Lighting Instructions

    LIGHTING INSTRUCTIONS FOR YOUR SAFETY READ BEFORE LIGHTING phone in your building. WARNING: If you do not follow these - Immediately call your gas supplier from a neigh- instructions exactly, a fi re or explosion bour's phone. Follow the gas supplier's instruc- may result causing property damage, tions.
  • Page 27: First Fire

    FIRST FIRE FLAME ADJUSTMENT When lit for the fi rst time, the appliance will emit a slight odour for The air shutter on the burner venturi tube controls the primary com- a couple of hours. This is due to the curing of paints, sealants and bustion air to the gas burner.
  • Page 28: Replacement Parts

    REPLACEMENT PARTS (WHEN ORDERING, INCLUDE PART NUMBER WITH DESCRIPTION) ITEM DESCRIPTION PART NO. ITEM DESCRIPTION PART NO. 1....REPLACEMENT GLASS ......GLAS.2075 11c ..FACING TRIM, RIGHT ......ENCD.27176 _ _ 2....WINDOW GASKET KIT ........2075.1 11d..BOTTOM TRIM BAR ......ENCD.27231 _ _ 3....WINDOW FRAME ........ENCD.2726 12....FRONT FRAME ...........ENCD.2714 4....FRONT TRIM, GOLD (2 pcs.
  • Page 29: Burner Replacement Parts

    BURNER REPLACEMENT PARTS (WHEN ORDERING, INCLUDE PART NUMBER WITH DESCRIPTION) ITEM DESCRIPTION PART NO. ITEM DESCRIPTION PART NO. 1....IGNITOR BRACKET ..........1984 10....FITTING, CONNECTOR, 3/8" ......5019.1 2....BURNER MOUNTING BRACKET ......2811.02 11....FITTING, CONNECTOR, 46-6C ......5020.5 3....GRATE REAR STANDOFF (2 req'd) ......2814 12....BURNER ORIFICE #45, NG ......5021.34 4....BRACKET, FAN CONTROL MOUNT .....2835 13....SCREW, 8X1/2 (16 req'd) ........5041.1 5....VALVE BRACKET ..........2845.001...
  • Page 30 APPENDIX A Louver Kit Installation Guide The ESTEEM METALLIC BLACK ENCD.LVMBK BRASS FINISH ENCD.LVBRA PORCELAIN BLACK ENCD.LVPBK Tools: PORCELAIN BLUE ENCD.LVPBE PORCELAIN GREEN ENCD.LVPGN (screwdrivers) PORCELAIN IVORY ENCD.LVPIY PORCELAIN RED ENCD.LVPRD #2 Robertson OR #2 Phillips PORCELAIN GRAPHITE ENCD.LVPGT This kit contains: 1..Top Louver 1..Bottom Louver 2..#8 x 1/2"...
  • Page 31: Optional Front Facing Trim

    Optional Front Facing Trim Installation Guide Esteem This kit contains: 1..Top Panel 1..Left Side Panel 1..Right Side Panel 6..#8 x 1/2" sheet metal screws (black in colour) 9..Fibre washers 1..Bottom Trim Bar Porcelain Enamel fi nish only 4..Spring nuts 130206-40 ESTEEM_C...
  • Page 32 Installation Spring nut Fig. # 1 Unpack and inspect all parts. A fl athead or a #2 Robertson screwdriver is required to install this kit. The facing trim kit must be installed before the top and bot- tom louvers. If the louvers are not installed, proceed to step 1) Fold down the bottom louver to access screws.
  • Page 33: Optional Blower Kit

    Optional Blower Kit ESTEEM ENCD.BLOW This kit contains: 1..Blower assembly 1 ..Speed Control box pre-wired with: -Power cord -Thermo-switch -Manual / Auto switch Blower Assembly Power Cord Speed Control Box 2..#8 x 1/2" Sheet metal screws (black in colour) Installation: Please see instruction manual.
  • Page 34: Wall Termination Kit

    Wall Termination Kit GASC.WALKIT This vent kit is for use with model The ESTATE and The ESTEEM fi replaces. Please refer to the Installation Instructions provided with the appliance for proper venting installation. This box contains: 1 ..Horizontal Vent Terminal 4 ..
  • Page 35: 5' Vent Pipe Kit

    5' Vent Pipe Kit ESTD.VP05 This vent kit is for use with model The ESTATE and The ESTEEM fi replaces only. Please refer to the Installation Instructions provided with the appliance for proper venting installation. This box contains: 5' ..4" Flex Vent 3 ..
  • Page 36: 10' Vent Pipe Kit

    10' Vent Pipe Kit ESTD.VP10 This vent kit is for use with the model ESTATE and ESTEEM fi replaces only. Please refer to the Installation Instructions provided with the appliance for proper venting installation. This box contains: 10' .... 4" Flex Vent 1 ....
  • Page 37: Roof Termination Kit

    Roof Termination Kit ESTD.ROTKIT This vent kit is for use with model The ESTATE and The ESTEEM fi replaces. Please refer to the Installation Instructions provided with the appliance for proper venting installation. This box contains: 1 ..Roof Vent Terminal 3 ..
  • Page 38 - notes - ESTEEM_C 130206-40...
  • Page 39: Safety Label

    Safety Label Pacifi c Energy Fireplace Products Ltd. Duncan, British Columbia, Canada Certifi ed for / Certifi é pour Canada and U.S.A. MADE IN CANADA FABRIQUE AU CANADA This Appliance is Equipped For Use With / MODEL/ SERIES/ Cet Appareil est Équipé Pour Utilise Avec : THE ESTEEM MODELE: SERIE:...
  • Page 40 Pacifi c Energy Fireplace Products Ltd. www.pacifi cenergy.net 2975 Allenby Rd., Duncan, B.C. V9L 6V8 Phone: 250-748-1184 Printed in Canada...

This manual is also suitable for:

Esteem

Table of Contents