Omron VARISPEED F7 Quick Manual page 8

200v class 3-phase 0.4 to 110 kw 400v class 3-phase 0.4 to 300 kw
Hide thumbs Also See for VARISPEED F7:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation Orientation
Install the Inverter vertically so as not to reduce the cooling effect. When installing the Inverter,
always provide the following installation space to allow normal heat dissipation.
A
30mm min.
30mm min.
50mm
min.
Horizontal Space
1. The same space is required horizontally and vertically for IP00, IP20 and NEMA 1 Inverters.
2. Always remove the top protection cover after installing an Inverter with an output of 18.5 kW or less in a
panel.
Always provide enough space for suspension eye bolts and the main circuit lines when installing an
IMPORTANT
Inverter with an output of 22 kW or more in a panel.
IMPORTANT
Installation of Inverters and EMC filters
For an EMC rules compliant installation
consider the following points:
Use a line filter.
Use shielded motor cables.
Mount the inverter and filter on a
grounded cunductive plate.
Remove any paint or dirt before mount-
ing the parts in order to reach the low-
est possible grounding impedance.
Fig 3 EMC filter installation
B
Air
200V class inverter, 0.55 to 90 kW
400V class inverter, 0.55 to 132 kW
200V class inverter, 110 kW
400V class inverter, 160 to 220 kW
400V class inverter, 300 kW
120mm min.
Air
Vertical Space
Fig 2 Installation space
PE
Grounded
Metal Plate
50 mm
120 mm 120 mm
300 mm 300 mm
PE
L2
L1
L3
Ground Bonds
Remove any paint!
Line
Inverter
Filter
Load
L2
V
GND L1
L3
U
W
Cable Lenght
as short as possible
Ground Bonds
Remove any paint!
M
~3
A
B
120 mm
GND
Screened
Motor cable
EN-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Varispeed f7 cimr-f7z

Table of Contents