Operation - Parkside PNKP 105 A1 Instructions Manual

Hot glue gun
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 40

Operation

Prepare the area to be glued:
Do not use any flammable solvents to clean the area.
The room temperature and the temperature of the material to be
glued may not be colder than +5 °C and no warmer than + 50 °C.
The area must be clean, dry and grease free.
GB
Smooth out the surface before gluing.
MT
Warm up cooled material such as steel for a better join.
1. Fold the stand leg
2. Put a glue cartridge in the feed canal
3. Let the device warm up for 5 minutes. The device is now ready
to use.
Gluing:
Press the feed trigger
1. Apply the glue in dots. Apply the glue in a zigzag line on flexible
material e.g. textiles.
2. Press both glued together work-pieces together immediately
after applying the glue for approx. 30 seconds. The glued area
is resilient after approx. 5 minutes.
3. Place the glue gun on its stand leg
Switching the device off:
Pull the mains plug from the socket.
42
out. Set the device aside.
to start and control the flow of glue.
between gluing.
.
PNKP 105 A1

Advertisement

Table of Contents
loading

This manual is also suitable for:

270716

Table of Contents