Anti-Tip Bracket Installation
Slide-In Range
D1
Locating The Bracket
a. Decide whether the bracket will be
installed on the right or left side of range
opening.
b. Place the bracket as shown in Fig. 1.
E q
u a
E a
l S
c h
p a
S i d
e
ADJACENT CABINET
FLOOR-WOOD
BRACKET
SIDE
REAR
LEVELING
LEG
FLOOR-CONCRETE
Fig. 1
c e
L a
r g e
r T
h a
n 3
3 0 "
0 "
O p
e n
WALL
i n g
Installing The Bracket in Wood
D2
or Concrete
INSTALLATION -WOOD CONSTRUCTION
a. Locate the centers of the four holes identified
in Fig. 1 as Floor-Wood and Wall.
b. Drill a 1/8" pilot hole through the pre-marked
areas. Note the angle of the wall screw in
Fig. 2.
c. Mount the Anti-Tip bracket with the four
screws provided.
ATTACHMENT TO WALL
TO FRONT EDGE
25"
OF
COUNTERTOP
SCREW MUST
ENTER WOOD
OR METAL
INSTALLATION -CONCRETE CONSTRUCTION
a. For concrete installation you will need two
1/4"x 1-1/2" lag screws, and two sleeve
anchors.
b. Locate the center of the four holes identified
in Fig. 1 as Floor-Concrete and Wall. Drill
the recommended size holes in each.
c. Install the sleeve anchors into the predrilled
concrete holes and install the lag and wall
screws through the Anti-Tip bracket. Make
sure the screws are securely tightened.
16
BRACKET
WALL
PLATE
Fig. 2
GEA01052
Need help?
Do you have a question about the Performance JS966 and is the answer not in the manual?
Questions and answers