GE JSP46 Installation Instructions Manual
GE JSP46 Installation Instructions Manual

GE JSP46 Installation Instructions Manual

Self cleaning radiant electric slide-in range
Hide thumbs Also See for JSP46:

Advertisement

Installation
Instructions
"If you have questions, Call 800-GE-CARES
www.GEAppliances.com"
Skill Level: High
Completion Time: 1 to 3 Hours
Proper installation is the responsibility of the installer. Product failure due to improper installation
is not covered under the GE Appliance Warranty. See the Owners Manual for warranty
information.
CAUTION: Before you begin
Read these instructions carefully and
completely.
• IMPORTANT- Save these instructions for
local inspector's use.
• IMPORTANT- Observe all governing codes
and ordinances.
Parts Included
2 Screws
Rear Filler
Anti-Tip Bracket

Tools You Will Need

Wrench or Pliers
1/4"Nut
(for 1 7/16" nut)
driver
Level
Pub. No. 31-10426
4053P412
229C
Average
Low
Screws
Drill with
1/8" Bit
Self Cleaning Radiant
Electric Slide-In Range
• NOTE TO INSTALLER- Be sure to leave
these instructions with the consumer.
• OWNER- Keep these instructions for future
reference.
• WARNING- This appliance must be
properly grounded. See "Electrical
Requirements" page 2.
Materials Needed
Anchor
Lag Bolts
Sleeves
(For Concrete Floors
Only)
y
Pencil
y y
Tape Measure
1
JSP46, JSP56, JS966
or visit our website at:
( UL Approved 50 AMP)
4- Wire Cord
4'long
Straight Edge
or Square
Safety
Glasses
3 -Wire Cord
OR
4'long
Hand or
Saber Saw
Pliers

Advertisement

Table of Contents
loading

Summary of Contents for GE JSP46

  • Page 1: Tools You Will Need

    Average Completion Time: 1 to 3 Hours Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the GE Appliance Warranty. See the Owners Manual for warranty information. CAUTION: Before you begin •...
  • Page 2: Important Safety Instructions

    Installation Instructions IMPORTANT SAFETY INSTRUCTIONS For Your Safety Electrical Requirements This appliance must be supplied with the proper WARNING: For personal safety voltage and frequency, and connected to an remove house fuse or open circuit individual properly grounded branch circuit, breaker before beginning protected by a circuit breaker or fuse having installation.
  • Page 3: Pre-Installation Checklist

    Forcing the cook top to fit may cause excessive gaps and could break glass and void warranty. To Procure Kits: a. Visit GE Web Site, see page 1. b. Call GE Answer Center, see page 1. c. Contact Dealer...
  • Page 4 Installation Instructions Pre- Installation Checklist Storage Drawer Removal Open oven door and remove literature pack, broiler pan and grid, and oven racks. Pull the drawer out until it stops. Oven Racks Lift the front of the drawer until the EASY INSTALLATION OF YOUR NEW 30"...
  • Page 5 Installation Instructions Pre- Installation Cutout and Required Clearances 3 1 - 1 / 4 " If cabinets are placed less than 30” above the range, see alternate construction page 12. " 2 - 7 / 8 r o n t T o F a c e S u r f...
  • Page 6: Standard Installation

    Installation Instructions Standard Installation Standard Installation Wall 1/4" Min. Flat 25"Typically 23-3/16" 9/16" Min. 9/16" Min. Flat Flat 29 -15/16 to 30 -1/16" Smooth Cut FLAT AREA 36" 1/4" If the construction of your cabinet cannot Be careful not to damage the adjacent provide a 1/4”...
  • Page 7: C Electrical Connections

    Installation Instructions Electrical Connections Remove wire cover at NEW CONSTRUCTION AND FOUR lower rear of range. CONDUCTOR BRANCH CIRCUIT 50 Amp 4 Wire C4a Follow instructions WIRE COVER below if your cord is 4 wire. When using a power cord, remove the knockout in the connection plate with pliers as required by the size of the strain relief or clamp supplied with cord.
  • Page 8: Installing The Anti-Tip Bracket

    Installation Instructions Installing the Anti-Tip Bracket Installing The Bracket in Wood Locating The Bracket or Concrete a. Decide whether the bracket will be INSTALLATION–WOOD CONSTRUCTION installed on the right or left side of range a. Locate the centers of the four holes identified opening.
  • Page 9: Installation Instructions

    Installation Instructions Installing the Range SLIDE RANGE INTO OPENING Carefully push the range into the Position the range in front of the opening until the counter top fully cabinet opening. engages the control panel. The back glass overhang should cover the cutout opening.
  • Page 10 Installation Instructions Installing the Range (Cont.) Replacing the Storage Drawer Final Check of the Anti-Tip Bracket Place the When installation is drawer rail on complete and the the guides. range is in place, inspect to be sure Push the the rear leveling leg drawer in until Stop is fully inserted into...
  • Page 11: Final Check List

    Installation Instructions Final Check List Check to make sure the circuit breaker is closed (Reset) or the circuit fuses are replaced. Be sure power is in service to the building. Check to be sure that all packing materials and tape on metal panel (if applicable) under control knobs and drawer have been removed.
  • Page 12 Alternate Construction Installation Instruction Preparation Optional Maintop Filler or Countertops higher than 36 1/2” Backguard Kit Flat & Level If countertop height If counter opening extends to the wall, it will require With Back & Opposite Side is between 36 1/2” Maintop Filler Kit (supplied with the range) or 3 0 "...

This manual is also suitable for:

Jsp56Js966

Table of Contents