Cisco CQ211L01-48H8FH Hardware Installation Manual page 22

Table of Contents

Advertisement

Installing the Chassis
N-m) torque value to attach the grounding plate to the chassis.
The Cisco
Note
attaching the grounding plate to the chassis.
Position a rack-mount bracket on the side of the chassis with its four holes that are aligned to four of the screw holes
on the side of the chassis, and then use four M4 flat-head screws with 13.25 in-lbs (1.5 N-m) torque value to attach
the bracket to the chassis.
Note
You can align four holes in the rack-mount bracket to four screw holes on the front side of chassis or
four screw holes on the rear side of the chassis. The holes that you use depend on which end of your
chassis is located in the cold aisle.
Figure 5: Rack-Mount Brackets on Cisco CQ211L01-48H8FH—Port-Side Intake
1
Rack-mount brackets
2
M4 x 6mm Phillips flat-head screws
3
Rack-mount guide
Hardware Installation Guide for Cisco CQ211L01 Switch
16
Attach the grounding plate to the chassis. Use two M4 flat-head screws with 13.25 in-lbs (1.5
chassis has a grounding cover label that must be removed before
4
5
Rack-Mount the Chassis in a 4-Post Rack
Rack-mount guide rails
Grounding plate

Advertisement

Table of Contents
loading

Table of Contents