Installing Nest Card Termination Units - Paradyne HOTWIRE 7924 User Manual

T1 and e1 hdsl nest card termination units
Hide thumbs Also See for HOTWIRE 7924:
Table of Contents

Advertisement

Installing HotWire Nest Card Termination Units

Installing Nest Card Termination Units

2-2
It is assumed that you have already installed the HotWire Model 7900 Nest and
associated power supply in a standard equipment rack, and that all network
connections have been made. Installation of the optional HotWire 7900 Basic
Maintenance Processor (HTU-M or HTU-S) is described in a separate user's
guide. Refer to
Product-Related Documents
Procedure
To install the nest card:
1. Use electrostatic discharge (ESD) protection when handling the electronic
components. Remove the card from any protective packaging.
2. Align the circuit board with the top and bottom card guides of the next
available card slot:
— Slot 1 if no maintenance processor option is installed
— Slot 2 if an HTU-S is installed in Slot 1
— Slot 3 if an HTU-M is installed in Slots 1 and 2
3. Slide the nest card into the slot until the backplane connector plug is seated
firmly into the backplane.
4. Tighten retaining screws at the top and bottom of the nest card front panel.
Maintenance Processor Option
(HTU-M) Slots 1 & 2
OK
FAIL
SELECT
NETWORK
NETWORK
NETWORK
NEXT
LOS/AIS/BER
LOS/AIS/BER
LOS/AIS/BER
LOCAL
LOCAL
LOCAL
REMOTE
REMOTE
REMOTE
REMOTE
REMOTE
REMOTE
LOOP BK
LOOP BK
LOOP BK
ALARMS
MAJOR
SYSTEM
SYSTEM
SYSTEM
MINOR
PWR
PWR
PWR
ABNORM
FAIL
FAIL
FAIL
ACO
ACTIVE
HDSL
HDSL
HDSL
LOS / BER
LOS / BER
LOS / BER
LOOP 1
LOOP 1
LOOP 1
LOOP 2
LOOP 2
LOOP 2
August 1997
in About This Guide .
NETWORK
LOS/AIS/BER
LOCAL
REMOTE
REMOTE
LOOP BK
SYSTEM
PWR
NETWORK
LOS/AIS/BER
FAIL
LOCAL
REMOTE
REMOTE
LOOP BK
SYSTEM
HDSL
LOS / BER
PWR
FAIL
LOOP 1
LOOP 2
HDSL
LOS / BER
LOOP 1
LOOP 2
7920-A2-GB20-10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hotwire 7925

Table of Contents