Download Print this page

Qlima SM 22 DUO Operating Manual page 152

Advertisement

Available languages

Available languages

OUTDOOR UNIT INSTALLATION
Step5:
Connecting Refrigerant Pipe
5.1 Unscrews the valve cover, grasp and press it down gently to take it down(if the valve cover is
applicable).
5.2 Remove the protective caps from the end of valves.
5.3
Take off the plastic cover in the pipe ports and c
the connecting pipe and make ensure the port is clean.
5.4 After align the center, rotate the flare nut of the connecting pipe to tighten the nut as tightly as
possible by hand.
5.5 Use a spanner hold the body of the valve and use a torque wrench to tighten the flare nut
according to the torque values in the torque requirements table.
(Refer to the torque requirements table on section INSTALLATION PRECAUTIONS)
connection pipes
4
152
Take down the valve cover
flare nuts
heck whether there is any sundry on the port of
28

Advertisement

loading

This manual is also suitable for:

Sm 22 multiS 2226S 2234