Installing The Rails - Proactive PMBAB42 User Manual

Thermostatic water bath 42” width
Table of Contents

Advertisement

Installing the Rails

1.
Before installing the rails, the bed should be in a flat position.
2.
Remove the rubber cover for the appropriate holes.
3.
Loosen the turn knob on the rail and take out the washer.
4.
The rails are side specific. Place right and left rails on respective
sides according to the labeling.
5.
Take the rail and insert the studs into precast holes.
15

Advertisement

Table of Contents
loading

Table of Contents