Connecting Your Subscriber Lines - Zhone 12000E Installation Instructions Manual

Ip broadband loop carrier
Table of Contents

Advertisement

Connecting Your Subscriber Lines

IPD1-A2-ZZ40-20
No configuration is necessary for the interface module(s) installed in your
12000E to operate at default settings. However, if you wish to run your
subscriber connections at settings other than the defaults, configure the
interface module(s) prior to connection. Refer to the installation instructions
for your particular interface module(s).
The 12000E chassis supports ADSL, IDSL, SDSL and T1/E1 technologies.
Ensure that the subscriber lines you are connecting correspond with the
technology of the interface module(s) installed in your 12000E.
1 Identify the Appropriate RJ21 Connector(s). Subscriber lines must be
connected according to the 12000E slot in which the corresponding
interface module was installed. Interface module slots 1–12 run from left
to right when you are facing the front of the chassis; the corresponding
RJ21 ports are directly behind each slot on the back of the chassis (1–12,
right to left, when you are facing the back of the chassis). Each interface
module slot on the 12000E has two corresponding RJ21 connectors
located on the back of the chassis. The bottom row of RJ21 connectors
(A) provides the connection for interface module ports 1–24 (on most
models) and the top row of RJ21 connectors (B) provides the interface
module connection for ports 25–48 (on applicable models). For the
TIM1500-24 interface module, the A connector provides connection for
ports 1–12 and the B connector provides the connection for ports 13–24.
12000E IP Broadband Loop Carrier Installation Instructions
Connecting Your Subscriber Lines
15

Advertisement

Table of Contents
loading

Table of Contents