EN   Dometic FreshJet 7 Series Lite 48 V
A
B
2.
8. Fit the reinforcing rails (B).
Installing in an existing opening
9.
Remove all screws and fixtures of the existing roof hatch or air conditioner.
10. Take out the roof hatch or roof air conditioner.
11. Remove the sealant around the opening using a scraper or similar tool.
Laying the connecting cables
12. Check that the voltage specification on the roof air conditioner data plate is the same as that of the power sup-
ply. The roof air conditioner must be connected to an electric circuit which is able to supply the required current
(Technical data
13. Ensure that the power supply has a residual current circuit breaker. If missing, install the residual current circuit
breaker.
14. Install an all-pole switch.
15. Ensure the correct cable thickness to carry the maximum electrical current as specified in product data plate.
16. Make an opening on one side in order to feed through the power supply cable.
12
1.
2.
1.
on page 18).