Electrical Tests - Siemens 6SL3120-2TE21-0AA3 Manual

Booksize power units
Table of Contents

Advertisement

Line connection and line-side power components
3.9 Active Interface Modules internal air cooling
Remove the connection bracket to the
noise suppression capacitor using a
Tx25 screwdriver
Note
Installing the connection bracket for the interference-suppression capacitor
For operation in other line supplies, the connection bracket must be reinstalled and fixed with
a tightening torque of 1.8 Nm.
3.9.8

Electrical tests

Tests on the 16 kW Active Interface Module
Electrical tests on the 16 kW Active Interface Module may only be performed via the
associated terminal connectors. The socket contacts will expand if unsuitable testing
equipment is used (e.g. 4 mm safety plugs inserted directly into device sockets).
Using such equipment will result in contact problems involving the Active Interface Module's
power connections.
Table 3- 26
Electrical test on the 16 kW Active Interface Module
Active Interface Module 16 kW
134
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Withdraw the connection bracket.
RIGHT: Measurement with original
terminal connectors
Connection bracket for the
interference-suppression capacitor
WRONG: Measurement via the device
sockets
Booksize Power Units
Manual, (GH2), 04/2014, 6SL3097-4AC00-0BP6