Hauff-Technik MIS100D 1x58-64 Gas Installation Instructions Manual page 10

Table of Contents

Advertisement

Available languages

Available languages

Einzelhauseinführung
MIS100D 1x58-64 Gas
The following instructions are to be observed prior to installa-
tion of the single building entry MIS100D 1x58-64 Gas:
WARNING!
Risk of injury in the event of improper installation!
Improper installation can result in significant bodily harm and property da-
mage.
• Observe the nationally applicable laying and filling regulations for pipes and
cables.
• Seal the underground and cable substructure well prior to laying pipes or cables
so that the latter cannot subside.
NOTICE!
Risk of injury in the event of improper installation!
Improper installation can result in significant bodily harm and property da-
mage.
• Diamond core bits for dry cutting are available (e.g. Hilti) for basements with
masonry walls. Handheld drills can be used.
• Before installing the MIS100D 1x58-64 Gas existing breaks (90 mm) in the wall
surface or paint must be properly restored according to DIN 18533 until an o-
pening diameter of 62 - 65 mm is achieved. In the case of small breaks (max.
90 mm), no follow-up is required since the sealing will be covered by the ex-
pansion resin.
• If there are breaks in the masonry or wall, we recommend using a second resin
cartridge (which is not included in the package but can be ordered separately)
to help secure the wall entry.
• The max. volume of the resin is reached after approx. 5 minutes. After this, the
entire resin system can be removed from the MIS. The complete curing period
is approx. 30 minutes.
• All surfaces must be clean, firm and free of dust and grease.
• Do not use cleaning agents containing solvents to clean the single building
entry. We recommend using the cable cleaner KRMTX.
• For details of other accessories and further information, see www.hauff-tech-
nik.de and the technical data sheets as well as the safety data sheet.
Personnel requirements
Qualifications
WARNING!
Risk of injury in case of inadequate qualification!
Improper handling can result in significant bodily harm and property da-
mage.
• Installation may only be carried out by qualified and trained individuals who
have read and understood these instructions.
Skilled experts
Based on their specialist training, skills, experience and familiarity with the rele-
vant provisions, standards and regulations, skilled experts are able to carry out the
work assigned, independently identifying and avoiding potential hazards.
Transport, packaging, scope of delivery and storage
Safety instructions in connection with transport
NOTICE!
Damage in the event of improper transport!
Significant damage can occur in the event of improper transport.
• When unloading packaging items on delivery and in the course of in-house
transport, proceed with care and observe the symbols on the packaging.
Transport inspection
Inspect the delivery immediately on receipt for completeness and transport da-
mage. In the event of transport damage being visible from the outside, proceed as
follows:
• Do not accept the delivery or only do so subject to reservations.
• Make a note of the extent of damage in the transport documentation or de-
livery note provided by the transporter.
• Submit a claim for every defect as soon as it has been identified.
• Claims for damages can only be asserted within the applicable claim
period.
Scope of delivery
The scope of supply of Single building entry MIS 100/58-64 Gas comprises:
• 1 flange component
• 1 resin filler tube, 475 mm
• 1 membrane tube, 150 mm
Necessary accessories:
10
• 1 quick tensioning device MIS100D 1x58-75 SVS, reusable (Art. No.:
2900300695) (alternatively: tensioning nut for gas fittings from Schuck)
• 1 WAR90/100 1x63 (ordered separately)
• 1 threaded plate (alternative to WAR90, available from Schuck)
Consumables:
• 1 resin cartridge (2-component resin"Tangit"), 300 ml
or
• 2 resin cartridges (2-component resin"Resinator"), 150 ml
Storage
NOTICE!
Damage due to improper storage!
Significant damage can occur in the event of improper storage.
• The single building entry is to be protected from damage, damp and soiling
prior to installation. Only intact components may be installed.
• The single building entry must be stored in such a way that it is not exposed to
low temperatures (< 5 °C), high temperatures (> 30 °C) or direct sunlight.
Disposal
If no return or disposal agreement has been concluded, recycle dismantled com-
ponents after they have been properly dismantled:
• Metal remains are to be scrapped according to existing environmental regulati-
ons.
• Dispose of elastomers according to existing environmental regulations.
• Dispose of plastics according to existing environmental regulations.
• Dispose of packaging material according to the applicable environmental regu-
lations.
• Dispose of hardened expansion resin residues according to existing environ-
mental regulations (household waste/commercial waste).
• Dispose of fully emptied expansion resin packaging according to existing en-
vironmental regulations (yellow (recycling) bin/sack).
Art. Nr.: 5090032028 Rev.: 02/2022-03-28

Advertisement

Chapters

Table of Contents
loading

Table of Contents