Commissioning; Inspection; Commissioning Procedure - PrimeVOLT PV 3K6HB-60 User Manual

Single phase ess inverter
Table of Contents

Advertisement

Single-phase ESS Inverter User Manual
6

Commissioning

It is necessary to make a complete commissioning of the inverter system. This will essentially
protect the system from fire, electric shock or other damages or injuries.
6.1

Inspection

Before commissioning, the operator or installer (qualified personnel) must inspect the system
carefully and make sure:
1) The system is firmly and correctly installed by following the contents and notifications of
this manual, and there are enough spaces for operation, maintenance and ventilation.
2) All the terminals and cables are in good status without any damages.
3) No items are left on the inverter or within the required clearance section.
4) The PV, battery pack is working normally, and grid is normal.
6.2

Commissioning Procedure

After inspection and making sure status is right, then start the commissioning of the system.
1) Power on the system by referring to the Startup section 5.2.1.
2) Setting the parameters on the App according to user's requirement.
3) Finish commissioning.
Commissioning
46