Safety; Sanitary - Teba therm TP-16 Installation And User Manual

Pellet central heating stove - boiler
Table of Contents

Advertisement

4.2 SAFETY

* Product must be installed by an authorized person.
* Before installing the product, it should be determined whether the bearing capacity of
the floor to be installed is durable to the product. In case of insufficient bearing
capacity, appropriate measures should be taken. If the floor where the stove is to be
installed is flammable or heat-sensitive, you should place a base (eg marble or glass
base).
* Care must be taken to ensure that the ventilation conditions of the place where the
product is installed and frost protection measures are taken (such as antifreeze). The
problems can be occured in case antifreeze is not used, are not covered by the
warranty.
* The pellet stove can operate in conjunction with the existing multiple chimneys. In
addition, the stove should not be connected at places such as the aspirator chimney and
ventilator.
* Chimney must be cleaned at least twice a year.
* Product needs to be connected to the chimney with a shortest distance.
* Always check the water level in the stoves and radiators with the manometer before
the first installation (1 - 1.5 bar range). If there is, take the air from the radiators.
* The central heating boilers and stoves cannot be used without water. Our company is
not responsible for damages caused by running without water.
* In order to get better heat efficiency and extend the life of the product, qualitative
pellet and wood fuel should be preferred. Do not use moist or wetted pellet, sawdust,
coal etc.
* Care must be take to ensure maintenance and cleaning of the radiators are made.
* Since the central heating pellet stoves are designed according to the interior spaces
and give heat to the environment, they should not be installed in places such as
bathrooms, shelter, cellar. And they should not be used for cooking.

4.3 SANITARY

It is recommended that the radiator installation connection needs to be carried out by
an authorized person for regular and comfortable operation. Our company is not
responsible for any damage related to the installation.
After the safety precautions and precautions described above, the pellet stove or boiler
can be installed up to last a few radiators without using too many elbows with the
installaton line pipes 1 "- 3/4" METAL or PVC pipes. In this way, the hot water will
circulate more easily and the temperature in the radiators is felt in a short time. 1/2 "
METAL or PVC pipes can be used. The installation of the main pipes to the pellet stove
should be securely connected to the radiators by using the fittings(Gland, nipple, valve).
After the connection is done the system will be filled with water by the authorized
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tp-12Tp-24Tp-28Tp-30Tp-25Tp-35

Table of Contents