Download Print this page
Mercia Garden Products 02DORM0707-V4-PEFC General Instructions Manual

Mercia Garden Products 02DORM0707-V4-PEFC General Instructions Manual

Dorma playhouse

Advertisement

Quick Links

General Instructions
02DORM0707-V4-PEFC
Dorma Playhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
WARNING: Only for domestic use
Not suitable for children under 36 month
To be used under direct supervision of an adult
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 02DORM0707-V4-PEFC and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 02DORM0707-V4-PEFC

  • Page 1 For assistance please contact customer care on: 01636 880514 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in...
  • Page 2 02DORM0707-V4 Please retain product label and instructions for future reference Overall Dimensions: Width = 2183mm Depth = 2236mm Height = 2377mm Base Dimensions: Width = 2077mm Depth = 2067mm Before assembly please make sure you have a suitable base ready to erect your building Dorma Window Dorma Left...
  • Page 3 Please retain product label and instructions for future reference Pre Assembly Long Fascia - 1365mm QTY 4 FAS1385X95mm ANGLED Before assembling remove the transportation blocks from the bottom of each panel. Short Fascia - 430mm QTY 2 FAS450X95mm ANGLED Right Hand Rail - 27x44x1704mm F2744-1744mm ANGLED Left Hand Rail - 27x44x1890mm F2744-1930mm ANGLED...
  • Page 4 Please retain product label and instructions for future reference Step 2 Step 4 Fix the Door (No. 20) to the Door Attach the Rear Panel (No. 6) the Right Panel (No. 3) with the supplied Window Panel (No. 5) at the corners Hinges (No.
  • Page 5 Please retain product label and instructions for future reference Step 6 Step 8 Fix the Veranda Front Panel (No. 7) to the Place the Door Gable Top (No. 8) onto the Veranda Front Panel (No. 7), ensuring the Window Panels using 6x30mm screws. cladding and framing on either side is ush 6x50mm Screws (see diagram).
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 10 Step 12 Secure the building onto the oor using Fix the Rail Block (No. 49) in line with the 24x50mm screws. Make sure to align screws Bunk Floor using 2x50mm screws.
  • Page 7 Please retain product label and instructions for future reference Step 14 Step 16 To assemble the Ladder, slot each Ladder The next step is to t the Ladder Hand Rails. Step (No. 44) into the grooves of the First attach the Right Hand Rail (No. 39) to Ladder Sides (No.
  • Page 8 Please retain product label and instructions for future reference Step 17 Step 19 Fix the framing together with 3x50mm Place the Ridge Bar (No. 36) inbetween the Dormer Window (No. 15) and the Roof. screw as shown in diagram. Ensure the at edge is against the Dormer 9x50mm Screws Window panel and the angled edge is resting on the Roof.
  • Page 9 Please retain product label and instructions for future reference Step 21 Step 23 Approximate Felt Measurements Fix the Eaves Frames (No. 32) to the Side Panels, Cut the Felt into 6 sheets (see illustration 400mm ensure the frames are butt up against the for dimensions) and lay onto the roof as Roof Sheets.
  • Page 10 Please retain product label and instructions for future reference Step 24 Step 26 Attach the Long (No. 33) and Short Fix the Felt Trims (No. 34) to either side of the Cover Trims (No. 35) to the building as shown pretruding window using 3x 30mm screws in the diagram.
  • Page 11 Please retain product label and instructions for future reference Step 28 Remove lm from both sides of the door styrene before tting the window bars. Place one piece of beading (No. 50) in the top groove and push into the top left corner.