Download Print this page

Advertisement

Quick Links

!
x2
2mm Drill bit
12mm CSK

Advertisement

loading
Need help?

Need help?

Do you have a question about the 02DTSHAX0505HGD1W-V1-PEFC and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 02DTSHAX0505HGD1W-V1-PEFC

  • Page 1 2mm Drill bit 12mm CSK...
  • Page 2 50kg...
  • Page 3 Take a look at the di erent playhouse options below which refers to the instruction lea ets required to build each option. Model Build Instructions Required 5x5 Playhouse With Half Glazed Door 02DTSHAX0505HGD1W-V1-PEFC (Playhouse) SI-002-001-0022 5x5 Playhouse With Half Glazed Door & 02DTSHAX0505HGD1W-V1-PEFC (Playhouse)
  • Page 4 Before assembly Floor Joist - 28x28x1500mm - QTY 5 please make sure you have a FS2828-1500MM suitable base ready to erect your building Veranda Boards - 12x95x1470mm - QTY 3 SR1295-1470MM Ridge Bar - 28x28x1177mm - QTY 1 FS2828-1177MM MADE IN GREAT BRITAIN Overall Dimensions: Base Dimensions: Cover Trims - 12x45x1155mm - QTY 2...
  • Page 5: Pre-Assembly

    Step 1 Nail Bag Parts needed - & & Pre drill There may be extra screws present in the nail bag hole To x the Window (No. 19) into the Door Gable (No. 1). 50mm Screw x 32 30mm Screw x 80 Position the Window (No.
  • Page 6 Step 5 Step 3 Parts needed - & Parts needed - & Pre drill Pre drill hole hole Place the Ridge Bar (No. 11) in Position the Plain Gable (No. 4) and between the Door Gable (No. 1) Plain Side Left (No. 2) so there is equal and Plain Gable (No.
  • Page 7 Step 7 Step 9 Parts needed - Parts Needed - Pre drill Pre drill hole hole Fit the Fascia Block (No. 15) to Cut the Felt (No. 21) into 3 sheets the front of the building using measuring: 1620mm (L) X 1000mm (W) 4x30mm screws, make sure it is and lay onto the roof in the order shown in ush with the outside edge of...
  • Page 8 Step 12 Step 10 Parts needed - Parts needed - Pre drill Pre drill hole hole Place a Window Cross (No. 23) against the At the back of the building, x the two Cover inside of the window. Position the frame Trims (No.
  • Page 9 Step 14 Step 13 Parts needed - & & Parts needed - & Pre drill Pre drill hole hole Remove the top rail of the door (No. 7) by Position the Door (No.7) within the door opening of unscrewing the two screws, one on each side the Door Gable (No.1) with equal spacing top and bottom.
  • Page 10 Step 15 Parts needed - & Pre drill hole Locate the Wooden Door Handle (No.16) onto It is ESSENTIAL that you apply wood the outside of the door. Fix in place by hand, treatment immediately after the building screwing through the door with the screw has been assembled.