Download Print this page
Mercia Garden Products 02DTSHAX05051W-V1-PEFC General Instructions Manual

Mercia Garden Products 02DTSHAX05051W-V1-PEFC General Instructions Manual

Advertisement

Quick Links

General Instructions
02DTSHAX05051W-V1-PEFC
5x5 Playhouse
BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed in the parts list provided.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a
Phillips screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and
a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
- Ensure you have enough time to build the product to ensure the building is water tight.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration
of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may
also occur during excessive dry spells due to natural processes. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is sprayed with water during
extended periods of hot weather and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually
to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot
guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a water-
proof treatment to prevent water ingress. Pressure Treated buildings - Require a waterproof treatment to
prevent water ingress. Log Cabins - Are supplied untreated and require a preservative and waterproo ng
treatment.
We also recommend treating the building prior to construction.
POSITIONING YOUR PLAYHOUSE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
We recommend a minimum space of 2m around a playhouse, away from any structure or obstructions
such as fences, garages, houses, overhanging branches, washing lines or electrical wires.
It is recommended that the position of the Playhouse is not in direct sunlight.
Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or
any hard surface.
BUILDING A BASE
Ensure the base is level and is built on rm ground, to prevent distortion, checking with a spirit level.
Refer to diagrams for the base dimensions. The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run o for water. It is
also recommended that the oor be at least 25mm above the surrounding ground level to avoid
ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
- Wooden base.
WARNING: Only for domestic use
Not suitable for children under 36 months due to
small gaps and danger of falling from heights.
To be used under direct supervision of an adult
Please retain product label and instructions for future reference
WARNING:
ONLY SUITABLE FOR DOMESTIC USE.
TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.
!
THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY.
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
ANY ADD ON OR ACCESSORY MUST BE FITTED ACCORDING TO
THE INSTRUCTIONS PROVIDED
CAUTION
Wood is a natural product and can change post manufacture. So despite every e ort being
made to ensure the materials used are cut and machined to a clean and smooth nish, care
must be taken when handling the product and preparing for use by your child.
Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a
smoother nish. Alternatively, call the customer service department who will be happy to
arrange replacement panels/parts.
x2
All buildings should be erected by
atleast two adults.
DO NOT ALLOW
CHILDREN TO ASSIST.
To prevent damage during
assembly, you MUST pilot
drill all screw holes and
Measure
ensure all screw heads are
countersunk.
2mm Drill bit
12mm CSK
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.
**Protim Aquatan T5 (621)
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the correct application of
Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and
alcohols: 2, 4, 6-trichlorophenol.
In all instances for assistance with your product, please contact customer care on :
01636 821215 or customerservice@merciagp.co.uk
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
.
For ease of assembly, you will
Winter = High Moisture = Expansion
need a tape measure to check
Summer = Low Moisture = Contraction
dimensions of components.
Screws & Nails
Bolts
To identify the
xings required
Measure
for each step use a
overall
under the
length
head
measuring tape.
www.merciagardenproducts.co.uk
P1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 02DTSHAX05051W-V1-PEFC and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 02DTSHAX05051W-V1-PEFC

  • Page 1 25mm above the surrounding ground level to avoid 01636 821215 or customerservice@merciagp.co.uk ooding. Mercia Garden Products Limited, TYPES OF BASE Sutton On Trent, - Concrete 75mm laid on top of 75mm hard-core.
  • Page 2 Take a look at the di erent playhouse options below which refers to the instruction lea ets required to build each option. Model Build Instructions Required 5x5 Playhouse With Half Glazed Door 02DTSHAX05051W-V1-PEFC (Playhouse) SI-002-001-0005 5x5 Playhouse With Half Glazed Door & 02DTSHAX05051W-V1-PEFC (Playhouse) Tower...
  • Page 3 Take a look at the di erent playhouse options below which refers to the instruction lea ets required to build each option. Model Build Instructions Required 5x5 Playhouse With Framed Door 02DTSHAX05051W-V1-PEFC (Playhouse) SI-002-001-0022 5x5 Playhouse With Framed Door & Tower 02DTSHAX05051W-V1-PEFC (Playhouse) SI-002-001-0023 02DTTWR6565-V1-PEFC (Tower) 5x5 Playhouse With Framed Door, Tower &...
  • Page 4 Take a look at the di erent playhouse options below which refers to the instruction lea ets required to build each option. Model Build Instructions Required 5x5 Playhouse With Boarded Door 02DTSHAX05051W-V1-PEFC (Playhouse) SI-002-001-0022 5x5 Playhouse With Boarded Door & 02DTSHAX05051W-V1-PEFC (Playhouse) Tower...
  • Page 5 Half Glazed Door Fascia Block - 28x28x340mm - QTY 1 02DTDP1SFHD594X1060-V1-PEFC FS2828-G-380MM 02DTDP1BD594X1060-V1-PEFC 02DTDP1HGD594X1058-V1-PEFC 02DTSHAX05051W-V1-PEFC 02DTSHAX05051W-V1-PEFC 02DTSHAX05051W-V1-PEFC Building Content (02DTSHAX05051W-V1-PEFC ) Wooden Door Handle QTY 1 PI-04-0024 Ply Door Stop QTY 1 Window QTY 1 PLY TRIANGLE AI-FW496X462-V1 L Bracket...
  • Page 6 Please retain product label and instructions for future reference Half Glazed Door Pack (02DTDP1HGD594X1058-V1-PEFC) Nail Bag Window Cross QTY 1 There may be extra screws present in the nail bag PI-04-0013 Felt Tacks x 60 16mm Screw x 3 Door Cross QTY 1 20mm Screw x 7 PI-04-0064 30mm Screw x 80...
  • Page 7 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 3 Step 1 Parts needed - & Parts needed - & & Pre drill Pre drill hole hole Position the Plain Gable (No. 4) and Plain Side Left (No.
  • Page 8 Please retain product label and instructions for future reference Step 5 Step 7 Parts needed - & Parts needed - Pre drill Pre drill hole hole Place the Ridge Bar (No. 9) in Fit the Fascia Block (No. 13) to the between the door (No.
  • Page 9 Please retain product label and instructions for future reference Step 10 Step 9 Parts needed - Parts Needed - Pre drill Pre drill hole hole At the back of the building, x the two Cut the Felt (No. 20) into 3 sheets and Cover Trims (No.
  • Page 10 Please retain product label and instructions for future reference Step 12 Parts needed - Pre drill hole Place a Window Cross (No. 23) against the inside of the window. Position the frame centrally to the window and x using 4x20mm screws. 4x20mm screws.
  • Page 11 Please retain product label and instructions for future reference Half Glazed Door Instructions Step 14a Parts needed - & & 02DTDP1HGD594X1058-V1-PEFC Pre drill Pre drill Step 13a hole hole Position the Door (No.22) within the door Parts needed - & opening of the Door Gable (No.1) with equal spacing top and bottom.
  • Page 12 Please retain product label and instructions for future reference Framed Door Instructions Step 14b 02DTDP1SFHD594X1060-V1-PEFC Parts needed - & & & Step 13a Pre drill hole Parts needed - & & Locate the Wooden Door Handle Pre drill (No.14) onto the outside of the door. Fix in hole Position the Door (No.22) within the door place by hand, screwing through the door...
  • Page 13 Please retain product label and instructions for future reference Boarded Door Instructions 02DTDP1BD594X1060-V1-PEFC Step 13c It is ESSENTIAL that you apply wood Parts needed - & & treatment immediately after the building Pre drill has been assembled. hole Position the Door (No.22) within the door opening of the Door Gable (No.1) with equal spacing top and bottom.
  • Page 15 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...