Download Print this page
Mercia Garden Products 02DTSHOA08066WBF-V1-PEFC General Instructions Manual

Mercia Garden Products 02DTSHOA08066WBF-V1-PEFC General Instructions Manual

8x6 double storey playhouse

Advertisement

Quick Links

General Instructions
02DTSHOA08066WBF-V1-PEFC
8x6 Double Storey Playhouse
BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed in the parts list provided.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
- Ensure you have enough time to build the product to ensure the building is water tight.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy
or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to natural processes. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of hot weather
and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to prevent discolouration
whilst in stock. To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a suitable preservative in accordance with the manufacturers recommendations.
Care must be taken to ensure the product is placed on a suitable base.
We recommended using a suitable protection for your playhouse. As the product is destined for use by
children, a water based treatment for childrens toys is ESSENTIAL.
We also recommend treating the building prior to construction.
POSITIONING YOUR PLAYHOUSE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
We recommend a minimum space of 2m around a playhouse, away from any structure or obstructions such as
fences, garages, houses, overhanging branches, washing lines or electrical wires.
It is recommended that the position of the Playhouse is not in direct sunlight.
Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or any hard
surface.
BUILDING A BASE
Ensure the base is level and is built on rm ground, to prevent distortion, checking with a spirit level. Refer to
diagrams for the base dimensions. The base should be slightly smaller than the external measurement of the
building, i.e. The cladding should overlap the base, creating a run o for water. It is also recommended that the
oor be at least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
- Wooden base.
WARNING: Only for domestic use
Not suitable for children under 36 months due to
small gaps and danger of falling from heights.
Please retain product label and instructions for future reference
WARNING
ONLY SUITABLE FOR DOMESTIC USE.
!
TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.
THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE
DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO THE INSTRUCTIONS.
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.
MAX AGE OF 14 YEARS.
THIS TOY IS FOR OUTDOOR USE ONLY.
USE A WATER BASED TREATMENT THAT IS EN71 TESTED
CAUTION
Wood is a natural product and can change post manufacture. So despite every e ort being
made to ensure the material used are cut and machined to a clean and smooth nish, care
must be taken when handling the product and preparing for use by your child.
Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a
smoother nish. Alternatively, call the customer service department who will be happy to
arrange replacement panels/parts.
x2
All buildings should be erected by
atleast two adults.
DO NOT ALLOW
CHILDREN TO ASSIST.
To prevent damage during
assembly, you MUST pilot
drill all screw holes and
ensure all screw heads are
2mm Drill bit
countersunk.
12mm CSK
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels
and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium
dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
In all instances for assistance with your product, please contact customer care on :
01636 821215 or customerservice@merciagp.co.uk
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
For ease of assembly, you will
need a tape measure to check
dimensions of components.
www.merciagardenproducts.co.uk
P1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 02DTSHOA08066WBF-V1-PEFC and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 02DTSHOA08066WBF-V1-PEFC

  • Page 1 In all instances for assistance with your product, please contact customer care on : 01636 821215 or customerservice@merciagp.co.uk TYPES OF BASE - Concrete 75mm laid on top of 75mm hard-core. Mercia Garden Products Limited, - Slabs laid on 50mm of sharp sand. Sutton On Trent, - Wooden base.
  • Page 2: Product Codes

    Take a look at the di erent playhouse options below which refers to the product code combinations used to create each playhouse. Model Product Codes 8x6 Garage 02DTSHOA08066WBF-V1-PEFC (Playhouse) SI-002-001-0017 02DTDP2SFD819X467-V1-PEFC (Garage Door Pack) 8x6 Playhouse 02DTSHOA08066WBF-V1-PEFC (Playhouse) 02DTWP2WPP-V1-PEFC (Window Pack)
  • Page 3 02DTSHOA08066WBF-V1-PEFC Please retain product label and instructions for future reference Look for the symbols and follow the safety guidlines below. Ensure screw heads are sub ush and Ensure the screws are 12mm gap sand down any xed squarely and do surrounding the splinters created.
  • Page 4 Please retain product label and instructions for future reference Garage Playhouse Garage Door Pack (02DTDPSFD819x467-V1-PEFC) Support Block - 27x70x793mm QTY 2 F2770-G-833mm (angled) Black Handle QTY 2 Roof Support Bar - 27x70x1707mm QTY 1 PI-07-0033 F2770-1707mm Hinge QTY 4 PI-07-0113 Roof Bearer - 28x28x1707mm QTY 1 FS2828-1707mm Door Trim - 12x45x974mm QTY 1...
  • Page 5 Please retain product label and instructions for future reference 8 x 7 Playhouse With Veranda Pre Assembly 02DTSHOA08066WBF-V1-PEFC 02DTWP2WPP-V1-PEFC Before assembling remove the transportation 02DTOAVP0801-V1-PEFC blocks from the bottom of each panel. Take care removing the blocks as to not damage...
  • Page 6 Please retain product label and instructions for future reference Step 1 Step 2 Parts needed - & & & & & Parts needed - & & 0 & Pre drill Pre drill hole hole Lay the Door Panel (No. 2) with the Fix the Window Blocks (No.
  • Page 7 Please retain product label and instructions for future reference Step 4 Step 3 Parts needed - & Parts needed - Pre drill Pre drill hole hole Place the Plain Panel (No.3) and the Place the Floors (No.1) ush to each other ensuring the Short Window Panel (No.5) on top of the framing is face up.
  • Page 8 Please retain product label and instructions for future reference Step 6 Step 8 Parts needed - Pre drill Pre drill Further secure the Bunk Floor (No. 6) hole hole Place the Bunk Floor (No. 6) onto the onto the horizontal framing of the horizontal framing of the Plain Panel Door Panel (No.
  • Page 9 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 9 Step 10 Parts needed - & Parts needed - & Pre drill Pre drill hole hole Locate the Plain Gable Top (No.11) on top of Locate the Safety Rail (No.12) on top the Plain Panel (No.3), and the Window of the bunk oor, ensure the safety...
  • Page 10 Please retain product label and instructions for future reference Step 11 Step 12 Parts needed - & & Parts needed - 20 & Pre drill Pre drill hole hole Line the Support Blocks Line the Roof bearer (No. 20) up with (No.18) up with the gable framing at the framing of the gable tops as shown 50kg...
  • Page 11 Please retain product label and instructions for future reference Step 16 Step 14 Parts needed - & & Parts needed - Pre drill Pre drill hole hole Place Roof Panel 1 (No.7) onto the To assemble the ladder, slot each Ladder Step (No.17) into the...
  • Page 12 Please retain product label and instructions for future reference Step 18 Step 20 Parts needed - Pre drill Pre drill Once the roof is tted and the building hole hole Place another Roof Panel 2 (No.8) onto is square, secure the building to the the front of the building, ensuring the Floor, using 50mm screws in alignment 50kg...
  • Page 13 Please retain product label and instructions for future reference Step 21 Parts needed - & & Pre drill hole Fix the Gable Cover Trims (No. 22) to the Window Gable Top (No.10) with 3x30mm screws per Trim. Fix the Cover Trims A & B (No. 23 & 24) to the corners of the building with 3x30mm screws per trim.
  • Page 14 Please retain product label and instructions for future reference Garage Playhouse Garage Door Instructions. Step 24a Parts needed - & & Pre drill Step 22a hole Position the second Garage Door Parts needed - Pre drill (No.36) to the left hand side of the hole 50kg door opening.
  • Page 15 Please retain product label and instructions for future reference Step 26a Parts needed - Pre drill hole Fit a black handle (No. 37) to each of the doors using 4x30mm black screws 50kg per handle. 8x30mm black screws. 30mm screw ** To nish constructing the playhouse, please skip to step 27 on page 18.
  • Page 16 Please retain product label and instructions for future reference Cottage Playhouse Window Instructions. Step 23b Parts needed - & Pre drill hole Step 22b Fix the Window Blocks (No. 46) to the Parts needed - Double Window (No.43) as shown with Pre drill 50kg hole...
  • Page 17 Please retain product label and instructions for future reference Step 25b Step 24b Parts needed - Parts needed - & Pre drill Pre drill hole hole Position the Window Crosses (No. 45) centrally Locate a Window Box (No.41) below within the Window frames. each front window.
  • Page 18 Please retain product label and instructions for future reference ** The following steps are required to nish constructing the Garage and Cottage playhouses ** **If you have purchased a ‘8x1 Veranda Pack’ Step 27 Parts needed - please continue from step 26c on page 20. ** Pre drill hole Cut the felt (No.34) into four strips of:...
  • Page 19 Please retain product label and instructions for future reference Step 28 Parts needed - & & Pre drill hole It is ESSENTIAL that you apply wood Fix the Fascias (No.25 & 26) to the treatment immediately after the building front and back of the building has been assembled.
  • Page 20 Please retain product label and instructions for future reference 8x1 Veranda add on Pack steps: Step 28c Parts needed - 40 Pre drill hole Locate the Cover Trims (No.47) Centrally over where the Window Panel (No.44) Step 26c and Door Panel (No.2) join. Parts needed - Pre drill hole...
  • Page 21 Please retain product label and instructions for future reference Step 30c Step 31c Parts needed - Parts needed - Pre drill Pre drill hole hole Position the Safety Rail (No. 50) on Position the Support Rail A (No.51) on top of the Veranda Floor (No.48) on top of the Veranda Floor (No.48), and the opposite side to the Door.
  • Page 22 Please retain product label and instructions for future reference Step 33c Step 32c Parts needed - Parts needed - Pre drill hole Pre drill Cut the felt (No.34) into four strips of: hole Locate the remaining Window Box (No.41) 2310mm (L) X 1000mm (W) onto the the Safety Rail (No.50) of the 50kg and place on the building in the order shown...
  • Page 23 Please retain product label and instructions for future reference Step 34c Parts needed - & & Pre drill hole Fix the Fascias (No. 25 & 26) to the It is ESSENTIAL that you apply wood treatment immediately after the building front and back of the building 50kg has been assembled.
  • Page 25 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...