1MRK 505 289-UUS B
and set the
communication, to
To enable GOOSE communication, the
function blocks (GOOSEBINRCV and GOOSEINTLKRCV) must be set to
application configuration.
To enable GOOSE communication via the front port the parameter
Configuration/Communication/Station communication/IEC61850-8-1/PortSelGOOSE must
be set to
must be set to
To enable IEC 61850 station communication:
1.
Enable IEC 61850-8-1 (substation bus) communication for port A and B.
1.1.
1.2.
2.
Enable redundant IEC 61850-8-1 communication for port A and B.
2.1.
7.12.1.3

Verifying the station communication

Connect a PC to the substation network and ping the connected IED and the Substation Master PC
to verify that the communication is working up to the transport layer.
The best way to verify the communication up to the application layer is to use a protocol analyzer
connected to the substation or process bus and monitor the communication.
Verifying redundant IEC 61850-8-1 communication
Ensure that the IED receives IEC 61850-8-1 data on both ports A and B. In the local HMI navigate to
Main menu/Tests/Function status/Communication/PRP Status/LAN1–A / LAN1–B and check
that both signals LAN1-A and LAN1-B are shown as
the ports A or B. Verify that either signal LAN1-A or LAN1-B (depending on which connection that
was removed) are shown as
the removed connection after completed verification.
Busbar protection REB650
Commissioning manual
OperationMode parameter to NonRedundant(A) or, for redundant
PRP(A+B) .
Front . To enable GOOSE communication via rear port the parameter PortSelGOOSE
LAN1 .
Set values for ETHLAN1_AB.
Navigate to Main Menu/Configuration/TCP-IP configuation/ETHLAN1_AB.
OperationMode , IPAddress and IPMask . OperationMode must be set to
Set values for
NonRedundantA .
Check that the correct IP address is assigned to the port.
Enable IEC 61850-8-1 communication.
Navigate to Main menu/Settings/General settings/Communication/Station
communication/IEC 61850-8-1.
Operation to Enabled and PortSelGOOSE to the port used.
Set
Enable redundant communication.
Navigate to Main Menu/Configuration/TCP-IP configuation/ETHLAN1_AB.
Set values for
OperationMode , IPAddress and IPMask . OperationMode must be set to .
Make sure that the optical fibres are connected correctly.
Error and that the other signal is shown as Ok . Be sure to re-connect
© Copyright 2013 ABB. All rights reserved
Operation parameter for the corresponding GOOSE
Ok . Remove the optical connection to one of
Section 7
Testing functionality
Enabled in the
GOOSE in Main menu/
GUID-0B7E64BC-3346-4105-90C0-2EA5A5BB74DE v1
63