If the machine is taken out of operation for a longer period of time,
various conditions must be met and maintenance work must be
carried out both before and after shut-down
'Measures prior to extended shut-down period' on page 99.
It is not necessary to define a maximum storage period if these
measures have been performed.
Reassemble all guards and protections.