Concerning your safety – Maintenance work
3.9.5 Measures for longer shut-down periods
3.9.6 After maintenance work
34
If the machine is taken out of operation for a longer period of time,
various conditions must be met and maintenance work must be
carried out both before and after shut-down
'Measures prior to extended shut-down period' on page 99.
It is not necessary to define a maximum storage period if these
measures have been performed.
Reassemble all guards and protections.
DRP45DX
Ä Chapter 8.11.5